Micro & Small DC Medium & Large DC Small DC Medium & Large DC
FusionModule500/800 FusionModule2000/5000 FusionModule1000A FusionModule1000B
Solution
Sub-
system
UPS2000-G UPS5000-E UPS5000-S FusionPower5000-S NetCol5000-A NetCol5000-C NetCol8000-C NetCol8000-E
iBattery
3-20kVA 20-160 kVA 50-600kVA 62 - 253kW 220 - 440kW
(1,200kVA) 21~46kW 30kW
Sustainable Growth, Powerful In The Industry
24.3%
19.5%
19.4% 19.90%
33.4% 35.80
8.5% 7% %
11.3% 52.0% 17.90
59.1% %
7% 10.8%
5.3% 7.20%
6.5% 13.0% 16.5% 10.90%
6.5% 8.30%
The shipment of container DC about 460 containers and it is NO.1 in the world in 2018,.
Have more successful case in the Latin America area, such as mexico FGR, mexico Altan, mexico IZZI, mexico SENASICA, Chile
ENPA, Chile CTR, Chile Claro, Chile Codelco, Chile WOM, Brazil Petrobras.
And also have more big container DC successful case in the world, such as mexico Altan*60 container, UAE Etisalat DC*81
container, UAE Dubai airport DC*23 container, UAE APOLLO DC*193 container, Bahrain Batelco DC* 84 container, Saudi Electric
Company * 50 containers and china Dongguan cloud BU DC * 189 container.
Main Successful Data Center Cases In Mexico
Mexico ALTAN - network site Mexico PGR- regional DC Mexico SENASICA- HPC DC
60*20ft AIO container, one stop solution 6 *container, one-stop solution one-stop HPC solution
Fast deployment and remote area fast deployment and high security Fast deployment and high security
Mexico IZZI– core network DC Mexico ITF Indoor DC Mexico PEMEX branch DC
Core network site, one-stop solution Modular DC solution, about 20 cabinets L1+L2 one-stop solution
3* container FM1000B and 3site Modular sign and Fast deployment 83 site * FM800 small smart DC
Remote area and fast deployment, TIER Ⅲ Design & Construction Certification Fast deployment and Unified management
Successful Data Center Case 70+ In Latin American Area
Mexico:
Colombia: Panama: 1. AT&T Modular DC
1. IFX Modular DC 1. Colon Safe city modular DC 2. Telcel modular DC
2. GTS Container DC 2. Panama city metro UPS 3. Altan 20ft AIO container
3. Digital Cannel Container DC
4. IZZI container DC
4. EPM Modular DC
5. CSN C5-modular DC
5. Buenaventura Port container DC
6. PGR-container DC
Peru: 7. PEMEX FM800
1. TLF Lince Modular DC: 1000 Sqm 8. IFT Modular (TIER3)
2. ONPE Container DC 9. AICM Modular DC
3. Azteca Modular DC 10. Semarnat Modular DC
4. Speedcas modular DC 11. Alestra-dc Integration & FM2000
5. Marcobre Container DC 12. Metro UPS project
6. UNCP DC 13. SENASICA AIO container DC
Chile: 14. HSBC UPS2000
1.Claro Cloud DC: 1000sqm 15. TEMSA Modular DC
2.Claro 3*container DC+ 2*modular 16. Inprotelecom modular DC
3. Claro 2*container+ 2* modular, 2 site Brazil:
4. CCB Bank Modular DC 1. TIM Modular DC
5. BOC Bank Modular DC 2. Sicoob Bank Container DC
6. Universidad Santa Maria Container DC 3. Petrobras Container DC
7. PF Container DC 4. VERT Container DC
8. ENAP Container DC 5. RNP Container DC
9.WOM container DC 6. Cherry Modular DC
10. VITACURA FM800 DC 7. Comigo Container DC
11. CTR container DC Argentina: 8. Gazin Modular DC
12. CEMIN container DC 1. EPEC modular DC 9. Mackenzie University Container DC
13. CODELCO container DC 2. MOS container DC 10. Açu Port Container DC
14. AMSA AIO container 3. BOC modular DC 11. Ferro Port Container DC
Professional UPTIME Service Organization and Capability
Uptime-certified
professional
staff
UPTIME TIER
Citification
Huawei data center facility Adapt to Diverse Scenarios
HQ Mid / large DC
Professional
Services Cooling tower
Indoor Solution Management
Cabinet modular
NetCol8000
In-room cooling
Consulting
Operational
Management
Chiller
Design MV distribution
Transformer
Battery & iBattery
IT Service
Management
Cabinet & rPDU
Implementation Generator
LV distribution
Modular UPS5000
DCIM: NetEco6000
IT O&M
Management
Operate PDU8000
Environment equipment Cooling system Power equipment Security equipment Firefighting & light
Infrastructure
Improve Management
Leakage T&H Smoke Access
Detection sensor sensor AC Chiller PDF UPS PDU control CCTV Fire fighting Lighting
FM2000 Smart Modular DC Solution with Intelligent DCIM
*
NetEco (optional) *
集
Mobile APP (optional)
Management System 团 for remote inspection
Rotating/
Sliding door
NO.1
Reliable
19.4%
+
Components: Module: System: Dual
33.4% iBattery intelligent
7% 1+1 N+X communication bus
redundancy monitoring
redundancy redundancy
10.8% Up to
13.0% 16.5% 97%
Modular UPS5000-S (50–600 kVA) 97.1% Efficiency: 1% improvement in efficiency≈ USD 30,030 savings in lifespan
HUAWEI S V A E Others
Efficient
OPEX OPEX
96% VS 97%
Up to CAPEX CAPEX
97%
Traditional UPS Huawei modular UPS Eg.: 400kVA, 40% load rate
Modular FusionPower5000-S (1,200 kVA) Traditional UPS Huawei modular UPS • Intelligent pre-alarm of
Simple
capacitor service life
• Pre-alarm of fan fault
VS
5 minutes Proactive prevention and easier O&M
8+ hours
6* 800kva 20* 800kva 2* 400kva 20* 200kva 130* 400kva
Huawei Intelligent Cooling Solution Meets All DC Scenarios
Small and medium DC Large data center temperature
temperature control solution control solution
Outdoor
unit Smart cooling
Outdoor indoor unit+
unit cabinet
Indoor unit + Chiller
cabinet
Pump
CRAH
Chillers
Weak power
cable trough
Fiber
Network
(1) Power cable (2) Signal cable (3) Optical fiber
cable
3rd
party
device 3rd
IP Access Leakage Smoke party
(optional)
PDF UPS rPDU PAC DG Camera Control Sensor sensor device
T&H
(optional) (optional) (optional)
Local PAD Smart Management System
Home Page:
Power, Temp.,
Space, Alarm
Cooling: Power:
Cooling Power chain
system &
AC status visualized
Environment:
T&H, Smoke, Alarm:
Water leakage,
Details of alarms
Access control
DCIM, Help Achieving Intelligent O&M of Data Center
The third party Unified gateway platform:
management system Standard northbound SNMP interface
3D
Alarm Report workflow
Visualization Unified Management Plat. Web browsing mobile terminal
ECC800
ECC500
Various access methods: WiFi/Z-Wave/ Zigbee /RS 485/SNMP…
……
MVDP LVDP
CR CC AC
Translate AH TV S
RPD Pump
Tow
Generator Modular Chiller
U er
Reference Other Project: Indoor 160 Racks And 800KVA
Huawei Data Center Solution Overview(Reference)
ITEMS Description
Architecture modular data center solution, dual row, cold/hot air containment with Fingerprint access control
IT Rack Total 160 racks, and 32 racks for each modular , basic type rPDU,42U, 2000x600x1200mm;
Modular UPS system 2N redundancy design, 480v/3p, 600kva modular UPS *2* 2 units.(50kva power modular, support hot swap )
Battery system LI battery and about 13mins backup time for each path.
Can monitor the power subsystem, cooling subsystem, environment subsystem, etc. and have report management, resource
Management system
management, and high level function ( IBAT, Mobile APP Management, PUE and Huawei pad).
Huawei Data Center Solution layout
Data Center Overview (Reference)
Data Center Overview (Reference)
Data Center Overview (Reference)
Data Center Overview (Reference)
Huawei Data Center Solution power diagram(reference)
Prefabricated Data Center Solution - Outdoor Scenario
https://youtu.be/znRhrZPuAVc
Prefabricated Modular DC Solutions Adapt to Diverse Scenarios
Prefabricated Integrated IT Solution Prefabricated Integrated CT Solution
Air-cooled IT data Chiller water-cooled IT data Air-cooled ICT equipment Air-cooled CT equipment
center solution center solution room solution room solution
Factory Prefabrication Pre-test before Delivery • Wide operation temp .: -40℃ to 55℃
First Modular Data Center Chicago and Dublin DCs Cloud DC in USA Prefab. DC in Sweden Perdix Container DC
Site Survey Planning & Design Civil Engineering Subsystem Installed One-at-a-time Commissioning Pilot Run Acceptance Test
20 month
676 Racks Colo@Middle East
Early Revenue
15 month 151.6M$
Generator &Chiller Generator &Chiller
SiteSurvey SitePreparing Foundation Concreting /Levelling
Foundation
Civil Preparation
Installation
35 month
More Predictable than Traditional Concrete and Mortar
VS
3.6m
Structure: 3600mm = Bottom 150mm + Raised Floor 300mm + IT Rack 2000mm + Cable Tray 1000mm + Top150mm
Reliable | Earthquake Simulation and Test Report – at least 9 Mercalli
Cabinets system: Intelligent cabinets system
eLight Indicator Multi-function POE Bus Circle
Sensor Fire Alarm
Alarm& Light Interaction Interaction Avoid Single Spot Failure
T&H, Smoke
• The color of indicator light can show the
alarm level: • Auto rotating skylight
• Red for critic alarm/ Yellow for major • A/C auto shutdown (settable) Smoke
• End door magnetic lock open iBAT
alarm Sensor
• Clear view on end door frame Access
Actuator iBOX
Cable Through PoE
Skylight
Actuator
Ring
• Dual cable through Circuit
design, power/signal/optic Lighting UPS
cable isolating Actuator
Master Server
Emergency
Gas
start/abort Switch
cylinders
Fire suppression system
Double Layer Cable Tray
Double Layer Cable Tray: signal cables and power cables are completely separated.
385mm 360mm
Signal cable
Signal
cable tray
Power
cable
Power cable
tray
3rd
party
device 3rd
IP Access Leakage Smoke party
(optional)
PDF UPS rPDU PAC DG Camera Control Sensor sensor device
T&H
(optional) (optional) (optional)
Exclusive Factory Acceptance Test Service: Witness Huawei Quality
POD7 POD6
POD5 Auxiliary building
(NOC、Office)
POD4
POD3
POD2 D.G system
POD1
(data center
Cloud Exchange DC
6 Nigeria 11 72 400 600 4.15M Tier IV design Certification
phase 1
IT Rack Total 156 racks, and 26 racks for each modular , basic type rPDU,42U;
Modular UPS system 2N redundancy design, 480v/3p, 600kva modular UPS *2* 2 units.(50kva power modular, support hot swap )
Can monitor the power subsystem, cooling subsystem, environment subsystem, etc. and have report management,
Management system
resource management, and high level function ( IBAT, Mobile APP Management, PUE and Huawei pad).
Huawei Data Center Solution layout
Huawei Data Center Solution layout
Data Center Overview (Reference)
Data Center Overview (Reference)
Data Center Overview (Reference)
Data Center Overview (Reference)
Data Center Overview (Reference)
Data Center Overview (Reference)
Huawei Data Center Solution power diagram(reference)
Huawei Practice
Award & Industry Recognized
Uptime Founding Uptime Tier III&VI Uptime Tier 4 Green Grid ECA
Member Certification Ready Contribution Member UK government
First batch
DCD DCD DCD DCD Edge DC
UPS Energy Star
Green DC Award Blueprint Award Innovation Award Innovation Award
Certification
Huawei Data Center Successful Case 1000+ In The World
HK Underground
Singapore Airport
Dubai Airport – Prefab DC 100 Racks, 1 MW, Tier Ⅲ
Overview
Dubai International Airport(DXB) is the largest civil aviation hub worldwide, more than 300 flights
taking off and landing everyday.
To meet rapid-increasing of data and airport business needs, Dubai Airport looked for a data center
solution which is reliable, fast deployed, energy efficient, smart and easy to expand
Dubai Airport planned to complete a new data center of 1 MW IT load & 10kW/rack within one year,
and its design & construction should follow UPTIME TIER Ⅲ standards
Huawei Solution
HUAWEI provided FusionModule1000B modular data center solution, including 23 prefabricated
data center modules, which can satisfy requirements of fast deployment and highly reliable
construction
HUAWEI provided advanced data center subsystems, including modular UPS UPS5000-E, in-row
A/C NetCol5000-C and smart management system NetEco6000
Benefits to Customer
Reliable: UPTIME TIER Ⅲ design & construct certification, reliability reaching 99.98%; high dust
and water proof performance and excellent ambient environment adaptability
Fast deployed: delivery within 10 months, saving 60%+ time compared with traditional DC
Energy efficient: PUE less than 1.65, saving more than 20% energy compared with traditional DC
Maintainable: smart management system making O&M easier and cost-saving
Easy expansion: prefab modular design, flexible expansion, saving initial investment
UAE Etisalat Al Ain Prefabricated Modular Data Center
To enhance the leadership of UAE ICT market, Etisalat UAE will build a new date center which will support colocation
business, public cloud, government-enterprise cloud and Hosting business in the city of Al Ain . This project is part of
ICT digital transformation strategy.
Demand and Challenges
The same experience of traditional building data center is expected.
Fast deployment, lower cost, and highest reliability.
4MW IT load with 6kW/racks, comply the UPTIME TIER Ⅲ TCDD and TCCF.
HUAWEI Solution
81 prefab-modules (FusionModule1000B) are stacked with three layers. Each layer is
4.15meter. All the modules are contained with decorated facade and steel structure.
Modules are prefabricated in factory and fast installed onsite with high quality.
Advanced data center subsystems are high efficient with Huawei modular UPS “UPS5000S”,
in-room CRAC NetCol8000C and NetEco the united one platform.
Benefits to Customer
Excellent experience : Unique design with elegant decoration, 2.6m clearance space in data
hall for colocation scenario.
Fast TTM: Save more than 13 months compared with the traditional data center.
Low TCO: Save CAPEX 15%, OPEX 20% less than traditional DC. Total ROI is 5 years
compared with 7 year for traditional building data center.
High Reliability: Customized stainless steel to extend lifespan up to 40 years with proper
routine maintenance.
Question List
1. How About The Project Plan For This New Data Center ? And Project Schedule?