Government have issued orders to take up Resurvey Project in the entire State including
Agriculture Lands, Village sites in Gram Panchayats and also Urban Lands and the
programme is named as “YSR Jagananna Shaswata Bhu Hakku mariyu Bhu Raksha
Pathakam” vide G.O.Ms.No.352, dated 17.11.2020.
Since no report is received from the Teams, they were called to O/o the C&DMA on
14.06.2022 and instructed to prepare and submit SOPs on the subjects. The teams have
prepared SOPs and submitted. The details are as follows
The Teams have prepared and submitted the SOPs on the following activities.
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 2
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
INDEX
Page
Sl.No. List of Activities
No.
1 Title Page 1
2 Index 3
I Notification under Section under 5 & Section 6 of S&B Act, 1923 4
Constitution of teams for ward level / field level survey and for
supervision of quality check of the re-survey
(A) Ward Secretariat/Field Level Survey,
II 5
(B) Supervision/Quality check of the Re-survey,
(C) ULB Level Team and
(D) Mobile Magistrate Team
III Trainings 9
IV Field Verification /Purification of Land Records 12
V Publicity/Publication/Awareness 15
Demarcation of Boundary /Jurisdiction (ULB/Ward) & Map in KML
VI 16
formats
Ground Control Points identification, fixing and Integration with CORS
VII 17
Network.
VIII Identification/Demarcation of Government/ULB Land’s/Properties 19
IX Drone Flying 21
X Drone Data Processing & ORI Map 22
XI Quality check of ORI Map 23
XII Ground Truthing 26
XIII Record integration/Data Processing after Ground Truthing 28
Quality check by Supervisory Team of Ground Truthing done by Ward
XIV 29
Level Survey Teams
XV Ground Validation 30
XVI Data updation after Ground Validation 33
XVII Quality check of Draft Records 34
XVIII Statutory Notices Section 9 (2) & Section 10 of S&B Act 1923 35
XIX Appeal Phase 35
XX Data processing after appeal 36
XXI Preparation of Final Records and Notification 36
XXII Statutory Notification/Publication under Section 13 of S&B Act 1923 37
XXIII Distribution of Property Titles 37
- Forms and Notices 38-100
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 3
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
2. The AD (S&LR) of the respective Districts shall publish notification u/s 6 (1) of A.P. S&B Act,
1923.
(a) Assistant Director of Survey and Land Records, Inspector of Survey and Land Records,
Deputy Inspector of Survey, Town Surveyor
B. Publication of ULB-wise Notification for conducting the Resurvey in the respective ULB with
Date-wise Schedule.
1. Before conducting the Resurvey, the Municipal Council/Municipal Corporation, shall
conduct a Special Meeting and shall adopt a Resolution for conducting Re-survey of all the
Immovable Properties within the Municipal limits with the assistance of the officials of
Survey and Land Records, Revenue and other related departments.
2. After that, the Commissioner of the respective ULB, shall notify the ULB wise Schedule of
Resurvey, in the format prescribed by the CSS & LR (Appendix-1), covering the following
points:
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 4
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
ACTIVITY-II: CONSTITUTION OF TEAMS FOR WARD LEVEL / FIELD LEVEL SURVEY AND FOR
SUPERVISION OF QUALITY CHECK OF THE RE-SURVEY
I. Constitution of Teams for –
(A) Ward Secretariat/Field Level Survey,
(B) Supervision/Qualitycheck of the Re-survey,
(C) ULB Level Team and
(D) Mobile Magistrate Team
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 5
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
Surveyor/Mandal Surveyor.
• Provide the Revenue records and location of the Government properties. By
Coordination with ward planning and regulation secretary, Town
Surveyor/Mandal Surveyor.
• Fix the stones wherever required with coordination of ward planning and
regulation secretary
A. Town Planning Building Overseer/ Town Planning Supervisor/ Town Planning Officer
(Team Coordinator)
B. Town Surveyor
C. Municipal Revenue Inspector/Municipal Revenue Officer
D. Deputy Tahsildar/ Mandal Revenue Inspector.
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 6
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
A. TPBO/TPS/TPO Shall:
• Guide and supervise the team in respect of Verification of property details
in respect of Land use, building type, permission details of Land/ Building,
etc.
• Verify the records of building permission details, mortgage details, TDR
Bonds, Road winding gift deeds etc.
• Verify the disputed lands related to court cases etc.
• Quality check on purification of records, ORI, Ground Truthing, Ground
Validation, etc.,
• Certification of GIS data on the generated attributes.
Note: Based on the Classification of ULB the Team Size shall be decided by the
Executive authority of the ULB.
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 7
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
Note: 1. For Nagar Panchayats, Grade –I, II & III Municipalities, Supervisory Team
also act as ULB Level Team.
2. Based on the Classification of ULB the team Size shall be decided by the Executive
authority of the ULB.
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 8
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
ACTIVITY-III: TRAININGS
Quality check of the Re-survey
- Trained Master Trainers will impart training to the filed functionaries at ULB Level.
(Scheduled to be finalized)
Conventional Survey/ Town Survey: – Detailed training with hands on experience shall be
given to all the Team Members.
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 9
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 10
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 11
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
II. Ground level survey team and monitoring officers Survey team
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 12
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
1. Field Verification Register Proforma I. - most of the areas which includes private houses and
properties in village site in the municipality without having recorded data, The WARD
ADMINISTRATIVE SECRETARIES and WARDEDUCATION & DATA PROCESSING SECRETARIES shall
update Door NO , Assessment NO , NAME of the owner in the Register before conducting Resurvey
.Col. Nos. 9, 11 to16 must be updated by ward planning & 1 to 8 B, 10 regulation secretaries and
ward revenue secretaries
Form 31 B: Proforma. - 2 ) : Col. No. 1 to 33 information in respect of classification, areas are to
be entered in this proforma ward wise by EDUCATION& DATA PROCESSING SECRETARIES, WARD
PLANNING & REGULATION SECRETARIES andWard Revenue Secretaries, WARD PLANNING &
REGULATION SECRETARIES and got digitized.
POLR should be updated and digitized after field verification.
IV. Data should be collected and digitize the following 3 POLR Proformas
1) Form 16 A: Proforma-1 Town Survey Record Village Survey Record Desilization should be done
2) Form 16 B: Proforma-2 According to the Agriculture (Proforma-6) given to POLR, Proforma-16
should be desilized.
3) Form 16 C: Ground Truthing Worksheet for ULB Properties
“POLR ” Work Survey and other basic records in each municipality for verification And
Field Acquaintance.
Available Survey Records: -
Survey Basic Records: -
1. ORIGINAL MANUSCRIPT R.S.R./FLR/FA OF THE VILLAGE
2. VILLAGE MAP
3. F.M.B.’S OF THE VILLAGE
Detailed Town Survey Basic Record’s & Travel’s Data: -
1. T.S.R. [Town Survey Register]
2. Ward Map’s / Block Map’s
3. Assessment Register
4. Encroachment Register
5. Lay-out’s [Authorized Unauthorized list] Register
6. Asset Register
“ POLR ” is the process of digitizing available manuscript records duly updating ground
realties. Ward wise records are to be updated as under
1. Proforma –I: )Form-16) Verification of manuscript TSR / “RSR/FLR/FA: Data entry of all fields
in respect Assessment Survey Number / Subdivision and the area /has to be made registered
.in Proforma After completion of data entry all the fields are to be cross checked with manual
records once again.
Proforma –II: Verification of Digitized “RSR” with Adangal /Web Land Correction and
Update of Digitized Adangal with that of Digitized RSR (Sy. No. and Total Extent make them
as one and the same) .The entries in digitized RSR should be verified to matchwith survey
numbers andareas of the properties owners in Adangal. These registersare useful for
verification of agricultural lands during ground truthing and validation.
• Verification and Updation of Land Classification and Nature of Digitized Adangal with that
of Digitized “TSR/R.S.R.” / Physical TSR/R.S.R.
• Verification and Updation of Pattadar details [Aadhar, Mobile Number etc.,]
• Verification and Updation of Pattadar and Enjoyer details of Adangal.
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 13
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
The data validated through above steps are useful for quality check during Resurvey process.
• The work sheet in Form-16 is useful for Ground Truthing at the time of field verification.
• Details of houses and other structures and vacant plots existing in village sites and
habitation areas shall be entered in our available records i.e. property tax register with
the help of Block Map Survey Numbers and Door Number.
• Based on these records in the "ULB 's" conducted by the Detailed Town Survey, the details
in Form-16 are followed by RSR followed by TSR and then Assessment Register,
respectively. etc., should be entered sequentially in the computer.
• With the help of the door number in the property tax register according to the survey
numbers in the grama kantam, With the help of Block Map, a list of reported locations
will be compiled according to the survey number.
• As mentioned above, the POLR registered on the computer. The work is complete. The
work has to be done by the " Ward Survey Team " all together.
• In POLR Form 16, Digital Admin and EDPS should enter Col. No. 1 to 14, 21, 22 as per TSR
or RSR and Col. No. 15 to 20, 23 to be entered by Ward Planning Secretaries, Ward
Revenue Secretaries. With reference to data as per Field Data.
• Column No: 20, 21 by Ward Admin Secretaries.
• POLR Proforma-II (Form-16): For Agricultural lands, data finalized in POLR proforma 6
shall be considered to prepare proforma II
• POLR Proforma - II -Agriculture: Column No: 1 to 1 2 should be registered by the Ward
Planning Secretaries
• Column No: 13 to 27 to be registered by Ward Revenue Secretaries and Ward Admin
Secretaries
Note: Agriculture fields should follow the circular Proforma 1 to 6 given by Revenue Department
OTS under land conversion, Endowment, Waqif, Christian Minority, Inam, D-Form, SWLA, Home
Residence Assignment, LCC, LA, Hills, Government / Municipality and other lands Details
• The list of government lands should be examined as per 22 A Register.
• Municipal Street Survey Surveyors in FMB should also be registered in Government
Number
• Places of private houses in the village ghat and on the border (fully developed area)
• Land details of Agriculture Farmers ROR IB accounts should be scrutinized
• The original Aadhaar should be checked once to record the Aadhaar number and
phone of each farmer / graduate during the field inspection.
• Details of cases where there are any court cases should be listed in the field review.
• Details of Encroachments in Government lands should be listed properly.
• For filling Proforma–I, the details of Pattadars shall be entered as per entries
recorded in RSR/TSFR/FA/FLR and extents in Sq. MT’s/Sq. Feet and present
enjoyment details shall be noted as per facts on ground
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 14
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
A. The ULB shall take up wide publicity about the Re-survey of the immovable properties
i.e., land and building
• Display Gazette Notifications Published U/s 5 by CSSLR and U/s 6(1) by of AD(S&LR)
AP S&B Act,1923 and the Schedule of the Resurvey at conspicuous places like in the
notice board of the ULB, other offices like RDO/MRO, Registration Offices, Court
Premises, Post Offices, Banks, Institutions, Railway Station, Bus stands, Ward
Secretariats and other prominent places, like government offices, libraries,
community halls, etc.
• Schedule of Resurvey i.e., Locality wise and day wise schedule publish through Print
& Electronic media/ Social media& Out Door Display device at Prominent places and
post in households WhatsApp groups available with Ward Volunteers.
• Publicity through advertisements in local cable channels, local press etc.
• Display through banners and hoardings at conspicuous places, junctions, bus stations,
Railway stations and in front of Government offices etc.
• Arrange awareness rallies like 2K/3K/4K Run or Bike rallies involving all Stake Holders,
Ward Volunteers, Ward Secretaries, Tax Payers Associations, Colony Welfare
Associations, Builders Association, NGOs, etc.
• Mike announcements at different places through Mike sets about dates of drone
flying, ground truthing and purification of land records and announcement of ward
sabha at regular intervals.
• Distribution of Palmplets.
• Conduct Ward Sabha's
• Display on the website of C&DMA/DTCP/District Collectorate website.
• The Ward Volunteers shall be entrusted for service of the schedule to the property
owners under the supervision of Ward Administrative Secretaries and take
acknowledgement in Form – 1 from each and every property owner and keep the
same safely.
B. Publication of ULB Notice for Resurvey & Date-wise Schedule:
The Town Planning Section shall prepare notice for re-survey and day wise schedule in
the Annexure-1 and notify ward wise Schedule of Resurvey, Date-wise schedule in the
format prescribed, it should include
Identification of ULB Boundary, Revenue Ward Boundary (as required) and
plantation of stones at ULB Boundary,
Identification of Govt./Municipal lands, Layout Open spaces, Endowment Lands,
Irrigation canals, Nalas, Road margins, etc.,
Fixation of ULB & Revenue Ward Boundary and planting of stones,
Fixation of Government /Municipal/ endowment properities/ reserved layout open
spaced in ULB area and planting of stones,
Likely dates of drone flying, etc.,
Likely dates of Ground Truthing after Drone Flying.
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 15
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 16
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
Check and ensure the functioning and connectivity of the CORS Network in the flying
area using GNSS Rovers as per the check memo prescribed in Form-2
GCP is the reference point with respect to CORS Network base station. For Example: for
Tadepalligudem, CORS base station is situated at Nidadavolu.
Note: - 1) Try-Junction or Bi-Junction points, if converting for establishing GCPs for collecting Geo
codes of the survey stones (old) as check points with facilitate Geo-referencing of the
survey maps.
2) Further; collecting of some original field stone points as check points will also be useful
for developing Geo-referenced layers (a) survey maps/ward maps (b) ULB Boundary (c)
Drone generated ORI.
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 17
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
Other issues:
• To select the existing stones along Municipal boundary which are distinctly visible
on image captured by drone.
• The selected points shall be uniformly distributed at definite interval to test check
the Ortho Rectified Image (ORI) generated from drone images.
• GCP survey planning should meet the requirements of drone flying and processing
of drone image for accurate ORI generation.
• The following are important points that should be considered in GCP survey
planning:
• Mark locations of stones on the wards in Town map to ensure uniform distribution
of GCPs.
• At least 2 uniformly distributed GCPs are recommended including ORI quality check
points for each ward covering the entire municipal boundary.
• To ensure uniform distribution of GCPs, if stones are not available at the desired
location, typical checker board can be fixed to ground (as shown below). It is
important checkerboards should not be disturbed till drone flying is completed.
• In case of buildings where no setbacks are left, the terrace parapet wall corners
may be marked. In case of setbacks left by owners, the compound wall corners
may be marked.
• The objective is to create a visible feature on the area that is being flown. The GCP
should be visible on the image. If GCP points cannot be clearly seen in the drone
image, it cannot be accurately marked for processing.
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 18
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
B. The Town Planning Section shall update the Assets Register maintained and keep ready
updated Land Records such as RSR, Village Map, FMBs, POLR data, Street Survey
Record, Detail Town Survey record, Immovable properties records of ULBs, Approved
Layouts and approved RLPS and Prohibited properties list in Annexure - 22(A) of IGRS
web portal.
C. ULB/District level team(s) shall address all the departments concerned to nominate one
nodal officer duly authorizing him to attend for re-survey with relevant documents and
also finalizing the demarcation of the Govt./Municipal/Endowments Lands/Properties
of the outcome of the Survey.
D. Ward Planning Secretary Concerned shall issue Notice in Form – 5, intimation about
identification and demarcation of the Govt. Lands/Properties to the Departments
concerned and neighbouring Private Property Owners and shall obtain
acknowledgement from the authorized person from the departments and
neighbouring private property owners.
E. ULB shall publish public notice in Form – 6 for survey of the Govt./ULB/Municipal
land/properties in the notice boards of the respective Govt. offices and notice board of
the ULB and other prominent places like Ward Secretariats, Post Offices, and Banks,
MRO/RDO offices, etc., to attend the survey by any interested party.
F. In order to fix the boundaries both ULB as well as Govt./Municipal properties as per
check memo in Form – 2 has to keep ready for the functioning of CORS network and
GNSS Rover synchronizing to AP CORS by WP&RS and Operators.
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 19
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
In order to realize full potential of revenues of ULBs, Government issued orders vide
Circular Memo No.67205/A1/2005, Dt: 10-01-2017, directing the ULBs to levy Property Tax
in respect of Buildings constructed unauthorized in Private lands, Government Lands and
lands covered under Urban Land Ceiling Act, or any category of lands where the holder of
the Building does not possess any registered document or Patta from Revenue Department
(or) any other document, in support of proof of Title in respect of such land, with a penalty
of one hundred percent till such unauthorized construction is demolished or regularized
as per Sec. 85 (5) of A.P. Municipalities Act, 1965 and 220A (1) of Municipal Corporations
Act, 1955, with a saving clause that such levy of property tax, does not confer any
Ownership on the assesse over the said land where the building is constructed
unauthorized and that all such Assessments shall be given all types of Notices as “THE
HOLDER OF THE PREMISES”. Also, in some ULBs, prior to the issue of the above
instructions, similar constructions were assessed to Property Tax, flagging such
assessments as “Super Structure Tax”.
In either of the two cases, all such Properties may be treated as “Encroachments” made on
Government Land (or) Private Land and no Title shall be given to all such Properties during
the course of Re-survey.
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 20
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
Agency prepares flight planning for the drones to cover the whole ULB/Revenue
Village fully with reference to the Geo-referenced ULB/Revenue Village Maps.
The Agency team and Survey team has to check the total technical preparedness for
Drone Flying.
Total Technical Preparedness shall have verified by the town surveyor and town
planning officer or Resurvey nodal officer before Drone Flying.
ULB shall ensure to get necessary approvals from aviation/ Police departments for
Drone Flying.
Identify and record I-Base coordinates with reference to CORS Network.
C. The GCPs/ land marks data geo tagged by the Agency drone team to be forwarded to the
Agency production Centre using NIC net Broadband connection.
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 21
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
Feature extraction of major Topo details as per data model structure. Ortho image
is 2DX and Y parameters 3D for building heights in stereo vision.
Agency will superimpose the ULB Geo-referenced map *.kml over the ORI.
Vectorization of ULB boundary and whole ULB habitation with the data provided
by Survey Team (in red colour).
Agency will submit the ORI hard copy in Appendix-2 only after it meets all the
required accuracy standards.
Agency will provide the ORI hard copy dividing into tiles as work sheet, depending
upon the area of the ULB and density of land holdings, covering40Hect. (Ac.100)
for larger extent holdings, 20 Hect. (Ac.50) for smaller extent holdings in each tile
of A2 size paper. The tiles for ULB properties shall be relatively in the larger scale
(1:50/1:100 for Habitation area and 1:500 for open lands based on the intensity of
records) to demarcate the property boundaries clearly. Each tile shall be numbered
as T1, T2, T3 etc., and any key showing the relative position of the particular tile
shall be appended on each tile.
The record of the ORI delivery & receipt shall be maintained by both Agency
and S&LR Dept. with proper acknowledgements as per Form-11 & Form-12.
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 22
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
ORI Map will be provided by Agency for the purpose of verification on ground to assess the
quality of the ORI Map provided.
To gain the credibility of the stakeholders, the survey team shall test check the ORI given
by Agency
The Agency Survey Team, Supervisory Team and the ULB Level team shall jointly measure
6 or 8 prominent features per Sq. KM., like inner-to-inner culvert edges, width of C.C road,
bridges width, etc., of those features whose edges can be clearly identified on ORI and
ground.
The Ward Level Survey, Supervisory and ULB level teams are to be constituted by the
Commissioner of the ULB concerned as detailed hereunder.
The teams shall fix schedule for the verification and verify jointly w.r.t selected features at
different points covering the all parts of the ULB Area.
The features have to be measured with measuring tape / rover / ETS (Electronic Theodolite)
etc., on ground by Ward level team and the details shall be entered by WP&RS in part – A
of Form – 10 and ORI co-ordinates to be by supervisory team and arrive the variation, if
any, noted in Column No.9 of Form–10. And as per the yard stick status of the quality check
has to be marked in Column No.10 of that form.
all teams shall verify/measure jointly the ORI map by using Rover for Geo-coordinates w.r.t
Ground Controlling Points (GCP). The points selected shall be measured on ORI and
compare with Geo-coordinates arrived by using Rover and fill the data in Form-13. It should
be certified by the Supervisory teams.
Therefore, few points on the ground at random shall be selected and measured using Rover.
The same points shall be measured on ORI and compare both the data in Form - 13.
These prominent features shall be selected at random and uniformly distributed covering
entire ULB to test the ORI of the ULB as a single entity.
These features will be measured with measuring tape / rover / ETS etc., on ground and to
be noted in Form –10.
The variation in point position and the distance between two points should be within the
prescribed accuracy (±10 cm). If the variation exceeds, return the ORI to Agency for further
processing.
• Ward Revenue Secretary – Shall keep the land records connected to that
locality.
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 23
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
of the ORI map in co-ordination with other secretaries duly verifying the
boundaries already fixed on Ground and map.
• Ward Amenities Secretary – shall keep ready the details of the utilities and
infra in the locality for cross verification like drains, culverts, water pipelines,
electrical features, etc.
• Town Planning Building Overseer /Town Planning Supervisor /Town Planning Officer
• Accordingly prepare draft schedule for verification jointly with Ward level
teams & ULB level team and submit to the ULB level team for approval.
Composition of ULB Level Team:
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 24
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
• Finalize the schedule proposed by the supervisory team for joint verification.
• Shall act as Appellate Authority and take action as per the Act provision and receipt
and disposal of all appeals within the time frame.
Note:
1) No. of teams at ward level and supervisory teams shall be decided by the
Commissioner w.r.t staff available.
2) For Nagar Panchayats, Grade–I, II & III Municipalities, Supervisory Team also act as
ULB Level Team.
3) Based on the Classification of ULB, the Team Size shall be decided by the
Commissioner of the ULB wherever respective cadres are not available next below
level officer can be considered in the team.
The field measured data received by Agency from the ULB level team, the Agency
shall re-verify at production center for quality image check of the Ortho Rectified
Image (ORI) after processing the Drone image data.
Then the modified ORI map will be given to the concerned ULB by the Agency.
After receipt of the modified ORI Map, again the 3 teams have to re-verify the
modifications for conformity of the quality and if agreed to, submit for approval of
the Commissioner of the ULB concerned to take up ground trothing and validation.
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 25
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
i. The Updated PoLR data (hard copies) in Form – 16 along with the requisite Documents shall
be provided to the Field Level Survey Team along with the list of all issues pending at various
courts i.e. at Government, at CCLA, at District Collector, at Joint Collector, at Tahsildar, at
Supreme Court, at High Court and at Civil Courts etc.
B. Possession of equipment: The survey team shall have all necessary survey equipment namely,
GNSS Rovers, ETS, Chain, Measuring Tape & Cross staff etc.
C. Image quality check: To gain the credibility of the stakeholders, the survey team shall test check
the ORI given by in the presence of stakeholders.
D. Formal Notice: A formal notice in Form – 14 shall be issued as per entries in PoLR and served upon
every individual landholder and a general notice shall be issued in Form – 15 duly informing the
date of Ground Truthing duly inviting everyone to be present at their Land/Property, by obtaining
proper acknowledgement.
The survey team attends to the ground truthing by involving all Property Owners / Govt.
depts. / all stakeholders as per schedule, determines and records undisputed boundaries of
individual land parcels on ORI in the following steps.
A. Demarcation of every land parcel having permanent boundaries.
B. Demarcate and collect the Geo-cod’s data of the land parcels using Rover/ETS, for
the following cases as additional information: -
i. Missing or not visible boundary points on ORI
Wherever the Field boundary points are not distinctly visible in the
ORI, GNSS Rovers/ETS instruments shall be used to do field
measurement exactly (Ex: Orchard, bushes etc.). Geo-cod’s data of all
field boundary points will definitely be collected as additional
information. Form-18.
ii. At the time of Ground Truthing, application can be collected for Division of
joint Properties on requesting Form–19.
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 26
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
iv. Duly marking Land Parcels on ORI hard copy, make entry of that land parcel chalta
number in the hard copy of the ORI in the Appendix-2 as well as in the work sheet
of the PoLR in Form – 16.
v. Any variations observed with reference to the PoLR entries and enjoyments are
separately noted in the supplied PoLR worksheet (Form-16). Additional land
attributes of the respective land parcel to be noted in Form-17.
vi. All individual land/Property holding boundaries as shown by the Owners shall be
demarcated on ORI to reflect the true ground position of the individual land parcel.
All land holding boundaries must be properly demarcated.
• Whenever any land holder’s request is received in Form - 21 for boundary dispute, the
Survey team after making detailed enquiry by issuing Notices to effected party(s) in
Form-22, make a speaking order in Form-23, by deciding and determining the boundary,
under section 10(1) of AP, S& B Act. Such decided boundary shall be recorded and
marked on ORI hard copy & in Form-24.
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 27
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
• Updation of PoLR data, based on remarks received during Ground Truthing, by following
statutory procedure.
• The following documents will be provided to Agency
a. Marked ORI Hard copy (Appendix – 2)
b. Geo-cods of land parcel on decision u/s10 (1) during Ground Truthing (Form – 24)
c. Land parcel attributes (Form – 17)
d. Additional / missing information (Form – 18)
e. Quality check of demarcated marked copy of ORI – (ULB Level Team) (Form – 25)
f. Quality check of additional information –ULB Level Team (Form – 26)
g. Quality check of demarcated marked copy of ORI –ULB Level/ Mobile Magistrate Team
(Form – 27)
h. Quality check of additional information –ULB Level/ Mobile Magistrate Team (Form –
28)
B. Each LP number shall have the Geo Coordinates and its extent with corresponding Sy.no/Sub.div.
C. Details of all lands/Properties (with the name of the owner, etc.,) and all Govt. lands (with the type
of Govt. land, etc.) will be available.
D. The Agency and the data processing unit designated by A.P., shall integrate the Correlation
Statement (Form - 30) with Updated PoLR and generate LP. No wise records and also generate the
area comparison statement (Form – 29) of the ORI to the area recorded in the updated PoLR record
E. All the updated Data will be given to the Survey teams in two statements:
a) The first statement will be the updated PoLR duly showing all the Correlated land parcel
numbers, extent, etc. for each of the Sy.No. Sub- Division No.
b) The second statement will be a similar statement containing all the information of the
updated PoLR but will be LP No. Wise. This statement is the most important statement
which is being developed in the Web Land Gold document. Preliminary Field Register
(Form – 31 (L.P No. wise), Form – 32 (SY. No. wise)) will be generated by Agency using
the Web land gold and Field Attribute data.
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 28
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
A. The supervisory team shall select randomly the records covering all the locations of
the ULB not less than 20% of the records.
B. Then Supervisory team shall check the quality of the Ground truthing carried out as
per the prescribed process by CSS &LR. Not less than 20% records shall be verified
w.r.t Form - 16, Form 27 & Form – 28.
C. Such quality checked information shall also be checked randomly not less than 10%
by the ULB Level Team and Mobile Magistrate Team w.r.t Form - 16, Form 27 & Form
– 28.
D. All the additional information obtained during the Ground Truthing exercise, both in
the remarks of the POLR and ORI hard copy shall be 100% scrutinized by the ULB
Level Team and record variations in the form prescribed Form – 25, Form – 26.
E. Such quality checked information shall also be checked randomly by the Mobile
Magistrate team and record variations in the form prescribed (Form–25, Form–26).
F. On due certification, the marked ORI hard copy, POLR with remarks, Land Parcel
attributes data, additional / missing information data in the prescribed formats shall
be submitted to the District processing team. The same shall be submitted to the Sol
for data processing in acknowledgement Form – 12.
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 29
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
The following documents have to be kept ready by the ULB to take up Ground Validation
• A formal notice to all the private property owners in Form – 33A and a formal notice
to govt. dept.’s in Form –33B to attend for ground validation shall be prepared by the
field survey team coordinator and any one of the officer among the Supervisory team
authorized by the Commissioner to issue of notice shall issue notice mentioning the
date and time of the schedule.
• A general notice in Form – 34 to attend for ground validation shall be prepared by the
field survey team coordinator and the Commissioner/any authorized officer by the
Commissioner shall issue notice by conducting Ward sabha and display of this
information at conspicuous places and website of ULB / C&DMA / CSSLR and local
publicity by the beat of Tom-Tom and display on the notice board of the office.
• The field Survey team shall again visit each Land parcel with the concerned Property
owners / depts. / Stakeholders and confirm the Land parcel boundaries and Areas with
reference to the ORI map and ground both position of lat-logs and extent of the land
parcel. The team should be updated in the ORI map by evening of the same day and
prepare of Land Parcel Map (LPMs) of each parcel.
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 30
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
• For the Property owners who agree with the details, an appropriate format to be used
for taking acceptance in Form–49 Acceptance by the property owner.
• For Property owners who do not accept, area of the land parcel, measurements may
be done by GNSS (Global Navigation Satellite System) Rover. If still not agreed, it may
be done by using the Electronic Theodolite (ETS) machine. If necessary physical
measurements and area calculation may be done using conventional instruments
(Chain & Cross staff).
• For any other data where there is a non-satisfaction, appropriate action may be taken
under the provisions of Act, Rules, and G.O.s. All efforts should be made to resolve
the non-agreement except those, which are in court/revenue cases.
Additional information to be collected by the ULB Level team for the following
from survey team at ward level and supervisory team:
• Whenever any Landholder is not satisfied with the Ground Trothing information, as
per his request in Form - 21 for boundary dispute.
• The field Survey team has to receive all the appeals in the prescribed form, manually.
The acknowledgment shall be given the Landholder by the WP&RS concerned.
• The field Survey team i.e., WP&RS after making a detailed enquiry by issuing Notices
to the effected party(s) in Form-22 and obtain acknowledgement from the landholder
concerned in Form-22 (a).
• Then the field Survey team makes a speaking order in Form -23, deciding and
determining the boundary by the Supervisory Team and ULB Team, under
section10(1) of A.P, S & B Act. Such decided boundary shall be recorded and marked
on ORI hard copy & in Form-37.
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 31
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
i. The variations to be noted in the remark’s column provided for ULB Level Team (Form-35
&Form- 36) and similarly Mobile Magistrate Team.
a) Tahsildar / RDO
b) Dy., Inspector of Survey / ADSLR
c) Commissioner or his represent
Roles and Responsibilities:
• For taking decisions at ULB level regarding disputed properties / Objections Appeals
received from the Property Owners.
• The teams constituted at Supervisory Team and ULB Level Team check the ground
truthing, ground validation works of Survey teams and also the quality of records
generated to the prescribed percentage. Not less than 10% of the records shall be
verified.
• Such quality checked information shall be also checked randomly by the Mobile
Magistrate Team.
• On due certification, the records shall be submitted to the District processing team i.e.
Assistant Director of Survey and Land Records & Inspector of Survey.
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 32
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
A. Updation of all necessary records as per additional information received in Ground Validation
(Spatial Data)
The following documents will be provided to Agency for Updation
B. Updation of all necessary records as per additional information received in Ground validation in
the PoLR Data, by following due procedure and reflecting the same into the preliminary Field
Register.
i. Draft Land Register (Survey Register, Property Register, Assessment Register) (Form38)
ii. Draft Land Parcel Maps (Appendix – 4)
iii. DraftULB Map (Appendix – 5)
iv. Draft Correlation Map (Appendix – 6)
v. Correlation Statement (Form – 30) for Quality check.
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 33
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
1. Draft Land Register (Survey Register, Property Register, Assessment Register) (Form –38)
2. Draft Land Parcel Maps (Appendix – 4)
3. DraftULB Map (Appendix – 5)
4. Draft Correlation Map (Appendix – 6)
5. Correlation Statement (Form – 30)
A. Quality check of Draft Records shall be conducted at three (3) levels with Senior Officers for the
prescribed percentage.
1. Quality check of Draft Records by the ULB Team headed by Deputy Commissioner/Assistant
commissioner/Commissioner.
2. Quality check of Draft Records by the District Team headed by ADSLR.
3. Quality check of Draft Records by the District Team headed by RDDP and DIS.
B. QC Team shall verify.
1. Whether all the Govt. Lands are properly resurveyed and recorded in the records and in the
field. This is a special step to ensure that all Govt. lands are protected.
2. LPM with Ground status and Field Register with reference to PoLR Data. If any errors are
noticed, shall be processed for Updation of records.
3. Certification of the Draft Records wide check memos Form – 39 by the ULB Team, Form - 40by
the Divisional Team and Form – 41 by the District Team.
4. Updated records will be sent for the generation of 9 (2) / 10 (2) Notices.
Note: Random check of draft records not less than 30% by the ULB team, 20% by the district
team and 10% by the divisional team.
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 34
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
A. Receiving of Appeals:
Any Registered holder affected by a decision U/s section 9; any registered holder or any
other person who is a party to the dispute U/s 10 may file appeal U/s 11 in Form- – 44
to the appellate authority (mobile ULB Magistrate team) within 30 days from date of receipt
of such notice.
The System is being worked out to receive these appeal petitions in the Ward Secretariat
itself.
The mobile magistrate team shall have the necessary systems to receive the appeals, verify
each of the appeals, hear the pattadar / person, conduct an enquiry, field inspection and
issue speaking orders. A Computer Software will be in operation for the Registration of the
appeals, fixing of the hearing dates and field inspections and uploading of orders.
B. Disposal of appeals:
All the appeal petitions shall be disposed of within 30 days of the last date of filing of
appeals.
Thus, the total period for receiving the objections and their disposal is 60 days.
C. Orders of appeals:
The decisions / Orders (Form – 45) of the Mobile Magistrate team reflecting any changes
in the records have to be communicated in Form – 46for further Incorporation.
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 35
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
After the final Quality Check, the entire spatial records shall be submitted to data
processing team for Updation of this spatial data, wherever changes occurred during
redressal of Appeals.
The selected attributes will be attached to soft data in GIS software by the Data
Processing unit as provided in A ppe a l .
The Tahsildar will update Textual data by following statutory procedure and finalize the
Resurvey Land register.
A. The survey records and the land records have to be transferred to the newly created permanent
Data base of Survey and land records.
B. A Unique land parcel ID will be integrated into each parcel number which will become like Aadhar
number for each land parcel.
C. The following permanent survey and land records shall be prepared for final Notification by the
competent authority, Assistant Director S&LR.
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 36
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
A. The District Competent Authority shall prepare Final Check Memo in Form – 47verifying entire
Resurvey records
B. The District Competent; Authority shall notify completion of the survey of the ULB u/s 13 of S&B
Act in Form – 48. It shall include the unique ID number, the land parcel number, and the correlated
old survey, subdivision number. After the publication of u/s 13, the notified Survey and land record
shall become the permanent resurvey record and will be maintained in a newly created permanent
Database.
C. Any person aggrieved by the orders of the ULB Magistrate can prefer a civil suit as per the
provisions of section 14 of AP Survey and Boundaries Act within 60 days from the date of
publication u/s 13.
A. The Statutory procedure laid under BSO 34 (d) will be followed in effecting Changes in Revenue
Accounts as a result of Resurvey.
B. The Permanent Database shall be used to generate the necessary registers under the ROR Act / AP
Land Titling Act. Necessary notifications shall be made in this regard.
C. The new permanent database will have adequate integration of sub division /amalgamation of land
parcels, Registration / Succession and mutations so that the data is in a purified manner at all times.
The Unique ID of the Land parcel will also have the appropriate system so that all sub divisions /
amalgamations are properly accounted for.
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 37
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
ఫారం - I
రశీదు
(వారడు వాలంటీర్ ఇవ్వవ్లసినది)
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 38
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
FORM - 2
CHECK MEMO ON FUNCTIONING AND CONNECTIVITY OF CORS
NETWORK STATION
District: Municipality: Ward/Revenue Village:
1 Base Station Code
2 Date & time of Reporting
3 Status of Power supply
4 Functioning of Solar Panel
Status of internet
5 connectivityi). Broad Band
ii). GPRS
No. of satellites available at time
6
of inspection
7 Floating error recorded
General remarks on
8 Functioningof Base
Station:
Signature of WPRS
FUNCTIONING OF GNSS ROVER SYNCRONISED TO AP CORS
District: Municipality: Ward/Revenue Village:
1 Date & time of Reporting
2 GNSS Rover Registration Code
3 GPRS Service
4 GPRS Signal strength
No. of satellites available at time
5
of checking
6 Floating error recorded
General remarks on
Functioningof Rover:
7
Signature of
Operator
Designation:
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 39
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
Form - 3
NOTICE TO THE MUNICIPAL AUTHORITIES
To:
The ULB Authorities of
W.No & Name ………………………..
W.No & Name ………………………..
W.No & Name ………………………..
W.No & Name ………………………..
Ref:
1. With reference to the 6(1) notification RC No. , Dated under
Andhra Pradesh S&B Act,1923 issued by the Assistant Director, Survey & Land
Records
…………… District, you are hereby informed that the survey of Ward boundary of
Ward will commence on date………. at about ............AM/PM, be taken note
of.
2.You are further informed to attend the above survey to determine and record the
Ward/Town boundary, affording any and all such information render such assistance as
may benecessary to do so.
Place: Signature:
Date: Name:
Designation
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 40
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
Form - 4
PUBLIC NOTICE FOR FIXATION OF ULB/ WARD /REVENUE VILLAGE
BOUNDARY
1. With reference to the 6(1) notification RC No. , Dated under
Andhra Pradesh S&B Act,1923 issued by the Assistant Director, Survey & Land Records
District, it is hereby informed that the survey of Ward boundary of
Ward will commence on date at about AM/PM,
be taken note of.
2. It is further informed that any and all the interested party(s) to attend the above
survey to determine and record the Ward boundary, affording any and all such
information render such assistance as may be necessary to do so.
Copy submitted to the Assistant Director of Survey and Land Records, .Copy
submitted to the Commissioner of ,
Note: Display in Notice board in the office
…............................................................................... ..............................
Form-4(a)
Acknowledgement
I acknowledge the receipt of the notice dated: issued for demarcation
ofWard boundary of Ward Municipality in Form- .
Place Signature:
Date Name
Designation
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 41
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
FORM - 5
NOTICE TO THE CONCERNED DEPARTMENT
To
1) The Ward Revenue Officer
……………………. Ward (Revenue Village)
………………….…Municipality
………………………District
1. With reference to the 6(1) notification RC No. , Dated under Andhra PradeshS&B
Act,1923 issued by the Assistant Director, Survey & Land Records District, you are hereby
informed that the survey of all the Govt. lands in Ward will commence on
date………. at about ………AM/PM, be taken note of.
2.You are further informed to attend the above survey to determine and record the field boundaries,
affording any and all such information render such assistance as may be necessary to do so.
Town Survey
Classification Nature Nodal officer, Department
Number
Form-5(a)
Acknowledgement
I acknowledge the receipt of the notice dated ............... for field demarcation as per schedule mentioned.
Place Signature
Date Name:
Designation
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 42
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
FORM - 6
PUBLIC NOTICE FOR SURVEY OF GOVERNMENT LANDS
(NOTICE TO BE DISPLAYED IN NOTICE BOARD)
2 .It is further informed that any and all the interested party(s) to attend the above
survey to determine and record the field boundaries, affording any and all such
information render such assistance as may be necessary to do so.
Town
Classification Nature Nodal officer, Department
Survey
Number
FORM - 6(a)
Acknowledgement
I acknowledge the receipt of the notice dated:............. for field demarcation as per
schedule mentioned.
Place Signature
Date
Name
Designation
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 43
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
Form-7
Information of Ground Control Points
District :
Municipality :
Ward :
Coordinates
Sl. No. GCP ID Location Remarks
X Y Z
1 2 3 4a 4b 4c 5
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 44
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
Form - 8
GEO-CODS DATA OF THE WARD (REVENUE VILLAGE) BOUNDARY
Name of the District :
Name of the Municipality :
Name of the Ward (REVENUE :
VILLAGE)
No. of Trijunctions
No. of points
Geo code data observed to :
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 45
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
Form – 9
Quality Check of The ULB/ Ward / Revenue Village Boundary Demarcation by Supervisory Team
Name of the Municipality :
Name of the ward(Revenue :
Village)
No. of Trijunctions :
No. of points :
Geo code data observed to :
Co-Ordinates Co-Ordinates
Type of stone planted observed by the observed by the Difference Stone Inspection
Sl.N Location Ward team Municipal team
Point ID Remarks
o. Description
Appropriate
Trijunction Bijunction Rock mark/ In position /
X Y Z X Y Z X Y Z stone Planted
A-Class B-Class Others Out of position
Or Not
1 2 3a 3b 3c 4 5a 5b 5c 6a 6b 6c 7a 7b 7c 8a 8b 9
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 46
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
Form-10
QUALITY CHECK OF ORI SOFTCOPY VERSION BY FIELD LEVEL SURVEY TEAM
District: Municipality: Ward:
PART-A (To be filled by WPRS’s) PART-B (To be filled by SRI team)
Data measured at Field- Part(a) Data measured on ORI- Part(b)
Status
Photograph of Feature Distance in Distance in Difference in
Sl. No. Geo-Coordinates Screen Geo-Coordinates Accepted /
Feature location description Meter - Meter - Centimetres
Shot Not accepted
Centimetre Centimetre
X Y Z X Y Z
1 2 3 5a 5b 5c 5 6 5a 5b 5c 8 9 10
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 47
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
Form-11
Acknowledgement of ORI
(SSLR)
District: Municipality: Ward:
Submited by Agency
1 2a 2b 3 4
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 48
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
Form-12
Acknowledgement by AGENCY
Submitted by District HQ
1 2a 2b 3 4
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 49
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
Form-13
QUALITY CHECK OF ORI ON GROUND BY SUPERVISORY TEAM
District :
Municipality :
Ward (Revenue Village) :
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 50
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
FORM-14
NOTICE TO THE LAND HOLDERS FOR GROUND TRUTHING OF PRIVATE LANDS
Sy. No./
Khata/ Name of Land Holder Signature of the Land Holder
R.S. No./
Assessment
Town Number
Survey
Number
Place Signature
Date Name
Designation
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 51
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
FORM-15
PUBLIC NOTICE FOR GROUND TRUTHING OF PRIVATE LANDS
2 .It is further informed that any and all the interested party(s) to attend the above
survey to determine and record the field boundaries, affording any and all such
information render such assistance as may be necessary to do so.
Place Signature
Date Name
Designation
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 52
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
FORM 16 A - (PROFORMA - I)
PURIFICATION OF PROPERTY REGISTER (RESIDENTIAL) WARD NP / MUNICIPALITY / CORPORATION DIST.
EXTENT AC / Sq Ft / Sq Mts
ASSESSEMENT NAME OF THE PRESENT ENJOYER
RESIDENT OR NON-RESIDENT
MUNICIPAL DOOR NUMBER
RYOTWARI OR INAM
Sl No SURVEY REMARKS
, HOUSE SITE
SUB DIVISION
SUB-DIVISION
TS (OR) RS
Phone No
Adhar no
RS NO. MUNICIPAL REGISTER REVENUE REGISTER
TARAM
ASSESSMENT NO.
GOVERNMENT
MUNICIPAL
KHAT SQ NAME
ASSESSMENT
SQ
ACRES
NAME HA NAME FEE
NO.
MTS
NO. T
3 4 18
1 2 5 6 7 8 9 10 11 12 13 14 15 16 17 19 20 21 22 23
(a) (b) (a) (b) (a) (b)
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 53
1
Sl. No.
2
No. as per RSR
Sub Division, No as
3
RSR
4
Extent as per RSR
Total Extent
Land Nature as in
7
RSR
Land Nature as in
8
Webland Adangal
Land Nature
POLR Proforma-II (Agriculture)
(Broad Category)
Land Nature
10
(Sub Category)
Land Classification
11
as per RSR
WARDNO
Land Classification
12
as per Webland
Adangal
Land Classification
13
(Broad Category)
(Sub Category)
15
Khata No.
17
Patadar Name
FORM-16 B - (PROFORMA - IIAgriculture)
Father / Husband
18
Name
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
19
Mobile No.
20
Aadhaar No.
NP / MUNICIPALITY / CORPORATION
21
Patadar Extent
22
Enjoyer Name
23
Enjoyer Extent
DIST.
Enjoyment Nature
25
as per POLR
Remarks regarding
26
POLR by QC Team
Category(1 -POLR
27
Completed II -
Page 54
POLRInprogess
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
FORM-16C
GROUND TRUTHING WORKSHEET FOR ULB PROPERTIES
Tile No. TEAM
Municipality Code
Name of the Municipality
Name of the District
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 55
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
Election Ward No.
Ward Secretariat No.
11 Ward Number
Revenue Ward No.
Survey Ward No
12 Block No.
TS No
13 Town Survey Record
Extent as per Record
14 State Zone No.
15 Pin code
16 Building Application No.
17 Building Plan Approved/Not
18 Hgt_Bldg Height of the Building
Year of Construction of the building shall be captured in both
19 Age of the Building
the systems to calculate the depreciation value automatically
Cellars (No.)
20 No. Of Floors of the Building Ground Floor (No)
Others (No of floors, G+No 1, No 2..Etc)
21 Parking Area Yes/No
22 Floor No
23 Flat No
Owner Name
Gender (Male/Female)
Owner Occupation
24 Owner Details Owner Adhar No
Owner Ph. No
Owner E Mail Id
Father/Husband
Relationship with owner Father/
25 -
Mother/ Husband/ Wife/Tenant
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 56
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
Type of Occupier (Single/ Joint
26
Family)
27 If Joint (Name of the Joint Holder)
Present Enjoyer Name
Present Enjoyer Occupation
Gender (Male/Female)
Present Enjoyer Adhar No
Present Enjoyer Ph. No
28 Present Enjoyer Details
Present Enjoyer E Mail Id
Tenant Name
Tenant Gender (Male/Female)
Tenant Phone
Tenant Aadhar No
A)Inheritance/Purchase/Donation/Assignment by the
Government
Nature of Inheritance of the Award by the Govt.
29
property/Private. E.t.c B) Registered/Un Registered
C. Reg Document No
D. Document Extent
Nature of Land (Agriculture or
30
House)
A) Residential
B) Commercial
C) Religious (Temple, Masjid, Church)
D) Educational
31 Nature of usage
E) Medical
F) Apartment
G) Public use
H) Factories and Industries
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 57
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
I) Godown
J) Others (Hoardings, ATM,Cellphone_Towers, Bus_Shelters
Burial Ground.etc)
32 Layout Plan (Approved/Unapproved)
Plot No (LP Number/RLP /TLP Number/ILP)
Tax Exemption type
33 Extent Court Cases (Yes/No)
Date of Assessment
From Which Year House Tax being paid
34 Total Plinth Area in SQ Meters
A) Thatched house
B) Asbestos
C)GI Sheets
D) Tiled house
E) RCC Building
35 Classification Of Building F) Multistoried
G) Apartment
H) Vacant sites
I) Hut
J) Madras Terrace
K) Others
Document Type (Sale Deed, Will Deed, Partition Deed,
Succession Deed, Decree by Civil Court, Patta, Lease Deed,
Un Registered Document / Notarized Document
36 Vacant Land
Document No.
Document Date (DD/MM/YY YY)
Issued by
Slaughter_House
37 Public Infrastructure
Market_Yards (Included in Property Layer)
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 58
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
Parks
Landmark
Polling_Booths & Zone
Library
Play ground
Parks/Garden
Sport Complex/Stadium
Others
A) Government
H) Under Railways
I) Related Navy Authority
J) Under National Highway authority
K) Under Airport authority
L) Encroachments
M) Kabbjas
A) LCC Details
39 Other Property Details B)SWLA Details
C) Gen LA Details
Property Measurements Measurements
40 (Length/Width in Meters as on East :
Ground West :
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 59
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
North :
South :
-
Sketch as on Ground
41 Total Area (in Sq. Meters, Sq.Ft. &
Acres) :
45 Notes/Remarks
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 60
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
Form -17
LAND PARCEL ATTRIBUTES
Whether
Nature of Type of use Postal Address individual received
Temporary Extent Ac- Sy.No./RS/TS e-mail Remarks
LandUse noticeor not?
Land Parcel No. cts No.
1 2 3 4 5 6 7 8 9
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 61
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
Form-18
ADDITIONAL/ MISSING INFORMATION COLLECTED DURING GROUND TRUTHING BY FIELD LEVEL SURVEY TEAM
(GEO-CODS OF LAND PARCEL POINTS WHICH ARE NOT VISIBLE IN ORI HARD COPIES )
District: Municipality: Ward (Revenue Village):
Chalta No. LP Point / Topo detail Geo-cods
Sl. No. LP Point ID Remarks
(Temp No.)
X Y Z
1 2 3 4a 4b 4c 5
Note:
1) Point ID shall also be written on ORI
2) Additional data which is NOT recorded in Adangal / Survey Record shall be recorded.
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 62
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
FORM – 19
APPLICATION FOR DIVISION OF JOINT PROPERTIES
Address:
Phone No.:
Email ID:
Signature of the Applicant
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 63
YSR Jagannna Saswatha Bhu Hakku MariyuBhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
FORM – 20
APPLICATION FOR AMALGAMATION OF PROPERTIES
Address:
Phone No.:
Email ID:
Signature of the Applicant
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 64
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
FORM – 21
APPLICATION TO FILE OBJECTION WHILE DEMARCATING FIELD BOUNDARY
To
Sir/Madam
During demarcation, I raised objection for East/ West/ North/ South side of boundary of my
landholding.
Hence, I request to resolve my boundary dispute by referring documents/ survey records at the
earliest.
Yours Truly
Address
Phone No.:
Email ID:
FORM - 21(a)
Acknowledgement
I acknowledge the receipt of the application for objection while demarcating the field boundary by Sri
Claiming land in Sy.No./R.S.No./T.S.No: Ward: ,
Municipality: ,District: in Form- .
Place: Signature:
Date: Name:
Designation :
` Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 65
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
FORM - 22
The under signed has received Appeal / Objection during field survey in respect of
demarcation of field boundary in Sy.No.. /R.S.No./T.S.No Ward
Municipality District
Place: Signature:
Date: Name:
Designation:
FORM - 22(a)
Acknowledgement
I, acknowledge the receipt of the noticed dated: issued against the objection filed in
Sy.No./R.S.No./T.S.No , Ward , Mandal , District
Place: Signature:
Date: Name:
Phone no.:
Email ID:
` Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 66
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
` Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 67
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
` Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 68
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
Form - 24
GEO- CODS OF LAND PARCEL ON DECISION U/S 10(1)
District: Municipality: Ward(Revenue Village):
Effected Chalta
Name of the Dispute Decided Geo-cods of decided point GIST of the GIST of the
Sl. No. No. Remarks
Applicant Between Point ID of LP Dispute Decision
(Temp No.)
X Y Z
1 2 3 4 5 4a 4b 4c 7 8 9
Note:
1) Point ID shall also be written on ORI
2) Additional data which is NOT recorded in Adangal/ Survey record shall be recorded
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 69
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
Form – 25
QUALITY CHECK OF DEMARCATED COPY OF ORI
District: Municipality: Ward (Revenue Village):
Survey No/ Error at point ID/ New
Sl. No. Chalta Type of error * Remarks
Subdivision No. Point
No.(Temp
orary No.)
1 2 3 4 5 6
*1) missing points 2) Bend not considered 3) Bends not required 4) improper selection of boundaries
5) Selected cultivation bunds 6) Right of way not included 7) field channel not included 8) joint structure i.e.., well, pump sheds, etc.,
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 70
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
Form-26
QUALITY CHECK OF ADDITIONAL INFORMATION BY SUPERVISORY TEAM
District: Municipality: Ward(Revenue Village):
By Ward Team By Municipal team
Chalta No. LP Point / Topo detail LP Point / Topo detail Geo-
Sl. No. LP Point ID Remarks
(Temp No.) Geo-cods cods
X Y Z X Y Z
1 2 3 4a 4b 4c 5a 5b 5c 6
Note:
1) Point ID shall also be written on ORI
2) Additional data which is NOT recorded in Adangal/ Survey Record shall be recorded
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 71
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
Form - 27
QUALITY CHECK OF DEMARCATED COPY OF ORI
District
Municipal
Ward(Revenue Village)
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 72
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
Form-28
QUALITY CHECK OF ADDITIONAL INFORMATION BY
MOBILE MAGISTRATE TEAM
District: Municipality: Ward (Revenue Village):
Sl. No. Chalta No. By Field Survey Team By Supervisory team
(Temp No.)
LP Point ID LP Point / Topo detail Geo-cods LP Point / Topo detail Geo-cods Remarks
X Y Z X Y Z
1 2 3 4a 4b 4c 5a 5b 5c 6
Note:
1) Point ID shall also be written on ORI
2) Additional data which is NOT recorded in Adangal/ Survey record shall be recorded
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 73
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
Form - 29
Area Comparison Statement
District:
Municipality:
Ward (Revenue
Vilalge):
PoLR
Extent as Extent as per
SI.No. LP No. Survey/SD % of variation Remarks
per PoLR Re-Survey
No.
1 2 3 4 5 6 7
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 74
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
Form – 30
Correlation Statement
District:
Municipality:
Ward (Revenue
Vilalge):
Sl.No. LP.No. Old survey No. (Sy. Subdivision No. LP No. Extent Remarks
No./R.s.No./T.
S. No.)
1 2 3 4 5 6
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 75
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
(Work Sheet 31A) Field AcquaitanceProforma- I __________________________ NP/ Municipality / Corporation,_________ Ward No_______________________ Dist.
Classification
Doccument
No.(Partitio
Govern
Natureof n,
ment/
Town Total Dry / Wet Enjoyer Land(Resid Gift,
Sl. Town/ War R.S. Govt. Assessment Munici Mobile Aadhaar
Block Survey Exten / DoorNo Name Acres/SqFt / ential,Com Purchase Remarks
No. Village d No. / No. pal / No. No.
No. t Unassesse Sq mts mercial,Ind deeds(Or)
Ryotwa Private
d / Govt. ustries) Assigned/
ri or Lands
Porambok Alienatation
Inam /
u
1 2 3 4 5 6 7 8A 8B 9 11 12 13 14 15 16 17
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 76
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
(Work Sheet 31B) FieldAcquaitance(Classification)Proforma- II __________________________ NP/ Municipality/ Corporation_______________________ Dist.
Details as per Old &
Town Survey FIELD INSPECTION DETAILS
MPL.
PRIVATE(Patta)LANDS LANDS/OTHER GOVERNMENT PORAMBOKES
LANDS
En
CE
do
NT
OT OTHE w
Na R
HE R me
me AL LC
Clas R CU AW GOVE nt /
of OL IN TA GO EN C/ DAT
Na sific DEVE PRI LTI AS , RNME Wa
the Ex D DU OT NK VE CR As E OF
m Su a LOPE LA VA VA SIG ST RE BA UA N fq /
War T. ten VI V S HE S, R O ASS sig VER
Sl e b tion D YO TE AG TE NE RE RO SE RI W, T Chr
d/ S. t LL AC TR OP R RIV NM AC IGN n FIC Ot
of Di (Dry AREA UT LA RIC D D E AD R MI A TH SCHO isti Re
. Blo / Ac A A IA E MU ERS EN HM ME me A her
th vi / PRIV S ND UL BY AG T S, VE NI L OP O a mar
N ck R / GE NT L N NIC , T EN NT nt TIO La
e s Wet A DE S TU DR RIC SU DO FO N GR U L& n ks
o. (or) .S Sq SIT SI AR SI IPA VA RAI T HO & N nds
U io / TE TA , R Y/ TU RV NK RE G OU PO OFFIC Ma
Rev . M E TE EA TE L GU, LW HO USE Ot ON
L n Inam HOUS I GA E WE RA E A S ND RA E chi
enu N / S / SIT CA AY US S her GRO
B N Pora E LS RD T L Y T S MB BUILD n
e o. Sq NA E NEL S E Ext UND
o. mbo S E CR LA OK I ary
Vill Ft LA S Etc. S ent
k NS, OP ND ES NG Lan
age ,
e) ET LAND ds
LA
C S Ext
ND ent
S
Ac
Ac. Ac. Ac. Ac. Ac. Ac. Ac. Ac. . Ac. Ac. Ac. Ac. Ac. Ac. Ac. Ac. Ac. Ac. Ac.
Ac. Cts
Cts Cts Cts Cts Cts Cts Cts Cts Ct Cts Cts Cts Cts Cts Cts Cts Cts Cts Cts Cts
s
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 77
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
Form - 31
Aadhar Number
Land Parcel No.
Mobile Number
Pattadar Name
Postal Address
No./Block No.
Land Nature
Khata No.
Extent
e-mail
Remarks
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 78
1
Old Sy.No. and Subdivision No.
2
Ward / Block
District:
3
Town Survey No.
4
Land Parcel No.
5
Extent
6
Land Nature
7
Land Classification
8
Nature of Land
9
Source of Irrigation
Municipality:
Katha No.
10
Pattadar Name
11
Form - 32
12
Mobile Number
13
Field Register (Survey No. wise )
E-Mail
15
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
Postal Address
17
Ward:
Remarks
19
Page 79
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
FORM - 33 A
NOTICE TO THE LAND HOLDERS FOR GROUND VALIDATION OF PRIVATE LANDS
1. With reference to the 6(1) notification RC No. , Dated under
Andhra Pradesh S&B Act,1923 issued by the Assistant Director, Survey & Land
Records .............District, you are hereby informed that the Preliminary survey
records being generated and ground validation of following lands in
ward of municipality will commence on date………. at
about AM/PM, be taken note of.
2.You are further informed to attend the above survey to determine and record the
field boundaries, affording any and all such information render such assistance as
may be necessary to do so.
LP Number Survey Number Name of Land Holder Signature of the Land Holder
Place Signature
Date Name
Designation
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 80
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
FORM - 33 B
NOTICE TO THE Govt. DEPARTMENTS/INSTITUTIONS FOR GROUND VALIDATION OF
PRIVATE LANDS
1. With reference to the 6(1) notification RC No. , Dated under
Andhra Pradesh S&B Act,1923 issued by the Assistant Director, Survey & Land
Records ............... District, you are hereby informed that the Preliminary survey
records being generated and ground validation of following lands in
ward of municipality will commence on date………. at
about AM/PM, be taken note of.
2.You are further informed to attend the above survey to determine and record the
field boundaries, affording any and all such information render such assistance as
may be necessary to do so.
Name of
LP Number Category Signature of the Nodal Officer
Department/Institutions
Place Signature
Date Name
Designation
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 81
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
FORM - 34
PUBLIC NOTICE FOR GROUND VALIDATION OF PRIVATE PROPERTIES
Place Signature
Date Name
Designation
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 82
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
Form - 35
Additional/ Missing information found during Ground Validation of Land Parcel Maps
District:
Municipality:
Ward(Revenue Village):
Remarks
Error at point
Sl. No. LPM. No. Type of error
ID/New Point WPRS Team Municipality Division Team
Team
1 2 3 4 5a 5b 5c
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 83
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
Form - 36
Additional/Missing information found during Ground Validation in Field Register
District: Municipality: Ward:
Remarks
Aadhaar Number
Pattadar Extent
Mobile Number
Pattadar Name
Postal Address
Land Nature
Katha No.
E-Mail
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15a 15b 15c
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 84
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
Form - 37
Note:
1) Point ID shall also be written on ORI
2) Additional data which is NOT recorded in Adangal/Survey record shall be recorded
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 85
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
FORM-38 A
LAND REGISTER
1 2 3 4 5a 5b 6 7 8 9 10 11
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 86
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
NEW
NO
NAME O FTHE LOCALITY OR STREET
OLD NO. AS PER OLD REVENUE OR MUNICIPAL ACCOUNTS AS PER (NEW SURVEY) RE-SETTLEMENT
RESIDENT OR NON-RESIDENT
MUNICIPAL DOOR NUMBER
RYOTWARI OR INAM
TOWN SURVEY NO.
BY
TS (OR) RS
Sl No REMARKS
ASSESSMENT NO.
TARAM
RS NO.
GOVERNMENT
LPNO
MUNICIPAL
ASSESSMENT NO.
KH
SQ. METERS
S
AT NAME
ACRES
Q.
NAME HA NAME
FE
N
ET
O.
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 87
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
FORM – 39
QUALITY CHECK OF DRAFT RECORDS BY SUPERVISORY TEAM
CHECK MEMO
1 Name of the District
2 Name of the Municipality
3 Name of the Ward(Revenue Village)
4 No.of LPMs
a) Govt.Lands
b) Private Lands
5 Total Extent of Ward in Hec-are-sqm
6 All Land Parcels recorded in Resurvey or not
7 All LPMs Recorded in field register or not
8 All Govt.lands recorded in Resurvey or not
9 All PoLR entries Recorded or Not
Nos %
6 No.of fields inspected
a) Govt.Lands
b) Private Lands
7 No.of boundary demarcation verified
a) No.of lines with in allowance
b) No.of lines out of allowance
c) Remarks if any
8 No.of point Coordinates Verified
a) No.of points with in allowance
b) No.of points out of allowance
c) Remarks if any
9 No.of PoLR Registry(Pattadhar Name) Verified
a) No.of records found correct
b) No.of records found not correct
c) Remarks if any
10 No.of stones Verified
a) in position
b) Out of position
c) Missing
11 Status of Record (Good/Fair/Bad)
12 Remarks:
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 88
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
FORM – 40
QUALITY CHECK OF DRAFT RECORDS BY MOBILE MAGISTRATE TEAM
CHECK MEMO
1 Name of the District
2 Name of the Municipality
3 Name of the Ward(Revenue Village):
4 No.of LPMs
a) Govt.Lands
b) Private Lands
5 Total Extent of Ward in Hec-are-sqm
6 All Land Parcels recorded in Resurvey or not
7 All LPMs Recorded in field register or not
8 All Govt.lands recorded in Resurvey or not
9 All PoLR entries Recorded or Not
Nos %
6 No.of fields inspected
a) Govt.Lands
b) Private Lands
7 No.of boundary demarcation verified
a) No.of lines with in allowance
b) No.of lines out of allowance
c) Remarks if any
8 No.of point Coordinates Verified
a) No.of points with in allowance
b) No.of points out of allowance
c) Remarks if any
9 No.of PoLR Registry(Pattadhar Name) Verified
a) No.of records found correct
b) No.of records found not correct
c) Remarks if any
10 No.of stones Verified
a) in position
b) Out of position
c) Missing
11 Status of Record (Good/Fair/Bad)
12 Remarks:
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 89
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
FORM – 41
QUALITY CHECK OF DRAFT RECORDS BY DISTRICT TEAM
CHECK MEMO
1 Name of the District
2 Name of the Municipality
3 Name of the Ward
4 No.of LPMs
a) Govt.Lands
b) Private Lands
5 Total Extent of Ward in Hec/are-sqm
6 All Land Parcels recorded in Resurvey or not
7 All LPMs Recorded in field register or not
8 All Govt.lands recorded in Resurvey or not
9 All PoLR entries Recorded or Not
Nos %
6 No.of fields inspected
a) Govt.Lands
b) Private Lands
7 No.of boundary demarcation verified
a) No.of lines with in allowance
b) No.of lines out of allowance
c) Remarks if any
8 No.of point Coordinates Verified
a) No.of points with in allowance
b) No.of points out of allowance
c) Remarks if any
9 No.of PoLR Registry(Pattadhar Name) Verified
a) No.of records found correct
b) No.of records found not correct
c) Remarks if any
10 No.of stones Verified
a) in position
b) Out of position
c) Missing
11 Status of Record (Good/Fair/Bad)
12 Remarks:
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 90
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
Form - 42
NOTICE TO LAND HOLDERS u/s 9(2)
To,
………………………,
………………………,
………………………
The subjoined statement is an extract from the ……………………. Survey Field Register of ward .................,
giving particulars of the lands registered and surveyed in your name. Appeals, if any against the
surveyshould be presented within 30 days from the date of service of this notice to the Deputy
Inspector of Survey who stationed at the O/o Deputy Commissioner, .
Field maps may be had on application and payment of the prescribed fees through Ward Sachivalayam
which are, except in special cases Rs.50/- per map.
N.B: - No appeal will lie in pursuance of this notice in respect of boundaries decided during the present
survey under section 10(1) of Act, 1923.
Place:
Date:
Survey Officer
Land
Survey Sub-division Area Area Remarks
Parcel
number number or leter
number
Hc. Ares Ac. Cents Hc. Ares Ac. Cents
-1 -2 -3 (4a) (4b) (5a) (5b) -6
FORM - 42(a)
Acknowledgement
I acknowledge the receipt of the notice dated ............ issued u/s 9(2) of A.P. Survey & Boundaries Act,
1923.
Place : Signature
Date : Name
Designation
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 91
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 92
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 93
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
FORM - 44
APPLICATION FOR FILING
APPEAL u/s 11
To
The appellate Authority,
…………………..
…………………..
Sir/Madam,
I have received notice U/s 9(2)/10(2) that any person eff ected by the decision u/s 9 or 10 may
appeal to the prescribed officer.
In this connection, I have verified survey records and found that he variation
in………………………………… sides as per land parcel no. …………….
Hence, I request t o resolve my boundary dispute by referring documents/ land records/position at the
earliest.
Yours Sincerely,
FORM - 44(a)
Acknowledgement
I acknowledge the receipt of the appeal petition dated…… u/s 11 against the notice u/s 9(2) / 10(2)
served on Sri/Smt. Of Sy. No , Ward
, Municipality , District in Form-27.
Place: Signature
Date: Name:
Designation
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 94
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 95
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
1. Petitioner/appellant:
Note: Blue wash -area in dispute, area of disputed land Hectares-Ares / Ac.-cents.
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 96
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 97
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 98
1
Sl.No
2
Name of the District
3
Name of the ULB
4
Village
5a
Hec.
Ares
5b
Total Extent
Cts
Ac.
Sec(5)
7b
Sec 6(1)
Statutory
Notification
Reference of
7c
Sec (13)
Traverse
Ward MAP
8b
(Yes/No)
FORM-47
Total No of Land
8c
Parcels
FINAL CHECK MEMO
8d
Field Register
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
Fair Register
8e
Correlation map
Final Examination Report
8g
Quality Inspection
8h
Register of Areas
8i
Register of Newly
Date of implementation in
10
Municipal records
11
Remarks
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
Municipality:
Revenue Ward
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 100
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
YSR Jagannna Saswatha Bhu Hakku Mariyu Bhu Raksha
Standard Operating Procedure for Conducting Resurvey in Urban Local Bodies Page 101