You are on page 1of 1

N

21090 40000 LEGEND


ELV-300mm Cable Tray
SYMBOL DESCRIPTION
R

MP

D / W/P

MP

MP

WDR

ELV-300mm Cable Tray


R

MP

40
408 NPR

NVR
R6C12 R6C8 R6C7
R6C11 R6C10 R6C9

300
WALL MOUNT
15U 600X550
ELV IDF 7 2ND
R6C6

CCTV RACK

FLR NEAR
LIFT 1
MP
R
CK
RA D
TV 6 2N
CC IDF AR

3
V
EL R NE 3
FL LIFT
550

C1
600XOUNT
15U L M
WAL

R6

4
C1
R6

29260
1 24-05-2022 FOR APPROVAL H.S A.S.M

SR NO DATE DESCRIPTIONS BY ENG. CHECK

R6C5
CLIENT:
MP

15
R

R6 C CRYSTAL INVESTMENTS LIMITED

R6C4
PROJECT:

R6C3 MP
R
RESIDENTIAL BUILDING
(1B+G+4F+R)

DESIGN HEIGHT: G+4 FLOORS CONSTRUCTION: (1B+G+4F)&(24 TH)

DUBAI BLOCK NAME: JUMEIRAH VILLAGE PLOT NO.: JVC 11C MRP 100
DISTRICT 11

MAIN CONSULANT

P.O.Box 215960 Dubai, U.A.E


R5C

Tel: +971 4 239 5414, Fax: +971 4 239 5413


24

MAIN CONTRACTOR
R5C

MP

R
25

y
Tra
able
mC
00m
V-3
EL

R6C2
R5C

MP

R
300
26

CK
RA D
TV 2N
CC IDF 5
V AR
EL R NET 5
130

FL

MEP CONTRACTOR
LIF 550
600X UNT
15U L MO
WAL
0
197

FHC -6
20

R5C27 R5C28 R5C29 R5C30 R6C1

ELV CONTRACTOR

**Camera Height for Stair Case (2.5 Meter) / Drive Way (2.5 / 2.7 Meter) Note: PROJECT NO.:
P-22-91-20
**Lift Cable will be by Lift Contractor (Cat6) Inside Lift Cameras should be focus to the Door Opening including the Floor No. DESIGNED BY: W.LUTFY STRUC. ENG. : AYMAN

**Wall Camera Installation - 4x4 PVC Back Box Required in Wall (With Cover) ANPR System required for Building more than 50 Units ARCH. ENG. : A.MOHAREM M.E.P. : SALEM

**All Camera Type Changed to 120% (Zoom Verifocal Lens) PVC Conduit Considered for all Cameras in Corridors - 25MM/Each Camera
DRAWING. TITLE:
2ND FLOOR LAYOUT
**All Camera Type Changed to Recognition 50% Lens (As per Consultant) IP CCTV SYSTEM LAYOUT

**All Camera Type Changed to Monitoring 10% Lens DRAWING NO. : IP CCTV-104 DATE: JULY 2022

**2nd Floor Layout 85930


DRAWN BY: H.S CHECKED BY: A.S.M SCALE: 1/200 in A1

SERIAL NO. 229120-CCTV-5 REV.NO.:- 01