2 Offloading Failure of equipment Workers & 4 4 16 H Pre inspections and maintenance Toolbox meeting 4 1 4 M Construction
aluminum& glass Incompetency of operatives must be carried out prior start of must be conducted Manager,
Materials operator uncertified involve in operations. by the supervisor Site
lifting tools and the in charge prior to Engineer,
Only certified and competent
tackles, improper aluminum the work execution Site
rigging and slinging works personnel can operate the cranes Supervisor
practices and equipment, banks man and and HSE
Fall of materials operator must be certified also in Officer
Toppling of crane their work.
induction and tool box talks are
required to give instructions and
lifting techniques, crane safety latch
must be serviceable at all times.
banks man and operators must be
aware to surroundings and
machines.
TPC-HSE-F- 02. Issue No.02 Rev. No. 00, Rev. Date – 01.05.2018L – Likelihood of Occurrence, S – Severity, RS – Risk Score, RL – Risk Level Page 2 of 10
م.م.شركة التوفيقوشركائهللمقاوالت ذ.
Al Tawfeeq& Partners Contracting W.L.L
TPC-HSE-F- 02. Issue No.02 Rev. No. 00, Rev. Date – 01.05.2018L – Likelihood of Occurrence, S – Severity, RS – Risk Score, RL – Risk Level Page 3 of 10
م.م.شركة التوفيقوشركائهللمقاوالت ذ.
Al Tawfeeq& Partners Contracting W.L.L
3 Working at Height Fall of persons and Workers & 5 4 20 Ensure a safe Working Platform Toolbox meeting 2 2 M
falling objects operatives H (scaffold with complete must be conducted 4
involve in components) is used for working at by the supervisor
the in charge prior to
height
aluminum & the work execution Construction
glass works Erection and dismantling of a Manager,
scaffold shall be done by the 3rd Site
party certified scaffolders Engineer,
Inspection of a scaffold shall be Site
carried out by a certified inspector Supervisor
(green tag for safe to use and red and HSE
tag for not fit for use) Officer
Scaffold inspection shall be done at
regular Intervals not exceeding
seven days since the last
inspection
Ensure work at height training for
workers by 3rd party accredited
company (as per QCS – Section 11
Part 1.3.1.9)
Ensure visual Inspection of a
scaffold is done by the users prior
to use – Don’t use it if any missing
components identified
Ensure safe access to a scaffold is
provided
Maintain three points of contact
while ascending/descending a
ladder
TPC-HSE-F- 02. Issue No.02 Rev. No. 00, Rev. Date – 01.05.2018L – Likelihood of Occurrence, S – Severity, RS – Risk Score, RL – Risk Level Page 5 of 10
م.م.شركة التوفيقوشركائهللمقاوالت ذ.
Al Tawfeeq& Partners Contracting W.L.L
5 Chemical handling Exposure to 4 4 16 H Review SDS prior to using Toolbox meeting 4 1 4 M Construction
TPC-HSE-F- 02. Issue No.02 Rev. No. 00, Rev. Date – 01.05.2018L – Likelihood of Occurrence, S – Severity, RS – Risk Score, RL – Risk Level Page 6 of 10
م.م.شركة التوفيقوشركائهللمقاوالت ذ.
Al Tawfeeq& Partners Contracting W.L.L
Construction
Workers & Close supervision must be provided Manager,
operatives Housekeeping shall be ensured Toolbox meeting
Site
involve in must be conducted
Slip, trip & falls before, during and after the Engineer,
7 Housekeeping the 3 5 15 H by the supervisor 3 1 3 M
completion of the work Site
aluminum & in charge prior to
Supervisor
glazing the work execution
and Workers
works
TPC-HSE-F- 02. Issue No.02 Rev. No. 00, Rev. Date – 01.05.2018L – Likelihood of Occurrence, S – Severity, RS – Risk Score, RL – Risk Level Page 7 of 10
م.م.شركة التوفيقوشركائهللمقاوالت ذ.
Al Tawfeeq& Partners Contracting W.L.L
Construction
Training should be provided for using the
Workers & Manager,
coupling. Toolbox meeting
operatives Site
Aluminum & glass Loose Coupling. • Use Proper PPE while working at must be conducted
involve in Engineer,
8 work - Conveying Material Spillage. 2 3 6 M heights. by the supervisor 1 2 2 L
the Site
Hose All material should be tightened to fix in charge prior to
aluminum & Supervisor
stand (both sides) to the transportation the work execution
glass works and Workers
truck than unloaded manually
Construction
Workers &
Toolbox meeting Manager,
operatives Hearing Protection shall be provided to
must be conducted Site
involve in protect operators from high noise
9 Working atmosphere Excessive noise 3 3 9 M by the supervisor 4 1 4 M Engineer
the environment
in charge prior to and Site
aluminum &
the work execution Supervisor
glass
11 Aluminum & glass - loss of load,load Workers & 4 3 12 M - Pre inspections and maintenance must be - hand signals to 2 2 4 M Construction
works: Mechanical slipping, falling, operatives carried out prior start of operations. be understand by Manager,
lifting operations dropping, crushing involve in - only certified and competent personnel can oprators, banks Site
- working with limb etc. the operate the cranes and equipment, banks man and Engineer,
mobile plant - exceeding machine aluminum @ man and operator must be certified also in operatives Site
- working with capacity glass works their work. - keep speeds Supervisor
cranes - machines and - induction and tool box talks are required to down to absolute and Workers
- unloading of personnel in close -crushes, give instructions and lifting techniques, crane minimum, all
aluminum & glass proximity, visibility bruises, safety latch must be serviceable at all times. movements to be
panels - failure mechanical pinches and - banks man and operators must be aware to well coordinated.
TPC-HSE-F- 02. Issue No.02 Rev. No. 00, Rev. Date – 01.05.2018L – Likelihood of Occurrence, S – Severity, RS – Risk Score, RL – Risk Level Page 8 of 10
م.م.شركة التوفيقوشركائهللمقاوالت ذ.
Al Tawfeeq& Partners Contracting W.L.L
Note:Meetings attendance records must be submitted by the assign supervisor to OH&S Department for record.
All Method of Work must be comply with to the approved Method Statement
All required Personal Protective Equipment must be worn (ear muff/ear plugs/safety shoes/safety hand gloves/safety eye goggles/helmet/traffic vest and others)
L- 1=Never had in the industry 2=Heard in the Industry 3=Occurred in the company 4=Several times per year in company 5= several times per year all locations (project/facility)
S- 1=Slight health effect / injury 2=Minor health effect / injury 3=Moderate health effect / injury 4= Major Permanent disability 5=Catastrophic LXS = RS
Risk Level– 1 – 2 = Low Risk (L) - The operation may start or proceed with continuous effort to improve
3-12=Medium
TPC-HSE-F- 02.Risk
Issue(M) - The
No.02 operation
Rev. should
No. 00, Rev. start
Date or proceed–ONLY
– 01.05.2018L whenofrisk
Likelihood reducing measures
Occurrence, are in
S – Severity, RSoperation.
– Risk Score, RL – Risk Level Page 9 of 10
15-25=High Risk (H) - The operation MUST not start. The hazard should be eliminated or its risk reduced to acceptable level immediately.
م.م.شركة التوفيقوشركائهللمقاوالت ذ.
Al Tawfeeq& Partners Contracting W.L.L
Name : Yassine Derbali (Technical Engineer) G.M Eng Mouaffaq Al Khaiat Mohamed Abdul Sattar El-Mowafy
(Project Manager)
Signature :