You are on page 1of 1

SAYAN ENTERPRISES

HAZARD IDENTIFICATION & RISK ASSESSMENT( HIRA)


Doc. No:-SE/HIRA/1.5-L/R-01 Department : CIVIL
Process / Activity : PAINTING OF STRUCTURAL BUILDING Date of Study: 20.09.2022
Risk Assessment
Type Manning Facility Hazard Source Consequence * Ranking (1/2/3)
(Score)

Process/ Equipment
Evaluation Team
Sub Processes /
Sl No.

Remarks /
Hazard including concerned

CO/CP/CE etc.

Domino Effect
Activities Reference
Employee(s)

Detectibility
HB/HC/OHF

Probability
ILL Health

S (26-75)
UA (>75)
OAI / IAV

Duration

A (2-25)
Severity
LR/OR

Injury

IS (1)
Scale
R NR Own OS Own OS
Making scaffolding fall of
1
and platform material
OR
√ √ √
HB √ OM T 2 2 2 1 3 24
during
erection
falling of
tools from top
OR
√ √ √
HB OM T 1 2 2 1 3 12
fall of person
OR
√ √ √
HB √ F T 1 2 2 1 3 12 Safety

Supervisor
Appilcation of paint falling of
2
paint
OR
√ √ √
OHF E T 1 2 3 1 3 18

surface preparation fall of tools


3 OR
√ √ √
HC √ OM 1 2 3 2 2 24

R- Routine HB- Human Behaviour CO- Change in Organisation UA - Unacceptable


Occupational Health Measure Required / Not Required NR - Non Routine HC- Human capability CP- Change in Process S - Significant
OS -Out Source OHF- Other Human factors CE- Change in Equipment A - Acceptable
Comments : LR - Legal Requirement IAV- Inside affecting Vicinity IS - Insignificant
OR - Other Requirement OAI- Outside affecting inside

* Injuries and Ill health to be mentioned as below: Authorised Signature


C- Cut Injury, F-Fracture, M- Fall of material, P- Fall of person, B- Burn injury, E- Eye injury S- Electrical shock,HC- Haz. chemical exposure
OM- Other minor injury, OS- Other serious injury
R- Respiratory problem, H- Hearing impairment, D- Dehydration, ER- Ergonomic problem, T- Temporary physical problem, O- Other serious health problem