Macrowall Gantt Chart 28sep22
Macrowall Gantt Chart 28sep22
Day
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
1
2
3
4
5
6
7
8
9
Per Floor man hour
1.0 Lay-outing/Pre installation inspection
2.0 Filling of mortar for ICC panels
3.0 Installation of dowels/drilling
4.0 Installation of ICC/EPS wall panels
5.0 Application of MAS coating 1
6.0 Application of MAS coating 2/including reinforcements
7.0 Clearing/Housekeeping
8.0 Inspection/Hand-over
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
1
2
3
4
5
6
7
8
9
Per floor man hour
1.0 Lay-outing/Pre installation inspection
2.0 Installation of WALLQRETE panels/including dowels
3.0 Jointing(vertical)/Filling
4.0 Application of PU sealant on seismic gap at terminations
5.0 Clearing/Housekeeping
6.0 Inspection/Hand-over
Prepared by : NSPineda