You are on page 1of 2

M Azahar EM 08/21/19

Internal Dwg. No: 706174-30GCOT-LP-PID-0002 CLASS: 1


841

594
49-T -14000C 49-T -14000D 49-T -14000E
H CRUDE OIL STORAGE TANK-3 CRUDE OIL STORAGE TANK-4 CRUDE OIL STORAGE TANK-5
PI
86000

F&G
86000

False
False

50 SP
50 SP

03
02

2-0
2-0
False

50 SP
PT

01
2-0
2-1/2" 2-1/2" 86000

GA-FF-017
GA-FF-016
1

GA-FF-015
GA-FF-006
1

3/4"
FROM FIXED FOAM

4"
4"
1"
SYSTEM PACKAGE 10"
10"-FF-83001-018011GX B.V.
512 GF-GCOT-X-14-8507

GA-FF-005
CS-FF-001

2"

GA-FF-001

GA-FF-007

GA-FF-008

GA-FF-003

GA-FF-002

GA-FF-004
NC

NC

NC

NC
NC

NC
6"

6"

6"

6"
6"

6"
(NOTE-3,8)

True True True True

SP 0 SP 1 SP 4 SP 015
2-01 2-01 2-01 2-
50 50 50 50

1 NOTE-4 NOTE-4 NOTE-4 NOTE-4

6"-FF-83007-018011GX

6"-FF-83006-018011GX

6"-FF-83005-018011GX

6"-FF-83004-018011GX

6"-FF-83003-018011GX

6"-FF-83002-018011GX
1 1 1

8" 8" 8" 8"

4" 4" 4" 4"

49-T-14000D 49-T-14000E
True
TRAIN-4 TRAIN-5
SP 04
02-0
5

GA-FF-011
1"
DRAIN

GA-FF-014
True

SP 005

1"
2-
50
DRAIN

GA-FF-010
True

SP 006

1"
2-
50
DRAIN

GA-FF-012
True True

SP 012 SP 013
True

SP 007

1"
2- 2-
50 50 2-
NOTE-4 NOTE-4 50
DRAIN 1 1

8" 8"

4" 4"

49-T-14000C
TRAIN-3

GA-FF-009
True

SP 008

1"
2-
50
DRAIN

GA-FF-013 True

SP 009
1"

2-
50
DRAIN

HOLDS:
1. DELETED.

PROJECT TITLE
NOTES: PCIHBV COMMENT CONTRACT NO. PCIHBV/PD&T/1570
PROVISION OF ENGINEERING, PROCUREMENT, CONSTRUCTION
1. ALL EQUIPMENT SP ITEM, VALVE TAG, TIE-IN POINT AND INSTRUMENT TAG NUMBERS ON THIS DRAWING
SHALL BE PREFIXED BY LOCATION IDENTIFIER AS FOLLOWS: APPROVED/REVIEWED
JOB NO. 706174 AND COMMISSIONING(EPCC) FOR OIL TRAIN 3, 4 AND 5
A) TRAIN 3,4 - 50, DRAWING TITLE
B) TRAIN 5 - 56, DRAWN BY MG
C) STORAGE, METERING AND FLARE AREA - 49.
APPROVED WITH COMMENT PIPING AND INSTRUMENTATION DIAGRAM
2. FOAM PACKAGE SHALL BE UL/FM LISTED. DATE 13.02.19 TRAIN 3, 4, 5 (GIFT)
3. BLOCK VALVES SHALL BE LOCATED 15M AWAY FROM THE PROTECTED TANKS. RESUBMIT FOR APPROVAL
NONE
MISHRIF CRUDE OIL STORAGE TANK FOAM SYSTEM
4. FIXED FOAM SYSTEM INCLUDES FOAM CONCENTRATE BLADDER TANK, FOAM PROPORTIONER AND FOAM SCALE
POURERS FOR STORAGE TANKS.
RESUBMIT FOR REVIEW CHECKED RG/AB
5. DELETED.
CLIENT CONTRACTOR
6 ALL THE DISTRIBUTION PIPING FOR FOAM SYSTEM SHALL BE ARRANGE TO BE FREE DRAINED SO THAT
NAME SIGNATURE TITLE DATE 13.02.19
THE FOAM WATER SOLUTION CAN BE FLUSHED OUT AFTER USE. THE DRAIN VALVES TO BE PROVIDED DATE
AT THE LOWEST POINTS FOR FOAM PIPING.
7 FOAM CONCENTRATE SHALL BE AQUEOUS FILM FORMING (AFFF) TYPE. The signing, countersigning or other endorsements 1 REISSUED FOR CONSTRUCTION 20.08.19 KD RG/AB JY APPROVED JY
of any drawings and documentation by PCIHBV'S
8 FOAM SYSTEM SHALL BE ACTIVATED MANUALLY ONCE THE FIRE HAS BEEN VISUALLY OBSERVED ON representatives, agents or employees shall neither
TANK AREA THROUGH CCTV. be construed as implying the responsibility for the 0 APPROVED FOR CONSTRUCTION 13.02.19 KD RG/AB JY DATE 13.02.19
correctness and accuracy of such documents nor THE ORIGINAL AND ALL COPIES OF THIS DRAWING NO SHEET REV.
9 FOR CRUDE STORAGE TANK DELUGE SYSTEM REFER TO P&ID GF-GCOT-X-14-8501.
relieving the CONTRACTOR of its obligations to BY CHKD APPD APPD DRAWING TOGETHER WITH THE
review all information, data, drawings, and DRAWING NO. REFERENCE DRAWINGS REV DESCRIPTIONS DATE CONTRACTOR COPYRIGHT THEREOF ARE THE THE SOLE GF-GCOT-X-14-8502 01/01 1
specifications provided by PCIHBV. CONTRACTOR CLIENT PROPERTY OF PCIHBV

CAD FILE: GF-GCOT-X-14-8502.dwg

A1