You are on page 1of 1

S.E.

LA NIÑA LA NIÑA TALARA PARIÑAS

L-2241

L-2250

L-2248
L-2162
2500 A
PIURA OESTE 220 kV

SA-8119
SA-6571

SA-6219

SA-3989

SA-6293

SA-2607

SA-6541

SA-2607
SB-8121
SB-6573

SB-6245

SB-3991

SB-6221

SB-3859

SB-6543

SB-3859
L-2160

220 kV
20 MVAR T15-261 T117-261 T32-261 T83-261
50/50/30 MVA 100/100/60 MVA 50/50/30 MVA 100/100/60 MVA

1250 A
TRF1 37.5 MVA
37.5 MVA TRF2
6.3kV
60 kV SS.AA. SS.AA. Cementos Piura
SB-6225 SA-6503 A

SB-6537 SA-6535

SB-3857 SA-2605

SB-6317 SA-6509

SB-6531 SA-6529

SB-3855 SA-2603

SB-6399 SA-6507

SB-3863 SA-3861

SB-6285 SA-6505

SB-6525 SA-6523
L-6658A B
L-6650

L-6651

L-6699
L-6698

L-6654
PIURA LA SULLANA PAITA CASTILLA PLANTA
CENTRO UNION ETANOL

AAAC 3x240 mm2


L105 (L-6657-A)
60 KV

10.8 km.
AAAC 3x240 mm2 49.6 km.
L105 (L-6657-C)

LEYENDA
SE0086 - Chulucanas

SE0306 - Santo Domingo-Chalaco I y II Fecha:


SISTEMA ELÉCTRICO DE TRANSMISIÓN Diciembre-2021

SE0307 - Huancabamba-Huarmaca Organ smoSupervisor de la InversiónenEnergía y Minería


Aprobado:
L.S.P
Revisado:
A.R.A.
Piura Oeste Dibujado:
A.R.A.
SISTEMAS ELÉCTRICOS VINCULADOS Escala: Lámina:
SE0086, SE0306, SE0307 A4 S/E