JB Checklist Dap-1
JB Checklist Dap-1
CV Signal
1 JB-1 PNR TOP PCV-210
FCV-202
SOV-24 V DC
3 JB-3 PNR TOP XV-202
SOV-24 V DC
5 JB-5 4204 Bucket Elevator Top
XV-503
6 JB-6 4205 Bucket Elevator Top AFR and OIL bowl to XV-503
AFR XV-206
7 JB-7 PNR MIDDLE FLOOR AFR XV-207
SOV-201-24 V DC
9 JB-9 PNR MIDDLE FLOOR SOV-207-24 V DC
10 JB-10 PNR MIDDLE FLOOR AFR XV-204
AFR XV-209
SOV-24 V DC
11 JB-11 PNR MIDDLE FLOOR XV-206
XV-209
SOV- 24 V DC
12 JB-12 PNR MIDDLE FLOOR XV-204
XV-205
4205 Bucket
6 JB-6 Elevator Top XV 503 A/S to SOV
PNR MIDDLE
7 JB-7 FLOOR Air supply to SOV 206&207
GRANULATOR
20 JB-20 FLOOR 1.FCV-304,503,843,501,841,204
GRANULATOR
21 JB-21 FLOOR BACKSIDE 0.2 to 1 kg/cm2 signal to FCV-841
PRE MONSOON JB CHECKLIST
PHYSICAL CHECK DIRT, CHECK SPARE CHECK PHYSICAL CHECK DIRT & CHECK
DUST CHECK CABLE CHECK CABLE TEMPERATURE OF DUST MOISTURE
SL NO JB NO LOCATION CHECK DEPOSITED AT ENTRY GLAND HOLES ROUTING JB BY NEARBY CHECKS DEPOSITION DEPOSITION DATE REMARKS SERVICE
(OUT SIDE) OUTER AREA SEALING HEATING OBJECT (INSIDE) INSIDE JB INSIDE JB
GRANULATOR
24 JB-24 FLOOR BACKSIDE Air supply to SOV-501
NH3 SCRUBBER
25 JB-25 BOTTOM RING Air supply to FCV-843 positioner.
HEADER
NEAR AMMONIA
28 JB-28 SCRUBBER TOTAL Pneumatic signal for FCV-
303,840,842,305
MAG FLOW
FIRST STAIRCASE
40 JB-40 OF GAS SCRUBBER A/S TO FCV-307 POSITIONER
49 JB-49 QC FAIL BELT 4211 LOAD CELL & TACHO SIGNAL FOR
WT-4211
LOAD CELL & TACHO SIGNAL FOR
50 JB-50 KCL BELT AREA WIC-830
DAP#1 GAS SCR 230V POWER JB AT STACK
51 JB-51 STACK ANALYSER