MMES Construction

Project : AVIDA SERIN EAST TOWER3(ASET3)


Location : Tagaytay City
Work Schedule

Activity : Installation of MACROWALL

Day

10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
1
2
3
4
5
6
7
8
9
Per Floor man hour
1.0 Lay-outing/Pre installation inspection
2.0 Filling of mortar for ICC panels
3.0 Installation of dowels/drilling
4.0 Installation of ICC/EPS wall panels
5.0 Application of MAS coating 1
6.0 Application of MAS coating 2/including reinforcements
7.0 Clearing/Housekeeping
8.0 Inspection/Hand-over

Activity : Installation of WALLQRETE


Day

10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
1
2
3
4
5
6
7
8
9
Per floor man hour
1.0 Lay-outing/Pre installation inspection
2.0 Installation of WALLQRETE panels/including dowels
3.0 Jointing(vertical)/Filling
4.0 Application of PU sealant on seismic gap at terminations
5.0 Clearing/Housekeeping
6.0 Inspection/Hand-over
Prepared by : NSPineda