REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


REGIONAL OFFICE II
NUEVA VIZCAYA 2ND DISTRICT ENGINEERING OFFICE
DUPAX DEL NORTE, NUEVA VIZCAYA

C. Y. 2022 PROJECT
DETAILED ENGINEERING DESIGN PLAN FOR
CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE &
SEWERAGE/ RAINWATER COLLECTOR SYSTEM- RAINWATER
COLLECTOR IN PUBLIC FACILITIES
CLUSTER -1
a. DUPAX DEL NORTE NHS-SENIOR HIGH, BRGY. LAMO, DUPAX DEL NORTE, NUEVA VIZCAYA
b. INEANGAN BRGY. HALL, BRGY. INEANGAN, DUPAX DEL NORTE, NUEVA VIZCAYA
c. DUPAX DEL NORTE NHS POBLACION ANNEX, BRGY. MALASIN, DUPAX DEL NORTE, NUEVA VIZCAYA
d. DUPAX DEL NORTE CENTRAL SCHOOL, BRGY. MALASIN, DUPAX DEL NORTE, NUEVA VIZCAYA
e. MALASIN BRGY. HALL, BRGY. MALASIN, DUPAX DEL NORTE, NUEVA VIZCAYA
f. INABAN ELEMENTARY SCHOOL, BRGY. INABAN, DUPAX DEL NORTE ,NUEVA VIZCAYA
g. DUPAX DEL SUR MHO, BRGY. DOPAJ, DUPAX DEL SUR, NUEVA VIZCAYA
h. BRGY. DOMANG COVERED COURT, BRGY. DOMANG, DUPAX DEL SUR, NUEVA VIZCAYA
i. DUPAX DEL SUR CENTRAL SCHOOL, DUPAX DEL SUR, NUEVA VIZCAYA
j. PALABOTAN ELEMENTARY SCHOOL,BRGY. PALABOTAN, DUPAX DEL SUR, NUEVA VIZCAYA
k. PALABOTAN BRGY. RHU, BRGY. PALABOTAN, NUEVA VIZCAYA
l. MANGAYANG ELEMENTARY SCHOOL, BRGY. MANGAYANG, DUPAX DEL SUR, NUEVA VIZCAYA
m.SITIO TANIBONG - MANGAYANG COVERED COURT, BRGY. MANGAYANG, DUPAX DEL SUR, NUEVA VIZCAYA

SUBMITTED: RECOMMENDED: APPROVED:

EDISON C. BASILIO PERFECTO E. URBAN, JR. MARLYN G. INGUILLO


OIC, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
SECTION DATE: DATE:
DATE:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE II
NUEVA VIZCAYA 2ND DISTRICT ENGINEERING OFFICE
DUPAX DEL NORTE, NUEVA VIZCAYA

C. Y. 2022 PROJECT
DETAILED ENGINEERING DESIGN PLAN FOR
CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE &
SEWERAGE/ RAINWATER COLLECTOR SYSTEM- RAINWATER
COLLECTOR IN PUBLIC FACILITIES
a. DUPAX DEL NORTE NHS- SENIOR HIGH, BRGY. LAMO,
DUPAX DEL NORTE, NUEVA VIZCAYA

APPROVED:
SUBMITTED: RECOMMENDED:

EDISON C. BASILIO PERFECTO E. URBAN, JR. MARLYN G. INGUILLO


OIC, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
SECTION DATE: DATE:
DATE:
INDEX OF DRAWINGS
ARCHITECTURAL
A 01 COVER PAGE

04
PERSPECTIVE
A 02 PROJECT LOCATION MAP
04 SUMMARY OF QUANTITIES
VICINITY MAP
SITE DEVELOPMENT PLAN
INDEX OF DRAWINGS
ISOMETRIC VIEW OF HOR. RAINWATER TANK
A 03 DETAILED PLAN OF STAINLESS STEEL HOR.
04 RAINWATER TANK

DETAILED ISOMETRIC SECTION OF STAINLESS


A 04 STEEL HOR. RAINWATER TANK
04 DETAILED ELEVATION OF STAINLESS STEEL
HOR. RAINWATER TANK

PICTURE No. 1: SHOWING


PROPOSED LOCATION OF THE
RAINWATER COLLECTOR SYSTEM. PA
P -M
AL
-W
AN Tadji
G-B
Babadi IN
-TA
D-R
Bellet
UN
Antutot RD
. Alamidin
Pangawan Macalong
Binogawan
Balangabang Papaya
Sayoong Kongkong
NV-BENGUE Wangal
T RD.
Monaliza Kinalo Watwat
Victoria
BA
M-K Malabing
Kayapa Gabut
AS Alloy
Mabasa -Q
UE
Menchita Darapidap Lamo
Dupax -SO
LR
D.
Odom Aritao Del Norte
DM-JCT. MALASIN RD.
-N AG
RD.
Kirang Malasin Kasibu VICT
-MAD

Pingkian Manga JCT.

Inaban Bitnong Biyoy


Lobo Banganan
Nagcuartelan Cutar Munguia Pudi Siguem
Katarawan
Baan Dupax Lupa

JCT. NAT'L-BIT-BEL-NV
Dine

A
Pacquet

LIK
AR
Latar Del Sur Bua

AH
Bone N.

M
Muta

G
AN
DA
Calitlitan Bone S. ARITAO-QUI
RINO RD.

Cabulog Beti Makiboy


Oyao

RD.
Mag asawang Yaway Mantata
Salacsac kahoy Macabenga Macate
Anayo
NV-P
Malico
Consuelo Balite Santa Clara
ANGA
SINA Santa Fe
N RD Villaflores Baliti
Baracbac
.
Canarem Belance
Imugan Mangauit
Canabuan

1 PERSPECTIVE Tactac
Dalton
Binuangan Yabbi

A 2 SCALE: Nts. NORTH

Abaca
New Gumiad

Umubi
Pelaway
3 KEY LOCATION MAP
Lipuga
Gadeng
A 2 SCALE: Nts.
Taan

Cauayan

SUMMARY OF QUANTITIES Abuyo


Sitio Dinep

ITEM QUANTITY
DESCRIPTION UNIT
NO. Alfonso
Castaneda
PART I. FACILITIES FOR THE ENGINEER Lublub
Marikit
A.1.4 (1) Provisions of Progress Photographs 0.33 Months PAN-CANILI-BASAL-BALER RD.

PART II. OTHER GENERAL REQUIREMENTS


B.5 Project Billboard / Signboard 2.00 Each
B.7 (1) Occupational Safety and Health Program (PPE, Safety Personnel and Signage) 0.33 Months
B.9 Mobilization/Demobilization 1.00 L.S.
PART III. CIVIL, MECHANICAL, ELECTRICAL AND SANITARY/PLUMBING WORKS
PART A. EARTHWORKS

ROAD
803 (1)a Structure Excavation 0.80 cu.m
3 ST
ORE
804 (4) Gravel Fill 0.80 cu.m WAL
Y SC
HOO
K WAY L BL
DG.
PART B. PLAIN AND REINFORCED CONCRETE WORKS
900 (1)b1 Structural Concrete (Class A, 14 Days) 1.20 cu.m
PART D. PLUMBING/SANITARY WORKS 2 VICINITY MAP
1001 (9) Strom Drinage and Downspout 1.00 L.S. A 2 SCALE: Nts.
4 SITE DEVELOPMENT PLAN
A 2 SCALE: Nts.
1002 (27) Plumbing Fixtures 1.00 L.S.
PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C. Y. 2022 PROJECT PERSPECTIVE RHUELLE VALENTIN T. JANER
REGIONAL OFFICE II DETAILED ENGINEERING DESIGN PLAN FOR PROJECT LOCATION MAP ARCHITECT II
NUEVA VIZCAYA CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ A 2
SUMMARY OF QUANTITIES REYNALDO V. RAGASA, JR. EDISON C. BASILIO PERFECTO E. URBAN, JR. MARLYN G. INGUILLO
SEPTAGE & SEWERAGE/ RAINWATER COLLECTOR SYSTEM DESIGNED:
2ND DISTRICT ENGINEERING OFFICE VICINITY MAP ENGINEER II OIC, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
- RAINWATER COLLECTOR IN PUBLIC FACILITIES 2 4 4
DUPAX DEL NORTE, NUEVA VIZCAYA a.DUPAX DEL NORTE NHS-SENIOR HIGH, BRGY. LAMO,
SITE DEVELOPMENT PLAN JIOVANNI RUPAC - DANGAN SECTION
DUPAX DEL NORTE, NUEVA VIZCAYA INDEX OF DRAWINGS ENGINEER II (CTO BBBP) DATE: DATE: DATE: DATE:
NOTES:

1. TANK SHOULD BE FIRM, FLAT & ON STABLE PLATFORM IN ACCORDANCE


WITH MANUFACTURER'S RECOMMENDATIONS. TANK BASE UNIT MUST BE
SUFFICIENT TO SUPPORT WEIGHT OF TANK WHEN FULL.

2. 100% OF ROOF AREA SHALL DRAIN TO THE TANK.

3. IT IS RECOMMENDED TO CONNECT THE FOLLOWING HOUSEHOLD


FIXTURES TO THE RAINWATER TANK SUPPLY:
- ALL OUTDOOR TAPS
- ALL TOILETS
- WASHING MACHINE (COLD TAP)

4. ALL PLUMBING WORKS SHALL BE UNDERTAKEN BY A LICENSED PLUMBER


WITH THE CONSENT OF THE MANUFACTURER & IN ACCORDANCE WITH ALL
STANDARDS, CODES & REGULATIONS.

5. TANK & PUMP SHALL BE INSTALLED ACCORDING TO MANUFACTURER'S


REQUIREMENTS.

6. ANNUAL RAINFALL = 4464.90mm (ACCORDING TO THE HIGHEST


CLIMATOLOGICAL NORMAL RECORDED BY THE PHILIPPINE ATMOSPHERIC,
1 ISOMETRIC VIEW OF HOR. RAINWATER TANK GEOPHYSICAL AND ASTRONOMICAL SERVICES ADMINISTRATION (PAGASA).
A 3 SCALE: Nts.

PVC PIPE, Ø75mm, S-1000 (COLLECTOR PIPE FROM GUTTER)

PRE-PAINTED GUTTER (GA.


24) w/ SCREEN ON TOP.
RAIN HEAD, SLOPED SCREEN DIVERTS DEBRIS.
PVC PIPE, Ø100mm, S-1000.
TANK ACCESS.
AIR RELIEF VENT w/ INSECT SCREEN.
WALL / COLUMN OF EXISTING BUILDING

OVERFLOW PIPE w/ LOUVERED


OUTLET FOR INSECT PREVENTION (100mm).
SECOND FINER SCREEN NON-POTABLE WATER TO
PREVENTS INSECTS FROM HOSE BIBB.
GETTING INTO TANK. PVC BLUE PIPE, Ø50mm - FOR MAIN LINE

2000
PVC BLUE PIPE, Ø20mm - MAIN TO HOSE BIBB
PVC PIPE, Ø100mm, S-1000
STAINLESS STEEL STORAGE TANK (HORIZONTAL)
FIRST FLUSH DIVERTER W/ STAINLESS STEEL(SS) LADDER ( 1.70mØ - 3m
(DOWNPIPE-TYPE) LONG ) ( Volume of Tank = 6,809 liters )

PROVIDE GI PVC PIPE CLAMP. VARIES 4000 2m x 4m x 0.15m Thk. PLAIN CONCRETE SLAB

PROVIDE TWO (2) COLLECTOR


PIPE FROM GUTTER.

2 DETAILED PLAN OF STAINLESS STEEL HOR. RAINWATER TANK


A 3 SCALE: 1: 50 Mts.

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C. Y. 2022 PROJECT RHUELLE VALENTIN T. JANER
REGIONAL OFFICE II DETAILED ENGINEERING DESIGN PLAN FOR ARCHITECT II
NUEVA VIZCAYA CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ ISOMETRIC VIEW OF HOR. RAINWATER TANK A 3
SEPTAGE & SEWERAGE/ RAINWATER COLLECTOR SYSTEM DETAILED PLAN OF STAINLESS STEEL HOR. DESIGNED: REYNALDO V. RAGASA, JR. EDISON C. BASILIO PERFECTO E. URBAN, JR. MARLYN G. INGUILLO
2ND DISTRICT ENGINEERING OFFICE - RAINWATER COLLECTOR IN PUBLIC FACILITIES RAINWATER TANK ENGINEER II OIC, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
DUPAX DEL NORTE, NUEVA VIZCAYA JIOVANNI RUPAC - DANGAN SECTION 3 4 4
a.DUPAX DEL NORTE NHS-SENIOR HIGH, BRGY. LAMO,
DUPAX DEL NORTE, NUEVA VIZCAYA ENGINEER II (CTO BBBP) DATE: DATE: DATE: DATE:
RAIN HEAD, SLOPED NOTES:
SCREEN DIVERTS DEBRIS.
1. TANK SHOULD BE FIRM, FLAT & ON STABLE PLATFORM IN ACCORDANCE
PVC PIPE, Ø100mm, S-1000.
SECOND FINER SCREEN WITH MANUFACTURER'S RECOMMENDATIONS. TANK BASE UNIT MUST BE
TANK ACCESS. SUFFICIENT TO SUPPORT WEIGHT OF TANK WHEN FULL.
PREVENTS INSECTS FROM
GETTING INTO TANK. AIR RELIEF VENT
w/ INSECT SCREEN. 2. 100% OF ROOF AREA SHALL DRAIN TO THE TANK.
FIRST FLUSH DIVERTER
(DOWNPIPE-TYPE) OVERFLOW PIPE w/ LOUVERED
3. IT IS RECOMMENDED TO CONNECT THE FOLLOWING HOUSEHOLD
OUTLET FOR INSECT
SLOW-DRIP FLOW FIXTURES TO THE RAINWATER TANK SUPPLY:
PREVENTION (100mm).
- ALL OUTDOOR TAPS
CONTROL VALVE
NON-POTABLE WATER TO - ALL TOILETS
HOSE BIBB. - WASHING MACHINE (COLD TAP)
PVC BLUE PIPE, Ø50mm - FOR MAIN LINE
4. ALL PLUMBING WORKS SHALL BE UNDERTAKEN BY A LICENSED PLUMBER
STAINLESS STEEL STORAGE PVC BLUE PIPE, Ø20mm - MAIN TO HOSE BIBB
WITH THE CONSENT OF THE MANUFACTURER & IN ACCORDANCE WITH ALL
TANK (HORIZONTAL) W/ PVC PIPE, Ø100mm, S-1000 STANDARDS, CODES & REGULATIONS.
STAINLESS STEEL(SS)
LADDER ( 1.70mØ - 3m 2m x 4m x 0.15m Thk. PLAIN CONCRETE SLAB 5. TANK & PUMP SHALL BE INSTALLED ACCORDING TO MANUFACTURER'S
LONG ) ( Volume of Tank = REQUIREMENTS.
6,809 liters )
1 DETAILED ISOMETRIC SECTION OF STAINLESS STEEL HOR. RAINWATER TANK
6. ANNUAL RAINFALL = 4464.90mm (ACCORDING TO THE HIGHEST
A 4 SCALE: Nts.
CLIMATOLOGICAL NORMAL RECORDED BY THE PHILIPPINE ATMOSPHERIC,
GEOPHYSICAL AND ASTRONOMICAL SERVICES ADMINISTRATION (PAGASA).
ALL TYPE OF ROOFING ACCEPTABLE.
PRE-PAINTED GUTTER (GA. 24) w/ SCREEN ON TOP.
PVC PIPE, Ø75mm, S-1000 (COLLECTOR PIPE FROM GUTTER)
RAIN HEAD, SLOPED
SCREEN DIVERTS DEBRIS.
PVC PIPE, Ø100mm, S-1000.
2'' GAP AT DOWNSPOUT.
TANK ACCESS.
SECOND FINER SCREEN AIR RELIEF VENT
PREVENTS INSECTS FROM w/ INSECT SCREEN.
GETTING INTO TANK.
STAINLESS STEEL STORAGE OVERFLOW PIPE w/ LOUVERED
TANK (HORIZONTAL) W/ OUTLET FOR INSECT PREVENTION (100mm).
STAINLESS STEEL(SS) LADDER NON-POTABLE WATER TO
FIRST FLUSH DIVERTER ( 1.70mØ - 3m LONG ) ( Volume of HOSE BIBB.
(DOWNPIPE-TYPE) Tank = 6,809 liters )
PVC BLUE PIPE, Ø50mm - FOR MAIN LINE
SLOW-DRIP FLOW PVC BLUE PIPE, Ø20mm - MAIN TO HOSE BIBB

100
150

CONTROL VALVE PVC PIPE, Ø100mm, S-1000


TOP OF SLAB
NGL.

ANGLE BARS
50
100mm Thk. GRAVEL FILL
100

(DIMENSIONS AND SIZES VARIES 4000 2m x 4m x 0.15m Thk. PLAIN CONCRETE SLAB
ARE BASED ON
MANUFACTURER'S
DETAILS) 2 DETAILED ELEVATION OF STAINLESS STEEL HOR. RAINWATER TANK
A 4 SCALE: 1: 50 Mts.

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C. Y. 2022 PROJECT RHUELLE VALENTIN T. JANER
REGIONAL OFFICE II DETAILED ENGINEERING DESIGN PLAN FOR DETAILED ISOMETRIC SECTION OF STAINLESS ARCHITECT II
NUEVA VIZCAYA CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ A 4
STEEL HOR. RAINWATER TANK REYNALDO V. RAGASA, JR. EDISON C. BASILIO PERFECTO E. URBAN, JR. MARLYN G. INGUILLO
SEPTAGE & SEWERAGE/ RAINWATER COLLECTOR SYSTEM DESIGNED:
2ND DISTRICT ENGINEERING OFFICE DETAILED ELEVATION OF STAINLESS STEEL ENGINEER II OIC, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
- RAINWATER COLLECTOR IN PUBLIC FACILITIES 4 4 4
DUPAX DEL NORTE, NUEVA VIZCAYA a.DUPAX DEL NORTE NHS-SENIOR HIGH, BRGY. LAMO,
HOR. RAINWATER TANK JIOVANNI RUPAC - DANGAN SECTION
DUPAX DEL NORTE, NUEVA VIZCAYA ENGINEER II (CTO BBBP) DATE: DATE: DATE: DATE:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE II
NUEVA VIZCAYA 2ND DISTRICT ENGINEERING OFFICE
DUPAX DEL NORTE, NUEVA VIZCAYA

C. Y. 2022 PROJECT
DETAILED ENGINEERING DESIGN PLAN FOR
CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE &
SEWERAGE/ RAINWATER COLLECTOR SYSTEM- RAINWATER
COLLECTOR IN PUBLIC FACILITIES
b. INEANGAN BRGY.HALL, BRGY. INEANGAN,
DUPAX DEL NORTE,NUEVA VIZCAYA

APPROVED:
SUBMITTED: RECOMMENDED:

EDISON C. BASILIO PERFECTO E. URBAN, JR. MARLYN G. INGUILLO


OIC, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
SECTION DATE: DATE:
DATE:
INDEX OF DRAWINGS
ARCHITECTURAL
A 01 COVER PAGE

04
PERSPECTIVE
A 02 PROJECT LOCATION MAP
04 SUMMARY OF QUANTITIES
VICINITY MAP
SITE DEVELOPMENT PLAN
INDEX OF DRAWINGS
ISOMETRIC VIEW OF HOR. RAINWATER TANK
A 03 DETAILED PLAN OF STAINLESS STEEL HOR.
04 RAINWATER TANK

DETAILED ISOMETRIC SECTION OF STAINLESS


A 04 STEEL HOR. RAINWATER TANK
04 DETAILED ELEVATION OF STAINLESS STEEL
HOR. RAINWATER TANK

PICTURE No. 1: SHOWING PROPOSED


LOCATION OF THE RAINWATER
COLLECTOR SYSTEM.
PA
P -M
AL
-W
AN Tadji
G-B
Babadi IN
-TA
D-R
Bellet
UN
Antutot RD
. Alamidin
Pangawan Macalong
Binogawan
Balangabang Papaya
Sayoong Kongkong
NV-BENGUE Wangal
T RD.
Monaliza Kinalo Watwat
Victoria
BA
M-K Malabing
Kayapa Gabut
AS Alloy
Mabasa -Q
UE
Menchita Darapidap Lamo
Dupax -SO
LR
D.
Odom Aritao IneanganDM-JCT. MALASIN RD. Del Norte -N AG
RD.
Kirang Malasin Kasibu VICT
-MAD

Pingkian Manga JCT.


Bitnong Biyoy
Lobo Banganan Inaban
Nagcuartelan Cutar Munguia Pudi Siguem
Katarawan
Baan Dupax Lupa

JCT. NAT'L-BIT-BEL-NV
Dine

A
Pacquet

LIK
AR
Latar Del Sur Bua

AH
Bone N.

M
Muta

G
AN
DA
Calitlitan Bone S. ARITAO-QUI
RINO RD.

Cabulog Beti Makiboy


Oyao

RD.
Mag asawang Yaway Mantata
Salacsac kahoy Macabenga Macate
Anayo
Malico
Consuelo Balite Santa Clara

PERSPECTIVE
NV-P
ANGA
SINA Santa Fe
N RD Villaflores Baliti
1 Canarem Belance
.
Baracbac Mangauit
Imugan
Canabuan
Tactac Binuangan Yabbi
A 2 SCALE: Nts. Dalton

NORTH
SUMMARY OF QUANTITIES Abaca
New Gumiad

Umubi
Pelaway

ITEM Lipuga

NO.
DESCRIPTION QUANTITY UNIT Gadeng
Taan

Cauayan
3 KEY LOCATION MAP
Sitio Dinep A 2 SCALE: Nts.
PART I. FACILITIES FOR THE ENGINEER
Abuyo

A.1.4 (1) Provisions of Progress Photographs 0.33 Months


PART II. OTHER GENERAL REQUIREMENTS Alfonso
Castaneda
B.5 Project Billboard / Signboard 2.00 Each Lublub
Marikit
PAN-CANILI-BASAL-BALER RD.

B.7 (1) Occupational Safety and Health Program (PPE, Safety Personnel and Signage) 0.33 Months
B.9 Mobilization/Demobilization 1.00 L.S.
PART III. CIVIL, MECHANICAL, ELECTRICAL AND SANITARY/PLUMBING WORKS
PART A. EARTHWORKS
803 (1)a Structure Excavation 0.80 cu.m BRGY.
804 (4) Gravel Fill 0.80 cu.m INEANGAN COVERED
HALL
PART B. PLAIN AND REINFORCED CONCRETE WORKS COURT
INEANGAN COVERED
900 (1)b1 Structural Concrete (Class A, 14 Days) 1.20 cu.m COURT
PART C. FINISHING

AD
INSTALLATION OF GI
GUTTER(REFER TO
C.6 ROOF FRAMING AND ROOFING WORKS SUMMARY OF

RO
QUANTITIES)
1013 (2)b1 Fabricated Metal Roofing Accessory - Gutters 8.00 ln.m
PART D. PLUMBING/SANITARY WORKS SITE DEVELOPMENT PLAN
1001 (9) Strom Drinage and Downspout 1.00 L.S.
2 VICINITY MAP 4
A 2 SCALE: Nts.
A 2 SCALE: Nts.
1002 (27) Plumbing Fixtures 1.00 L.S.
PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C. Y. 2022 PROJECT PERSPECTIVE RHUELLE VALENTIN T. JANER
REGIONAL OFFICE II DETAILED ENGINEERING DESIGN PLAN FOR PROJECT LOCATION MAP ARCHITECT II
NUEVA VIZCAYA CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ A 2
SUMMARY OF QUANTITIES REYNALDO V. RAGASA, JR. EDISON C. BASILIO PERFECTO E. URBAN, JR. MARLYN G. INGUILLO
SEPTAGE & SEWERAGE/ RAINWATER COLLECTOR SYSTEM DESIGNED:
2ND DISTRICT ENGINEERING OFFICE VICINITY MAP ENGINEER II OIC, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
- RAINWATER COLLECTOR IN PUBLIC FACILITIES 2 4 4
DUPAX DEL NORTE, NUEVA VIZCAYA b. INEANGAN BRGY. HALL, BRGY. INEANGAN, SITE DEVELOPMENT PLAN JIOVANNI RUPAC - DANGAN SECTION
DUPAX DEL NORTE, NUEVA VIZCAYA INDEX OF DRAWINGS ENGINEER II (CTO BBBP) DATE: DATE: DATE: DATE:
NOTES:

1. TANK SHOULD BE FIRM, FLAT & ON STABLE PLATFORM IN ACCORDANCE


WITH MANUFACTURER'S RECOMMENDATIONS. TANK BASE UNIT MUST BE
SUFFICIENT TO SUPPORT WEIGHT OF TANK WHEN FULL.

2. 100% OF ROOF AREA SHALL DRAIN TO THE TANK.

3. IT IS RECOMMENDED TO CONNECT THE FOLLOWING HOUSEHOLD


FIXTURES TO THE RAINWATER TANK SUPPLY:
- ALL OUTDOOR TAPS
- ALL TOILETS
- WASHING MACHINE (COLD TAP)

4. ALL PLUMBING WORKS SHALL BE UNDERTAKEN BY A LICENSED PLUMBER


WITH THE CONSENT OF THE MANUFACTURER & IN ACCORDANCE WITH ALL
STANDARDS, CODES & REGULATIONS.

5. TANK & PUMP SHALL BE INSTALLED ACCORDING TO MANUFACTURER'S


REQUIREMENTS.

6. ANNUAL RAINFALL = 4464.90mm (ACCORDING TO THE HIGHEST


CLIMATOLOGICAL NORMAL RECORDED BY THE PHILIPPINE ATMOSPHERIC,
1 ISOMETRIC VIEW OF HOR. RAINWATER TANK GEOPHYSICAL AND ASTRONOMICAL SERVICES ADMINISTRATION (PAGASA).
A 3 SCALE: Nts.

PVC PIPE, Ø75mm, S-1000 (COLLECTOR PIPE FROM GUTTER)

PRE-PAINTED GUTTER (GA.


24) w/ SCREEN ON TOP.
RAIN HEAD, SLOPED SCREEN DIVERTS DEBRIS.
PVC PIPE, Ø100mm, S-1000.
TANK ACCESS.
AIR RELIEF VENT w/ INSECT SCREEN.
WALL / COLUMN OF EXISTING BUILDING

OVERFLOW PIPE w/ LOUVERED


OUTLET FOR INSECT PREVENTION (100mm).
SECOND FINER SCREEN NON-POTABLE WATER TO
PREVENTS INSECTS FROM HOSE BIBB.
GETTING INTO TANK. PVC BLUE PIPE, Ø50mm - FOR MAIN LINE

2000
PVC BLUE PIPE, Ø20mm - MAIN TO HOSE BIBB
PVC PIPE, Ø100mm, S-1000
STAINLESS STEEL STORAGE TANK (HORIZONTAL)
FIRST FLUSH DIVERTER W/ STAINLESS STEEL(SS) LADDER ( 1.70mØ - 3m
(DOWNPIPE-TYPE) LONG ) ( Volume of Tank = 6,809 liters )

PROVIDE GI PVC PIPE CLAMP. VARIES 4000 2m x 4m x 0.15m Thk. PLAIN CONCRETE SLAB

PROVIDE TWO (2) COLLECTOR


PIPE FROM GUTTER.

2 DETAILED PLAN OF STAINLESS STEEL HOR. RAINWATER TANK


A 3 SCALE: 1: 50 Mts.

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C. Y. 2022 PROJECT RHUELLE VALENTIN T. JANER
REGIONAL OFFICE II DETAILED ENGINEERING DESIGN PLAN FOR ARCHITECT II
NUEVA VIZCAYA CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ ISOMETRIC VIEW OF HOR. RAINWATER TANK A 3
SEPTAGE & SEWERAGE/ RAINWATER COLLECTOR SYSTEM DETAILED PLAN OF STAINLESS STEEL HOR. DESIGNED: REYNALDO V. RAGASA, JR. EDISON C. BASILIO PERFECTO E. URBAN, JR. MARLYN G. INGUILLO
2ND DISTRICT ENGINEERING OFFICE - RAINWATER COLLECTOR IN PUBLIC FACILITIES RAINWATER TANK ENGINEER II OIC, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
DUPAX DEL NORTE, NUEVA VIZCAYA b. INEANGAN BRGY. HALL, BRGY. INEANGAN, JIOVANNI RUPAC - DANGAN SECTION 3 4 4
DUPAX DEL NORTE, NUEVA VIZCAYA ENGINEER II (CTO BBBP) DATE: DATE: DATE: DATE:
RAIN HEAD, SLOPED NOTES:
SCREEN DIVERTS DEBRIS.
1. TANK SHOULD BE FIRM, FLAT & ON STABLE PLATFORM IN ACCORDANCE
PVC PIPE, Ø100mm, S-1000.
SECOND FINER SCREEN WITH MANUFACTURER'S RECOMMENDATIONS. TANK BASE UNIT MUST BE
TANK ACCESS. SUFFICIENT TO SUPPORT WEIGHT OF TANK WHEN FULL.
PREVENTS INSECTS FROM
GETTING INTO TANK. AIR RELIEF VENT
w/ INSECT SCREEN. 2. 100% OF ROOF AREA SHALL DRAIN TO THE TANK.
FIRST FLUSH DIVERTER
(DOWNPIPE-TYPE) OVERFLOW PIPE w/ LOUVERED
3. IT IS RECOMMENDED TO CONNECT THE FOLLOWING HOUSEHOLD
OUTLET FOR INSECT
SLOW-DRIP FLOW FIXTURES TO THE RAINWATER TANK SUPPLY:
PREVENTION (100mm).
- ALL OUTDOOR TAPS
CONTROL VALVE
NON-POTABLE WATER TO - ALL TOILETS
HOSE BIBB. - WASHING MACHINE (COLD TAP)
PVC BLUE PIPE, Ø50mm - FOR MAIN LINE
4. ALL PLUMBING WORKS SHALL BE UNDERTAKEN BY A LICENSED PLUMBER
STAINLESS STEEL STORAGE PVC BLUE PIPE, Ø20mm - MAIN TO HOSE BIBB
WITH THE CONSENT OF THE MANUFACTURER & IN ACCORDANCE WITH ALL
TANK (HORIZONTAL) W/ PVC PIPE, Ø100mm, S-1000 STANDARDS, CODES & REGULATIONS.
STAINLESS STEEL(SS)
LADDER ( 1.70mØ - 3m 2m x 4m x 0.15m Thk. PLAIN CONCRETE SLAB 5. TANK & PUMP SHALL BE INSTALLED ACCORDING TO MANUFACTURER'S
LONG ) ( Volume of Tank = REQUIREMENTS.
6,809 liters )
1 DETAILED ISOMETRIC SECTION OF STAINLESS STEEL HOR. RAINWATER TANK 6. ANNUAL RAINFALL = 4464.90mm (ACCORDING TO THE HIGHEST
A 4 SCALE: Nts.
CLIMATOLOGICAL NORMAL RECORDED BY THE PHILIPPINE ATMOSPHERIC,
GEOPHYSICAL AND ASTRONOMICAL SERVICES ADMINISTRATION (PAGASA).
ALL TYPE OF ROOFING ACCEPTABLE.
PRE-PAINTED GUTTER (GA. 24) w/ SCREEN ON TOP.
PVC PIPE, Ø75mm, S-1000 (COLLECTOR PIPE FROM GUTTER)
RAIN HEAD, SLOPED
SCREEN DIVERTS DEBRIS.
PVC PIPE, Ø100mm, S-1000.
2'' GAP AT DOWNSPOUT.
TANK ACCESS.
SECOND FINER SCREEN AIR RELIEF VENT
PREVENTS INSECTS FROM w/ INSECT SCREEN.
GETTING INTO TANK.
STAINLESS STEEL STORAGE OVERFLOW PIPE w/ LOUVERED
TANK (HORIZONTAL) W/ OUTLET FOR INSECT PREVENTION (100mm).
STAINLESS STEEL(SS) LADDER NON-POTABLE WATER TO
FIRST FLUSH DIVERTER ( 1.70mØ - 3m LONG ) ( Volume of HOSE BIBB.
(DOWNPIPE-TYPE) Tank = 6,809 liters )
PVC BLUE PIPE, Ø50mm - FOR MAIN LINE
SLOW-DRIP FLOW PVC BLUE PIPE, Ø20mm - MAIN TO HOSE BIBB

100
150

CONTROL VALVE PVC PIPE, Ø100mm, S-1000


TOP OF SLAB
NGL.

ANGLE BARS 100mm Thk. GRAVEL FILL


50
100

(DIMENSIONS AND SIZES VARIES 4000 2m x 4m x 0.15m Thk. PLAIN CONCRETE SLAB
ARE BASED ON
MANUFACTURER'S
DETAILS)
2 DETAILED ELEVATION OF STAINLESS STEEL HOR. RAINWATER TANK
A 4 SCALE: 1: 50 Mts.

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C. Y. 2022 PROJECT RHUELLE VALENTIN T. JANER
REGIONAL OFFICE II DETAILED ENGINEERING DESIGN PLAN FOR DETAILED ISOMETRIC SECTION OF STAINLESS ARCHITECT II
NUEVA VIZCAYA CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ A 4
STEEL HOR. RAINWATER TANK REYNALDO V. RAGASA, JR. EDISON C. BASILIO PERFECTO E. URBAN, JR. MARLYN G. INGUILLO
SEPTAGE & SEWERAGE/ RAINWATER COLLECTOR SYSTEM DESIGNED:
2ND DISTRICT ENGINEERING OFFICE DETAILED ELEVATION OF STAINLESS STEEL ENGINEER II OIC, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
- RAINWATER COLLECTOR IN PUBLIC FACILITIES 4 4 4
DUPAX DEL NORTE, NUEVA VIZCAYA b. INEANGAN BRGY. HALL, BRGY. INEANGAN,
HOR. RAINWATER TANK JIOVANNI RUPAC - DANGAN SECTION
DUPAX DEL NORTE, NUEVA VIZCAYA ENGINEER II (CTO BBBP) DATE: DATE: DATE: DATE:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE II
NUEVA VIZCAYA 2ND DISTRICT ENGINEERING OFFICE
DUPAX DEL NORTE, NUEVA VIZCAYA

C. Y. 2022 PROJECT
DETAILED ENGINEERING DESIGN PLAN FOR
CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE &
SEWERAGE/ RAINWATER COLLECTOR SYSTEM- RAINWATER
COLLECTOR IN PUBLIC FACILITIES
c. DUPAX DEL NORTE NHS POBLACION ANNEX,
BRGY. MALASIN, DUPAX DEL NORTE, NUEVA VIZCAYA

APPROVED:
SUBMITTED: RECOMMENDED:

EDISON C. BASILIO PERFECTO E. URBAN, JR. MARLYN G. INGUILLO


OIC, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
SECTION DATE: DATE:
DATE:
INDEX OF DRAWINGS
ARCHITECTURAL
A 01 COVER PAGE

04
PERSPECTIVE
A 02 PROJECT LOCATION MAP
04 SUMMARY OF QUANTITIES
VICINITY MAP
SITE DEVELOPMENT PLAN
INDEX OF DRAWINGS
ISOMETRIC VIEW OF HOR. RAINWATER TANK
A 03 DETAILED PLAN OF STAINLESS STEEL HOR.
04 RAINWATER TANK

DETAILED ISOMETRIC SECTION OF STAINLESS


A 04 STEEL HOR. RAINWATER TANK
04 DETAILED ELEVATION OF STAINLESS STEEL
HOR. RAINWATER TANK

PICTURE No. 1: SHOWING PROPOSED


LOCATION OF THE RAINWATER
COLLECTOR SYSTEM.
PA
P -M
AL
-W
AN Tadji
G-B
Babadi IN
-TA
D-R
Bellet
UN
Antutot RD
. Alamidin
Pangawan Macalong
Binogawan
Balangabang Papaya
Sayoong Kongkong
NV-BENGUE Wangal
T RD.
Monaliza Kinalo Watwat
Victoria
BA
M-K Malabing
Kayapa Gabut
AS Alloy
Mabasa -Q
UE
Menchita Darapidap Lamo
Dupax -SO
LR
D.
Odom Aritao Del Norte
DM-JCT. MALASIN RD.
-N AG
RD.
Kirang Malasin Kasibu VICT
-MAD

Pingkian Manga JCT.

Inaban Bitnong Biyoy


Lobo Banganan
Nagcuartelan Cutar Munguia Pudi Siguem
Katarawan
Baan Dupax Lupa

JCT. NAT'L-BIT-BEL-NV
Dine

A
Pacquet

LIK
AR
Latar Del Sur Bua

AH
Bone N.

M
Muta

G
AN
DA
Calitlitan Bone S. ARITAO-QUI
RINO RD.

Cabulog Beti Makiboy


Oyao

RD.
Mag asawang Yaway Mantata
Salacsac kahoy Macabenga Macate
Anayo
NV-P
Malico
Consuelo Balite Santa Clara
ANGA
SINA Santa Fe
N RD Villaflores Baliti
Baracbac
.
Canarem Belance
Imugan Mangauit
Canabuan

1 PERSPECTIVE Tactac
Dalton
Binuangan Yabbi

A 2 SCALE: Nts. NORTH


New Gumiad

Abaca Umubi

Lipuga
Pelaway

Gadeng
Taan
3 KEY LOCATION MAP
Cauayan
A 2 SCALE: Nts.

SUMMARY OF QUANTITIES Abuyo


Sitio Dinep

ITEM QUANTITY
DESCRIPTION UNIT
NO. Alfonso
Castaneda

PART I. FACILITIES FOR THE ENGINEER Marikit


Lublub
PAN-CANILI-BASAL-BALER RD.

A.1.4 (1) Provisions of Progress Photographs 0.33 Months


PART II. OTHER GENERAL REQUIREMENTS OO
M
SR .
AS LDG
B.5 Project Billboard / Signboard 2.00 Each CL B

3- S
TOR
BR
B.7 (1) Occupational Safety and Health Program (PPE, Safety Personnel and Signage) 0.33 Months

GY

EY
.R

SCH
B.9 Mobilization/Demobilization 1.00 L.S.

OA

OO
D

LB
PART III. CIVIL, MECHANICAL, ELECTRICAL AND SANITARY/PLUMBING WORKS

LDG
.
PART A. EARTHWORKS
803 (1)a Structure Excavation 0.80 cu.m
804 (4) Gravel Fill 0.80 cu.m

3.00m
PART B. PLAIN AND REINFORCED CONCRETE WORKS
900 (1)b1 Structural Concrete (Class A, 14 Days) 1.20 cu.m
PART D. PLUMBING/SANITARY WORKS
1001 (9) Strom Drinage and Downspout 1.00 L.S. 2 VICINITY MAP 4 SITE DEVELOPMENT PLAN
A 2 SCALE: Nts. A 2 SCALE: Nts.
1002 (27) Plumbing Fixtures 1.00 L.S.
PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C. Y. 2022 PROJECT PERSPECTIVE RHUELLE VALENTIN T. JANER
REGIONAL OFFICE II DETAILED ENGINEERING DESIGN PLAN FOR PROJECT LOCATION MAP ARCHITECT II
NUEVA VIZCAYA CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ A 2
SUMMARY OF QUANTITIES REYNALDO V. RAGASA, JR. EDISON C. BASILIO PERFECTO E. URBAN, JR. MARLYN G. INGUILLO
SEPTAGE & SEWERAGE/ RAINWATER COLLECTOR SYSTEM DESIGNED:
2ND DISTRICT ENGINEERING OFFICE VICINITY MAP ENGINEER II OIC, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
- RAINWATER COLLECTOR IN PUBLIC FACILITIES 2 4 4
DUPAX DEL NORTE, NUEVA VIZCAYA c. DUPAX DEL NORTE NHS POBLACION ANNEX, BRGY. MALASIN, SITE DEVELOPMENT PLAN JIOVANNI RUPAC - DANGAN SECTION
DUPAX DEL NORTE, NUEVA VIZCAYA INDEX OF DRAWINGS ENGINEER II (CTO BBBP) DATE: DATE: DATE: DATE:
NOTES:

1. TANK SHOULD BE FIRM, FLAT & ON STABLE PLATFORM IN ACCORDANCE


WITH MANUFACTURER'S RECOMMENDATIONS. TANK BASE UNIT MUST BE
SUFFICIENT TO SUPPORT WEIGHT OF TANK WHEN FULL.

2. 100% OF ROOF AREA SHALL DRAIN TO THE TANK.

3. IT IS RECOMMENDED TO CONNECT THE FOLLOWING HOUSEHOLD


FIXTURES TO THE RAINWATER TANK SUPPLY:
- ALL OUTDOOR TAPS
- ALL TOILETS
- WASHING MACHINE (COLD TAP)

4. ALL PLUMBING WORKS SHALL BE UNDERTAKEN BY A LICENSED PLUMBER


WITH THE CONSENT OF THE MANUFACTURER & IN ACCORDANCE WITH ALL
STANDARDS, CODES & REGULATIONS.

5. TANK & PUMP SHALL BE INSTALLED ACCORDING TO MANUFACTURER'S


REQUIREMENTS.

6. ANNUAL RAINFALL = 4464.90mm (ACCORDING TO THE HIGHEST


CLIMATOLOGICAL NORMAL RECORDED BY THE PHILIPPINE ATMOSPHERIC,
1 ISOMETRIC VIEW OF HOR. RAINWATER TANK GEOPHYSICAL AND ASTRONOMICAL SERVICES ADMINISTRATION (PAGASA).
A 3 SCALE: Nts.

PVC PIPE, Ø75mm, S-1000 (COLLECTOR PIPE FROM GUTTER)

PRE-PAINTED GUTTER (GA.


24) w/ SCREEN ON TOP.
RAIN HEAD, SLOPED SCREEN DIVERTS DEBRIS.
PVC PIPE, Ø100mm, S-1000.
TANK ACCESS.
AIR RELIEF VENT w/ INSECT SCREEN.
WALL / COLUMN OF EXISTING BUILDING

OVERFLOW PIPE w/ LOUVERED


OUTLET FOR INSECT PREVENTION (100mm).
SECOND FINER SCREEN NON-POTABLE WATER TO
PREVENTS INSECTS FROM HOSE BIBB.
GETTING INTO TANK. PVC BLUE PIPE, Ø50mm - FOR MAIN LINE

2000
PVC BLUE PIPE, Ø20mm - MAIN TO HOSE BIBB
PVC PIPE, Ø100mm, S-1000
STAINLESS STEEL STORAGE TANK (HORIZONTAL)
FIRST FLUSH DIVERTER W/ STAINLESS STEEL(SS) LADDER ( 1.70mØ - 3m
(DOWNPIPE-TYPE) LONG ) ( Volume of Tank = 6,809 liters )

PROVIDE GI PVC PIPE CLAMP. VARIES 4000 2m x 4m x 0.15m Thk. PLAIN CONCRETE SLAB

PROVIDE TWO (2) COLLECTOR


PIPE FROM GUTTER.

2 DETAILED PLAN OF STAINLESS STEEL HOR. RAINWATER TANK


A 3 SCALE: 1: 50 Mts.

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C. Y. 2022 PROJECT RHUELLE VALENTIN T. JANER
REGIONAL OFFICE II DETAILED ENGINEERING DESIGN PLAN FOR ARCHITECT II
NUEVA VIZCAYA CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ ISOMETRIC VIEW OF HOR. RAINWATER TANK A 3
SEPTAGE & SEWERAGE/ RAINWATER COLLECTOR SYSTEM DETAILED PLAN OF STAINLESS STEEL HOR. DESIGNED: REYNALDO V. RAGASA, JR. EDISON C. BASILIO PERFECTO E. URBAN, JR. MARLYN G. INGUILLO
2ND DISTRICT ENGINEERING OFFICE - RAINWATER COLLECTOR IN PUBLIC FACILITIES RAINWATER TANK ENGINEER II OIC, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
DUPAX DEL NORTE, NUEVA VIZCAYA c. DUPAX DEL NORTE NHS POBLACION ANNEX, BRGY. MALASIN, JIOVANNI RUPAC - DANGAN SECTION 3 4 4
DUPAX DEL NORTE, NUEVA VIZCAYA ENGINEER II (CTO BBBP) DATE: DATE: DATE: DATE:
RAIN HEAD, SLOPED NOTES:
SCREEN DIVERTS DEBRIS.
1. TANK SHOULD BE FIRM, FLAT & ON STABLE PLATFORM IN ACCORDANCE
PVC PIPE, Ø100mm, S-1000.
SECOND FINER SCREEN WITH MANUFACTURER'S RECOMMENDATIONS. TANK BASE UNIT MUST BE
TANK ACCESS. SUFFICIENT TO SUPPORT WEIGHT OF TANK WHEN FULL.
PREVENTS INSECTS FROM
GETTING INTO TANK. AIR RELIEF VENT
w/ INSECT SCREEN. 2. 100% OF ROOF AREA SHALL DRAIN TO THE TANK.
FIRST FLUSH DIVERTER
(DOWNPIPE-TYPE) OVERFLOW PIPE w/ LOUVERED
3. IT IS RECOMMENDED TO CONNECT THE FOLLOWING HOUSEHOLD
OUTLET FOR INSECT
SLOW-DRIP FLOW FIXTURES TO THE RAINWATER TANK SUPPLY:
PREVENTION (100mm).
- ALL OUTDOOR TAPS
CONTROL VALVE
NON-POTABLE WATER TO - ALL TOILETS
HOSE BIBB. - WASHING MACHINE (COLD TAP)
PVC BLUE PIPE, Ø50mm - FOR MAIN LINE
4. ALL PLUMBING WORKS SHALL BE UNDERTAKEN BY A LICENSED PLUMBER
STAINLESS STEEL STORAGE PVC BLUE PIPE, Ø20mm - MAIN TO HOSE BIBB
WITH THE CONSENT OF THE MANUFACTURER & IN ACCORDANCE WITH ALL
TANK (HORIZONTAL) W/ PVC PIPE, Ø100mm, S-1000 STANDARDS, CODES & REGULATIONS.
STAINLESS STEEL(SS)
LADDER ( 1.70mØ - 3m 2m x 4m x 0.15m Thk. PLAIN CONCRETE SLAB 5. TANK & PUMP SHALL BE INSTALLED ACCORDING TO MANUFACTURER'S
LONG ) ( Volume of Tank = REQUIREMENTS.
6,809 liters ) 1 DETAILED ISOMETRIC SECTION OF STAINLESS STEEL HOR. RAINWATER TANK
A 4 SCALE: Nts. 6. ANNUAL RAINFALL = 4464.90mm (ACCORDING TO THE HIGHEST
CLIMATOLOGICAL NORMAL RECORDED BY THE PHILIPPINE ATMOSPHERIC,
GEOPHYSICAL AND ASTRONOMICAL SERVICES ADMINISTRATION (PAGASA).
ALL TYPE OF ROOFING ACCEPTABLE.
PRE-PAINTED GUTTER (GA. 24) w/ SCREEN ON TOP.
PVC PIPE, Ø75mm, S-1000 (COLLECTOR PIPE FROM GUTTER)
RAIN HEAD, SLOPED
SCREEN DIVERTS DEBRIS.
PVC PIPE, Ø100mm, S-1000.
2'' GAP AT DOWNSPOUT.
TANK ACCESS.
SECOND FINER SCREEN AIR RELIEF VENT
PREVENTS INSECTS FROM w/ INSECT SCREEN.
GETTING INTO TANK.
STAINLESS STEEL STORAGE OVERFLOW PIPE w/ LOUVERED
TANK (HORIZONTAL) W/ OUTLET FOR INSECT PREVENTION (100mm).
STAINLESS STEEL(SS) LADDER NON-POTABLE WATER TO
FIRST FLUSH DIVERTER ( 1.70mØ - 3m LONG ) ( Volume of HOSE BIBB.
(DOWNPIPE-TYPE) Tank = 6,809 liters )
PVC BLUE PIPE, Ø50mm - FOR MAIN LINE
SLOW-DRIP FLOW PVC BLUE PIPE, Ø20mm - MAIN TO HOSE BIBB

100
150

CONTROL VALVE PVC PIPE, Ø100mm, S-1000


TOP OF SLAB
NGL.

ANGLE BARS
50
100mm Thk. GRAVEL FILL
100

(DIMENSIONS AND SIZES VARIES 4000 2m x 4m x 0.15m Thk. PLAIN CONCRETE SLAB
ARE BASED ON
MANUFACTURER'S
DETAILS) DETAILED ELEVATION OF STAINLESS STEEL HOR. RAINWATER TANK
2
A 4 SCALE: 1: 50 Mts.

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C. Y. 2022 PROJECT RHUELLE VALENTIN T. JANER
REGIONAL OFFICE II DETAILED ENGINEERING DESIGN PLAN FOR DETAILED ISOMETRIC SECTION OF STAINLESS ARCHITECT II
NUEVA VIZCAYA CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ A 4
STEEL HOR. RAINWATER TANK REYNALDO V. RAGASA, JR. EDISON C. BASILIO PERFECTO E. URBAN, JR. MARLYN G. INGUILLO
SEPTAGE & SEWERAGE/ RAINWATER COLLECTOR SYSTEM DESIGNED:
2ND DISTRICT ENGINEERING OFFICE DETAILED ELEVATION OF STAINLESS STEEL ENGINEER II OIC, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
- RAINWATER COLLECTOR IN PUBLIC FACILITIES 4 4 4
DUPAX DEL NORTE, NUEVA VIZCAYA c. DUPAX DEL NORTE NHS POBLACION ANNEX, BRGY. MALASIN, HOR. RAINWATER TANK JIOVANNI RUPAC - DANGAN SECTION
DUPAX DEL NORTE, NUEVA VIZCAYA ENGINEER II (CTO BBBP) DATE: DATE: DATE: DATE: