a) Threat
b) Control
c) Risk
d) Vulnerability
7). is the process in which a team of people agrees to the severity of magnitude
of a Risk?
a) Consensus
b) Risk Formula
c) Intuition/Judgment
d) None of the above
8) Entrance and Exit criteria for each stage of testing could be documented in
a. Test design
b. Testing objectives
c. Test schedules and resources
d. Assumptions
9) Methods for preparing test data, backup and roll back procedures, high level data requirements
and data security issues will be specified at what section of the test plan
a. Test Resources
b. Test Data Management
c. Test Tools
d. Test Design
12) Which of the following test approaches is not a structured test approach?
a. Load/Stress
b. Operations
c. Regression
d. None of the above
15) Difficulties surrounding the introduction of tools can arise in three areas…
a) Organizational obstacles
b) Problems arising from the tools
c) Obstacles in the computer environment
d) All the above
16) ___ is the process by which product quality is compared with applicable standards.
a) Quality assurance
b) Quality control
c) None of the above
d) a and b
18) ____ is managerial desires and intents concerning either process or products
a) Standards
b) Procedure
c) Policy
d) None of the above
19) Procedure is step-by-step method followed to ensure that ______ are met
a) Requirements
b) Standards
c) Goals
d) Policy
22) To test two or more people accessing the same File, -------------------scripting is Used.
1. Pseudoconcurrency Scripting
2. Regression Scripting
3. Integration Scripting
4. Unit Scripting
26) The differences in testing software developed in-house and software developed by a
contractor
A) Training and deployment may be difficult
B) Extra features
C) Software fails to perform
D) All of the above
27) As the cost of testing ------------- the number of undetected defects -------------.
a) decreases ; decreases
b) increases ; increases
c) increases ; decreases
d) decreases ; remains same
e) remains constant ; decreases
a) WAN
b) LAN
c) (a) & (b)
d) None of the above
34) ___________is designed to determine whether the software is fit for use.
A. Usability testing
B. Acceptance testing
C. System testing
D. Security testing
40) At what section of Test plan will the following be covered : “Requirements for H/W and
S/W configuration, the location of Individual test events, defect tracking mechanism be used”
a. Test Environment
b. Test Design
c. Test Tools
d. None of the above
43) Detail information about the specific project component can be obtained by __
a) Project Status report
b) Summary Status report
c) Both
d) None of the above
45) -----------is a term used to quantify the total cost of failure, appraisal and prevention costs
associated with the production of software.
a. Production cost
b. Engineering cost
c. Development cost
d. Cost of Quality
46) --------------- means testing until the optimum point is reached, which is the point where the
cost of testing no longer exceeds the value received from the defects uncovered.
a. Cost of Quality
b. Cost-effective perspective
c. Both