with the activities of the users of the structure. 2. Beams should be supported at least at one FALSE point, either by column or another beam, except for cantilever beams. 3. Most economic spacing for columns is 5.0 FALSE meters based upon the available reinforcing bar length of 8.0 meters. 4. Length of beam maybe uniform given that the FALSE depth is designed for the beam which carries the larges load. 5. is the minimum concrete thickness required to Concrete Covering protect reinforcing bars from corrosion thru water seepage 6. Continuous beams should be concentric with TRUE each other. 7. As much as possible, beams must be TRUE concentric with the column which supports it. 8. Column footing should be located at least 1.15 FALSE meters measured from the bottom of the footing to the natural grade line. 9. Tie beams should connect two columns and TRUE shall be placed above the column footing. 10. Column footing should be supported with a FALSE fine aggregate bed to counteract capillary action of water on soil