Professional Documents
Culture Documents
C. Y. 2022 PROJECT
DETAILED ENGINEERING DESIGN PLAN FOR
CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE &
SEWERAGE/ RAINWATER COLLECTOR SYSTEM- RAINWATER
COLLECTOR IN PUBLIC FACILITIES
g. DUPAX DEL SUR MHO, BRGY. DOPAJ,
DUPAX DEL SUR, NUEVA VIZCAYA
APPROVED:
SUBMITTED: RECOMMENDED:
04
PERSPECTIVE
A 02 PROJECT LOCATION MAP
04 SUMMARY OF QUANTITIES
VICINITY MAP
SITE DEVELOPMENT PLAN
INDEX OF DRAWINGS
ISOMETRIC VIEW OF HOR. RAINWATER TANK
A 03 DETAILED PLAN OF STAINLESS STEEL HOR.
04 RAINWATER TANK
PA
P-M
AL
-W
AN Tadji
G-B
Babadi IN
-TA
D
Bellet
-R
UN
Antutot RD
. Alamidin
Pangawan Macalong
Binogawan
Balangabang Papaya
Sayoong Kongkong
NV-BENGUE Wangal
T RD.
Monaliza Kinalo Watwat
Victoria
BA
M-K Malabing
Kayapa Gabut
A S-Q Alloy
Mabasa UE
Menchita Darapidap Lamo
Dupax -SO
LR
D.
Odom Aritao Del Norte
DM-JCT. MALASIN RD.
-NAG
RD.
Kirang Malasin Kasibu VICT
-MAD
JCT. NAT'L-BIT-BEL-NV
Comon Dine
A
Pacquet
LIK
1
AR
Latar Del Sur Bua
AH
Bone N.
M
Muta
G
AN
DA
Calitlitan Bone S. ARITAO-QUI
RINO RD.
Makiboy
A 2 SCALE: Nts. Cabulog Beti Oyao
RD.
Mag asawang Yaway Mantata
Salacsac kahoy Macabenga Macate
Anayo
NV-P
Malico
Consuelo Balite Santa Clara
ANGA
SINAN Santa Fe Villaflores Baliti
RD.
Baracbac Canarem Belance
Imugan Mangauit
Canabuan
Tactac Binuangan Yabbi
Dalton
NORTH
New Gumiad
Abaca
Lipuga
Umubi
Pelaway 3 KEY LOCATION MAP
Gadeng
A 2 SCALE: Nts.
SUMMARY OF QUANTITIES
Taan
Cauayan
Sitio Dinep
ITEM QUANTITY
Abuyo
DESCRIPTION UNIT
NO.
PART I. FACILITIES FOR THE ENGINEER Alfonso
Castaneda
AD
B.5 Project Billboard / Signboard 2.00 Each
O
R
B.7 (1) Occupational Safety and Health Program (PPE, Safety Personnel and Signage) 0.33 Months
B.9 Mobilization/Demobilization 1.00 L.S.
DG R
BL SU
CIVIL, MECHANICAL, ELECTRICAL AND SANITARY/PLUMBING WORKS
.
PART III.
O EL
MH X D
PART A. EARTHWORKS
PA
DU
803 (1)a Structure Excavation 0.80 cu.m
804 (4) Gravel Fill 0.80 cu.m
R
O
PART B. PLAIN AND REINFORCED CONCRETE WORKS AD
D
4
VICINITY MAP
ROA
2
1001 (9) Strom Drinage and Downspout 1.00 L.S. A 2 SCALE: Nts.
A 2 SCALE: Nts.
1002 (27) Plumbing Fixtures 1.00 L.S.
PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C. Y. 2022 PROJECT PERSPECTIVE RHUELLE VALENTIN T. JANER
REGIONAL OFFICE II DETAILED ENGINEERING DESIGN PLAN FOR PROJECT LOCATION MAP ARCHITECT II
NUEVA VIZCAYA CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SUMMARY OF QUANTITIES REYNALDO V. RAGASA, JR. EDISON C. BASILIO PERFECTO E. URBAN, JR. MARLYN G. INGUILLO A 2
SEPTAGE & SEWERAGE/ RAINWATER COLLECTOR SYSTEM VICINITY MAP
DESIGNED:
2ND DISTRICT ENGINEERING OFFICE - RAINWATER COLLECTOR IN PUBLIC FACILITIES ENGINEER II OIC, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
DUPAX DEL NORTE, NUEVA VIZCAYA g. DUPAX DEL SUR MHO, BRGY. DOPAJ,
SITE DEVELOPMENT PLAN JIOVANNI RUPAC - DANGAN SECTION 2 4 4
DUPAX DEL SUR NUEVA VIZCAYA INDEX OF DRAWINGS ENGINEER II (CTO BBBP) DATE: DATE: DATE: DATE:
NOTES:
2000
PVC BLUE PIPE, Ø20mm - MAIN TO HOSE BIBB
PVC PIPE, Ø100mm, S-1000
STAINLESS STEEL STORAGE TANK (HORIZONTAL)
FIRST FLUSH DIVERTER W/ STAINLESS STEEL(SS) LADDER ( 1.70mØ - 3m
(DOWNPIPE-TYPE) LONG ) ( Volume of Tank = 6,809 liters )
PROVIDE GI PVC PIPE CLAMP. VARIES 4000 2m x 4m x 0.15m Thk. PLAIN CONCRETE SLAB
PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C. Y. 2022 PROJECT RHUELLE VALENTIN T. JANER
REGIONAL OFFICE II DETAILED ENGINEERING DESIGN PLAN FOR ARCHITECT II
NUEVA VIZCAYA CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ ISOMETRIC VIEW OF HOR. RAINWATER TANK A 3
SEPTAGE & SEWERAGE/ RAINWATER COLLECTOR SYSTEM DETAILED PLAN OF STAINLESS STEEL HOR. DESIGNED: REYNALDO V. RAGASA, JR. EDISON C. BASILIO PERFECTO E. URBAN, JR. MARLYN G. INGUILLO
2ND DISTRICT ENGINEERING OFFICE - RAINWATER COLLECTOR IN PUBLIC FACILITIES RAINWATER TANK ENGINEER II OIC, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
DUPAX DEL NORTE, NUEVA VIZCAYA g. DUPAX DEL SUR MHO, BRGY. DOPAJ, JIOVANNI RUPAC - DANGAN SECTION 3 4 4
DUPAX DEL SUR NUEVA VIZCAYA ENGINEER II (CTO BBBP) DATE: DATE: DATE: DATE:
RAIN HEAD, SLOPED NOTES:
SCREEN DIVERTS DEBRIS.
1. TANK SHOULD BE FIRM, FLAT & ON STABLE PLATFORM IN ACCORDANCE
PVC PIPE, Ø100mm, S-1000.
SECOND FINER SCREEN WITH MANUFACTURER'S RECOMMENDATIONS. TANK BASE UNIT MUST BE
TANK ACCESS. SUFFICIENT TO SUPPORT WEIGHT OF TANK WHEN FULL.
PREVENTS INSECTS FROM
GETTING INTO TANK. AIR RELIEF VENT
w/ INSECT SCREEN. 2. 100% OF ROOF AREA SHALL DRAIN TO THE TANK.
FIRST FLUSH DIVERTER
(DOWNPIPE-TYPE) OVERFLOW PIPE w/ LOUVERED
3. IT IS RECOMMENDED TO CONNECT THE FOLLOWING HOUSEHOLD
OUTLET FOR INSECT
SLOW-DRIP FLOW FIXTURES TO THE RAINWATER TANK SUPPLY:
PREVENTION (100mm).
- ALL OUTDOOR TAPS
CONTROL VALVE
NON-POTABLE WATER TO - ALL TOILETS
HOSE BIBB. - WASHING MACHINE (COLD TAP)
PVC BLUE PIPE, Ø50mm - FOR MAIN LINE
4. ALL PLUMBING WORKS SHALL BE UNDERTAKEN BY A LICENSED PLUMBER
STAINLESS STEEL STORAGE PVC BLUE PIPE, Ø20mm - MAIN TO HOSE BIBB
WITH THE CONSENT OF THE MANUFACTURER & IN ACCORDANCE WITH ALL
TANK (HORIZONTAL) W/ PVC PIPE, Ø100mm, S-1000 STANDARDS, CODES & REGULATIONS.
STAINLESS STEEL(SS)
LADDER ( 1.70mØ - 3m 2m x 4m x 0.15m Thk. PLAIN CONCRETE SLAB 5. TANK & PUMP SHALL BE INSTALLED ACCORDING TO MANUFACTURER'S
LONG ) ( Volume of Tank = REQUIREMENTS.
6,809 liters )
1 DETAILED ISOMETRIC SECTION OF STAINLESS STEEL HOR. RAINWATER TANK
6. ANNUAL RAINFALL = 4464.90mm (ACCORDING TO THE HIGHEST
A 4 SCALE: Nts.
CLIMATOLOGICAL NORMAL RECORDED BY THE PHILIPPINE ATMOSPHERIC,
GEOPHYSICAL AND ASTRONOMICAL SERVICES ADMINISTRATION (PAGASA).
ALL TYPE OF ROOFING ACCEPTABLE.
PRE-PAINTED GUTTER (GA. 24) w/ SCREEN ON TOP.
PVC PIPE, Ø75mm, S-1000 (COLLECTOR PIPE FROM GUTTER)
RAIN HEAD, SLOPED
SCREEN DIVERTS DEBRIS.
PVC PIPE, Ø100mm, S-1000.
2'' GAP AT DOWNSPOUT.
TANK ACCESS.
SECOND FINER SCREEN AIR RELIEF VENT
PREVENTS INSECTS FROM w/ INSECT SCREEN.
GETTING INTO TANK.
STAINLESS STEEL STORAGE OVERFLOW PIPE w/ LOUVERED
TANK (HORIZONTAL) W/ OUTLET FOR INSECT PREVENTION (100mm).
STAINLESS STEEL(SS) LADDER NON-POTABLE WATER TO
FIRST FLUSH DIVERTER ( 1.70mØ - 3m LONG ) ( Volume of HOSE BIBB.
(DOWNPIPE-TYPE) Tank = 6,809 liters )
PVC BLUE PIPE, Ø50mm - FOR MAIN LINE
SLOW-DRIP FLOW PVC BLUE PIPE, Ø20mm - MAIN TO HOSE BIBB
100
150
ANGLE BARS
50
100mm Thk. GRAVEL FILL
100
(DIMENSIONS AND SIZES VARIES 4000 2m x 4m x 0.15m Thk. PLAIN CONCRETE SLAB
ARE BASED ON
MANUFACTURER'S
DETAILS) 2 DETAILED ELEVATION OF STAINLESS STEEL HOR. RAINWATER TANK
A 4 SCALE: 1: 50 Mts.
PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C. Y. 2022 PROJECT RHUELLE VALENTIN T. JANER
REGIONAL OFFICE II DETAILED ENGINEERING DESIGN PLAN FOR DETAILED ISOMETRIC SECTION OF STAINLESS ARCHITECT II
NUEVA VIZCAYA CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ A 4
STEEL HOR. RAINWATER TANK REYNALDO V. RAGASA, JR. EDISON C. BASILIO PERFECTO E. URBAN, JR. MARLYN G. INGUILLO
SEPTAGE & SEWERAGE/ RAINWATER COLLECTOR SYSTEM DESIGNED:
2ND DISTRICT ENGINEERING OFFICE DETAILED ELEVATION OF STAINLESS STEEL ENGINEER II OIC, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
- RAINWATER COLLECTOR IN PUBLIC FACILITIES 4 4 4
DUPAX DEL NORTE, NUEVA VIZCAYA g. DUPAX DEL SUR MHO, BRGY. DOPAJ, HOR. RAINWATER TANK JIOVANNI RUPAC - DANGAN SECTION
DUPAX DEL SUR NUEVA VIZCAYA ENGINEER II (CTO BBBP) DATE: DATE: DATE: DATE:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE II
NUEVA VIZCAYA 2ND DISTRICT ENGINEERING OFFICE
DUPAX DEL NORTE, NUEVA VIZCAYA
C. Y. 2022 PROJECT
DETAILED ENGINEERING DESIGN PLAN FOR
CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE &
SEWERAGE/ RAINWATER COLLECTOR SYSTEM- RAINWATER
COLLECTOR IN PUBLIC FACILITIES
h. BRGY. DOMANG COVERED COURT, BRGY. DOMANG,
DUPAX DEL SUR, NUEVA VIZCAYA
APPROVED:
SUBMITTED: RECOMMENDED:
04
PERSPECTIVE
A 02 PROJECT LOCATION MAP
04 SUMMARY OF QUANTITIES
VICINITY MAP
SITE DEVELOPMENT PLAN
INDEX OF DRAWINGS
ISOMETRIC VIEW OF HOR. RAINWATER TANK
A 03 DETAILED PLAN OF STAINLESS STEEL HOR.
04 RAINWATER TANK
PA
P-M
AL
-W
AN Tadji
G-B
Babadi IN
-TA
D
Bellet
-R
UN
Antutot RD
. Alamidin
Pangawan Macalong
Binogawan
Balangabang Papaya
Sayoong Kongkong
NV-BENGUE Wangal
T RD.
Monaliza Kinalo Watwat
Victoria
BA
M-K Malabing
Kayapa Gabut
A S-Q Alloy
Mabasa UE
Menchita Darapidap Lamo
Dupax -SO
LR
D.
Odom Aritao Del Norte
DM-JCT. MALASIN RD.
-NAG
RD.
Kirang Malasin Kasibu VICT
-MAD
JCT. NAT'L-BIT-BEL-NV
Comon Dine
A
Pacquet
LIK
AR
Latar Del Sur Bua
AH
Bone N.
M
Muta
G
AN
DA
Calitlitan Bone S. ARITAO-QUI
RINO RD.
RD.
Mag asawang Yaway Mantata
Salacsac kahoy Macabenga Macate
Anayo
NV-P
Malico
Consuelo Balite Santa Clara
ANGA
SINAN Santa Fe Villaflores Baliti
RD.
Baracbac Canarem Belance
Imugan Mangauit
Canabuan
Tactac Binuangan Yabbi
1 PERSPECTIVE Dalton
A 2
NORTH
SCALE: Nts.
Abaca
New Gumiad
Umubi
3 KEY LOCATION MAP
Pelaway
Lipuga A 2 SCALE: Nts.
Gadeng
Taan
Cauayan
Sitio Dinep
Abuyo
Alfonso
Castaneda
RT
G
Lublub
Marikit
RE OMAN
OU
PAN-CANILI-BASAL-BALER RD.
SUMMARY OF QUANTITIES
DC
CO GY. D
VE
BR
ITEM QUANTITY
DESCRIPTION UNIT STA
NO. LLS
AD
DU
RO
B.5 Project Billboard / Signboard 2.00 Each PU PAX
BL DE
IC L
MA SUR
B.7 (1) Occupational Safety and Health Program (PPE, Safety Personnel and Signage) 0.33 Months RK
ET
PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C. Y. 2022 PROJECT RHUELLE VALENTIN T. JANER
REGIONAL OFFICE II DETAILED ENGINEERING DESIGN PLAN FOR ARCHITECT II
NUEVA VIZCAYA CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ ISOMETRIC VIEW OF HOR. RAINWATER TANK A 3
SEPTAGE & SEWERAGE/ RAINWATER COLLECTOR SYSTEM DETAILED PLAN OF STAINLESS STEEL HOR. DESIGNED: REYNALDO V. RAGASA, JR. EDISON C. BASILIO PERFECTO E. URBAN, JR. MARLYN G. INGUILLO
2ND DISTRICT ENGINEERING OFFICE - RAINWATER COLLECTOR IN PUBLIC FACILITIES RAINWATER TANK ENGINEER II OIC, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
DUPAX DEL NORTE, NUEVA VIZCAYA h. BRGY. DOMANG COVERED COURT, BRGY. DOMANG, JIOVANNI RUPAC - DANGAN SECTION 3 4 4
DUPAX DEL SUR, NUEVA VIZCAYA ENGINEER II (CTO BBBP) DATE: DATE: DATE: DATE:
RAIN HEAD, SLOPED NOTES:
SCREEN DIVERTS DEBRIS.
1. TANK SHOULD BE FIRM, FLAT & ON STABLE PLATFORM IN ACCORDANCE
PVC PIPE, Ø100mm, S-1000.
SECOND FINER SCREEN WITH MANUFACTURER'S RECOMMENDATIONS. TANK BASE UNIT MUST BE
TANK ACCESS. SUFFICIENT TO SUPPORT WEIGHT OF TANK WHEN FULL.
PREVENTS INSECTS FROM
GETTING INTO TANK. AIR RELIEF VENT
w/ INSECT SCREEN. 2. 100% OF ROOF AREA SHALL DRAIN TO THE TANK.
FIRST FLUSH DIVERTER
(DOWNPIPE-TYPE) OVERFLOW PIPE w/ LOUVERED
3. IT IS RECOMMENDED TO CONNECT THE FOLLOWING HOUSEHOLD
OUTLET FOR INSECT
SLOW-DRIP FLOW FIXTURES TO THE RAINWATER TANK SUPPLY:
PREVENTION (100mm).
- ALL OUTDOOR TAPS
CONTROL VALVE
NON-POTABLE WATER TO - ALL TOILETS
HOSE BIBB. - WASHING MACHINE (COLD TAP)
PVC BLUE PIPE, Ø50mm - FOR MAIN LINE
4. ALL PLUMBING WORKS SHALL BE UNDERTAKEN BY A LICENSED PLUMBER
STAINLESS STEEL STORAGE PVC BLUE PIPE, Ø20mm - MAIN TO HOSE BIBB
WITH THE CONSENT OF THE MANUFACTURER & IN ACCORDANCE WITH ALL
TANK (HORIZONTAL) W/ PVC PIPE, Ø100mm, S-1000 STANDARDS, CODES & REGULATIONS.
STAINLESS STEEL(SS)
LADDER ( 1.70mØ - 3m 5. TANK & PUMP SHALL BE INSTALLED ACCORDING TO MANUFACTURER'S
LONG ) ( Volume of Tank = REQUIREMENTS.
6,809 liters )
1 DETAILED ISOMETRIC SECTION OF STAINLESS STEEL HOR. RAINWATER TANK 6. ANNUAL RAINFALL = 4464.90mm (ACCORDING TO THE HIGHEST
A 4 SCALE: Nts.
CLIMATOLOGICAL NORMAL RECORDED BY THE PHILIPPINE ATMOSPHERIC,
GEOPHYSICAL AND ASTRONOMICAL SERVICES ADMINISTRATION (PAGASA).
ALL TYPE OF ROOFING ACCEPTABLE.
PRE-PAINTED GUTTER (GA. 24) w/ SCREEN ON TOP.
PVC PIPE, Ø75mm, S-1000 (COLLECTOR PIPE FROM GUTTER)
RAIN HEAD, SLOPED
SCREEN DIVERTS DEBRIS.
PVC PIPE, Ø100mm, S-1000.
2'' GAP AT DOWNSPOUT.
TANK ACCESS.
SECOND FINER SCREEN AIR RELIEF VENT
PREVENTS INSECTS FROM w/ INSECT SCREEN.
GETTING INTO TANK.
STAINLESS STEEL STORAGE OVERFLOW PIPE w/ LOUVERED
TANK (HORIZONTAL) W/ OUTLET FOR INSECT PREVENTION (100mm).
STAINLESS STEEL(SS) LADDER NON-POTABLE WATER TO
FIRST FLUSH DIVERTER ( 1.70mØ - 3m LONG ) ( Volume of HOSE BIBB.
(DOWNPIPE-TYPE) Tank = 6,809 liters )
PVC BLUE PIPE, Ø50mm - FOR MAIN LINE
SLOW-DRIP FLOW PVC BLUE PIPE, Ø20mm - MAIN TO HOSE BIBB
CONTROL VALVE PVC PIPE, Ø100mm, S-1000
TOP OF EXISTING SLAB
ANGLE BARS
(DIMENSIONS AND SIZES
ARE BASED ON
MANUFACTURER'S
DETAILS) 2 DETAILED ELEVATION OF STAINLESS STEEL HOR. RAINWATER TANK
A 4 SCALE: 1: 50 Mts.
PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C. Y. 2022 PROJECT RHUELLE VALENTIN T. JANER
REGIONAL OFFICE II DETAILED ENGINEERING DESIGN PLAN FOR DETAILED ISOMETRIC SECTION OF STAINLESS ARCHITECT II
NUEVA VIZCAYA CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ A 4
STEEL HOR. RAINWATER TANK REYNALDO V. RAGASA, JR. EDISON C. BASILIO PERFECTO E. URBAN, JR. MARLYN G. INGUILLO
SEPTAGE & SEWERAGE/ RAINWATER COLLECTOR SYSTEM DESIGNED:
2ND DISTRICT ENGINEERING OFFICE DETAILED ELEVATION OF STAINLESS STEEL ENGINEER II OIC, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
- RAINWATER COLLECTOR IN PUBLIC FACILITIES 4 4 4
DUPAX DEL NORTE, NUEVA VIZCAYA h. BRGY. DOMANG COVERED COURT, BRGY. DOMANG,
HOR. RAINWATER TANK JIOVANNI RUPAC - DANGAN SECTION
DUPAX DEL SUR, NUEVA VIZCAYA ENGINEER II (CTO BBBP) DATE: DATE: DATE: DATE:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE II
NUEVA VIZCAYA 2ND DISTRICT ENGINEERING OFFICE
DUPAX DEL NORTE, NUEVA VIZCAYA
C. Y. 2022 PROJECT
DETAILED ENGINEERING DESIGN PLAN FOR
CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE &
SEWERAGE/ RAINWATER COLLECTOR SYSTEM- RAINWATER
COLLECTOR IN PUBLIC FACILITIES
i. DUPAX DEL SUR CENTRAL SCHOOL,BRGY. DOMANG,
DUPAX DEL SUR, NUEVA VIZCAYA
APPROVED:
SUBMITTED: RECOMMENDED:
04
PERSPECTIVE
A 02 PROJECT LOCATION MAP
04 SUMMARY OF QUANTITIES
VICINITY MAP
SITE DEVELOPMENT PLAN
INDEX OF DRAWINGS
ISOMETRIC VIEW OF HOR. RAINWATER TANK
A 03 DETAILED PLAN OF STAINLESS STEEL HOR.
04 RAINWATER TANK
PA
P -M
AL
-W
AN Tadji
G-B
Babadi IN
-TA
D-R
Bellet
UN
Antutot RD
. Alamidin
Pangawan Macalong
Binogawan
Balangabang Papaya
Sayoong Kongkong
NV-BENGUE Wangal
T RD.
Monaliza Kinalo Watwat
Victoria
BA
M-K Malabing
Kayapa Gabut
AS Alloy
Mabasa -Q
UE
Menchita Darapidap Lamo
Dupax -SO
LR
D.
Odom Aritao Del Norte
DM-JCT. MALASIN RD.
-N AG
RD.
Kirang Malasin Kasibu VICT
-MAD
JCT. NAT'L-BIT-BEL-NV
Comon Dine
A
Pacquet
LIK
AR
Latar Del Sur Bua
AH
Bone N.
M
Muta
G
AN
DA
Calitlitan Bone S. ARITAO-QUI
RINO RD.
RD.
Mag asawang Yaway Mantata
Salacsac kahoy Macabenga Macate
Anayo
NV-P
Malico
Consuelo Balite Santa Clara
ANGA
SINA Santa Fe Villaflores Baliti
PERSPECTIVE
N RD
Baracbac
.
Canarem Belance
Imugan Mangauit
1 Tactac
Canabuan
Binuangan Yabbi
Dalton
A 2 SCALE: Nts.
NORTH
Abaca Umubi 3
Pelaway
Lipuga
Gadeng
A 2 SCALE: Nts.
Taan
SUMMARY OF QUANTITIES
Cauayan
Sitio Dinep CL
AS
SR
Abuyo
OO
ITEM QUANTITY
M
S
DESCRIPTION UNIT PR
NO. IN
Alfonso OF CIP
FI AL'
PART I. FACILITIES FOR THE ENGINEER Castaneda CE S
Lublub CL
A.1.4 (1) Provisions of Progress Photographs 0.33 Months Marikit
PAN-CANILI-BASAL-BALER RD.
AS
SR
OOM
PART II. OTHER GENERAL REQUIREMENTS S
T
B.9 Mobilization/Demobilization 1.00 L.S.
UR
CO
S
CIVIL, MECHANICAL, ELECTRICAL AND SANITARY/PLUMBING WORKS
M
PART III.
D
RE
OO
VE
SR
PART A. EARTHWORKS
CO
AS
CL
803 (1)a Structure Excavation 0.80 cu.m CL
AS
SR
804 (4) 0.80 cu.m AD OO
Gravel Fill RO
S
M
M
S
OO
ND
OU Y
PART B. PLAIN AND REINFORCED CONCRETE WORKS
GR PLA
SR
AS
900 (1)b1 Structural Concrete (Class A, 14 Days) 1.20 cu.m
CL
PART D. PLUMBING/SANITARY WORKS 2 VICINITY MAP 4 SITE DEVELOPMENT PLAN
1001 (9) Strom Drinage and Downspout 1.00 L.S. A 2 SCALE: Nts.
A 2 SCALE: Nts.
1002 (27) Plumbing Fixtures 1.00 L.S.
PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C. Y. 2022 PROJECT PERSPECTIVE RHUELLE VALENTIN T. JANER
REGIONAL OFFICE II DETAILED ENGINEERING DESIGN PLAN FOR PROJECT LOCATION MAP ARCHITECT II
NUEVA VIZCAYA CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ A 2
SUMMARY OF QUANTITIES REYNALDO V. RAGASA, JR. EDISON C. BASILIO PERFECTO E. URBAN, JR. MARLYN G. INGUILLO
SEPTAGE & SEWERAGE/ RAINWATER COLLECTOR SYSTEM DESIGNED:
2ND DISTRICT ENGINEERING OFFICE VICINITY MAP ENGINEER II OIC, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
- RAINWATER COLLECTOR IN PUBLIC FACILITIES 2 4 4
DUPAX DEL NORTE, NUEVA VIZCAYA i. DUPAX DEL SUR CENTAL SCHOOL, BRGY. DOMANG, SITE DEVELOPMENT PLAN JIOVANNI RUPAC - DANGAN SECTION
DUPAX DEL SUR, NUEVA VIZCAYA INDEX OF DRAWINGS ENGINEER II (CTO BBBP) DATE: DATE: DATE: DATE:
NOTES:
2000
PVC BLUE PIPE, Ø20mm - MAIN TO HOSE BIBB
PVC PIPE, Ø100mm, S-1000
STAINLESS STEEL STORAGE TANK (HORIZONTAL)
FIRST FLUSH DIVERTER W/ STAINLESS STEEL(SS) LADDER ( 1.70mØ - 3m
(DOWNPIPE-TYPE) LONG ) ( Volume of Tank = 6,809 liters )
PROVIDE GI PVC PIPE CLAMP. VARIES 4000 2m x 4m x 0.15m Thk. PLAIN CONCRETE SLAB
PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C. Y. 2022 PROJECT RHUELLE VALENTIN T. JANER
REGIONAL OFFICE II DETAILED ENGINEERING DESIGN PLAN FOR ARCHITECT II
NUEVA VIZCAYA CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ ISOMETRIC VIEW OF HOR. RAINWATER TANK A 3
SEPTAGE & SEWERAGE/ RAINWATER COLLECTOR SYSTEM DETAILED PLAN OF STAINLESS STEEL HOR. DESIGNED: REYNALDO V. RAGASA, JR. EDISON C. BASILIO PERFECTO E. URBAN, JR. MARLYN G. INGUILLO
2ND DISTRICT ENGINEERING OFFICE - RAINWATER COLLECTOR IN PUBLIC FACILITIES RAINWATER TANK ENGINEER II OIC, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
DUPAX DEL NORTE, NUEVA VIZCAYA i. DUPAX DEL SUR CENTAL SCHOOL, BRGY. DOMANG, JIOVANNI RUPAC - DANGAN SECTION 3 4 4
DUPAX DEL SUR, NUEVA VIZCAYA ENGINEER II (CTO BBBP) DATE: DATE: DATE: DATE:
RAIN HEAD, SLOPED NOTES:
SCREEN DIVERTS DEBRIS.
1. TANK SHOULD BE FIRM, FLAT & ON STABLE PLATFORM IN ACCORDANCE
PVC PIPE, Ø100mm, S-1000.
SECOND FINER SCREEN WITH MANUFACTURER'S RECOMMENDATIONS. TANK BASE UNIT MUST BE
TANK ACCESS. SUFFICIENT TO SUPPORT WEIGHT OF TANK WHEN FULL.
PREVENTS INSECTS FROM
GETTING INTO TANK. AIR RELIEF VENT
w/ INSECT SCREEN. 2. 100% OF ROOF AREA SHALL DRAIN TO THE TANK.
FIRST FLUSH DIVERTER
(DOWNPIPE-TYPE) OVERFLOW PIPE w/ LOUVERED
3. IT IS RECOMMENDED TO CONNECT THE FOLLOWING HOUSEHOLD
OUTLET FOR INSECT
SLOW-DRIP FLOW FIXTURES TO THE RAINWATER TANK SUPPLY:
PREVENTION (100mm).
- ALL OUTDOOR TAPS
CONTROL VALVE
NON-POTABLE WATER TO - ALL TOILETS
HOSE BIBB. - WASHING MACHINE (COLD TAP)
PVC BLUE PIPE, Ø50mm - FOR MAIN LINE
4. ALL PLUMBING WORKS SHALL BE UNDERTAKEN BY A LICENSED PLUMBER
STAINLESS STEEL STORAGE PVC BLUE PIPE, Ø20mm - MAIN TO HOSE BIBB
WITH THE CONSENT OF THE MANUFACTURER & IN ACCORDANCE WITH ALL
TANK (HORIZONTAL) W/ PVC PIPE, Ø100mm, S-1000 STANDARDS, CODES & REGULATIONS.
STAINLESS STEEL(SS)
LADDER ( 1.70mØ - 3m 2m x 4m x 0.15m Thk. PLAIN CONCRETE SLAB 5. TANK & PUMP SHALL BE INSTALLED ACCORDING TO MANUFACTURER'S
LONG ) ( Volume of Tank = REQUIREMENTS.
6,809 liters )
1 DETAILED ISOMETRIC SECTION OF STAINLESS STEEL HOR. RAINWATER TANK
6. ANNUAL RAINFALL = 4464.90mm (ACCORDING TO THE HIGHEST
A 4 SCALE: Nts.
CLIMATOLOGICAL NORMAL RECORDED BY THE PHILIPPINE ATMOSPHERIC,
GEOPHYSICAL AND ASTRONOMICAL SERVICES ADMINISTRATION (PAGASA).
ALL TYPE OF ROOFING ACCEPTABLE.
PRE-PAINTED GUTTER (GA. 24) w/ SCREEN ON TOP.
PVC PIPE, Ø75mm, S-1000 (COLLECTOR PIPE FROM GUTTER)
RAIN HEAD, SLOPED
SCREEN DIVERTS DEBRIS.
PVC PIPE, Ø100mm, S-1000.
2'' GAP AT DOWNSPOUT.
TANK ACCESS.
SECOND FINER SCREEN AIR RELIEF VENT
PREVENTS INSECTS FROM w/ INSECT SCREEN.
GETTING INTO TANK.
STAINLESS STEEL STORAGE OVERFLOW PIPE w/ LOUVERED
TANK (HORIZONTAL) W/ OUTLET FOR INSECT PREVENTION (100mm).
STAINLESS STEEL(SS) LADDER NON-POTABLE WATER TO
FIRST FLUSH DIVERTER ( 1.70mØ - 3m LONG ) ( Volume of HOSE BIBB.
(DOWNPIPE-TYPE) Tank = 6,809 liters )
PVC BLUE PIPE, Ø50mm - FOR MAIN LINE
SLOW-DRIP FLOW PVC BLUE PIPE, Ø20mm - MAIN TO HOSE BIBB
100
150
ANGLE BARS
50
100mm Thk. GRAVEL FILL
100
(DIMENSIONS AND SIZES VARIES 4000 2m x 4m x 0.15m Thk. PLAIN CONCRETE SLAB
ARE BASED ON
MANUFACTURER'S
DETAILS) 2 DETAILED ELEVATION OF STAINLESS STEEL HOR. RAINWATER TANK
A 4 SCALE: 1: 50 Mts.
PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C. Y. 2022 PROJECT RHUELLE VALENTIN T. JANER
REGIONAL OFFICE II DETAILED ENGINEERING DESIGN PLAN FOR DETAILED ISOMETRIC SECTION OF STAINLESS ARCHITECT II
NUEVA VIZCAYA CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ A 4
STEEL HOR. RAINWATER TANK REYNALDO V. RAGASA, JR. EDISON C. BASILIO PERFECTO E. URBAN, JR. MARLYN G. INGUILLO
SEPTAGE & SEWERAGE/ RAINWATER COLLECTOR SYSTEM DESIGNED:
2ND DISTRICT ENGINEERING OFFICE DETAILED ELEVATION OF STAINLESS STEEL ENGINEER II OIC, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
- RAINWATER COLLECTOR IN PUBLIC FACILITIES 4 4 4
DUPAX DEL NORTE, NUEVA VIZCAYA i. DUPAX DEL SUR CENTAL SCHOOL, BRGY. DOMANG,
HOR. RAINWATER TANK JIOVANNI RUPAC - DANGAN SECTION
DUPAX DEL SUR, NUEVA VIZCAYA ENGINEER II (CTO BBBP) DATE: DATE: DATE: DATE: