M Azahar EM 02/02/20

Internal Dwg. No: 706174-30GCOT-PR-PID-0032 CLASS: 1


841

594
NOTE-1
False

SP 001
6-
02
1 2" 1

NOTE-2
1 AG UG BR-DC-041
FROM METERING AND 1 1 NC
STORAGE AREA OPEN DRAIN SLOPE
1:300 3"-DC-64095-011440GY FROM CRUDE OIL STORAGE
280 GF-GCOT-B-14-4028 SLOPE TANK 5 DEGASSING BOOT
(49-AQ-64060) 2"-DC-64016-011440GY 1:300
GF-GCOT-B-14-4004 275
(49-V-14010E)

FROM CRUDE OIL EXPORT


HEADER/JUMPER LINE SLOPE
1:300 2"-DC-64059-011440GY
269 GF-GCOT-B-14-4009
FROM CRUDE OIL
SLOPE STORAGE TANK 5
4"-DC-64015-011440GY 1:300
GF-GCOT-B-14-4004 270
(49-T-14000E)

3"-DC-64110-011440GY

FROM CRUDE OIL STORAGE


1 SLOPE TANK 4 DEGASSING BOOT
2"-DC-64012-011440GY 1:300
GF-GCOT-B-14-4003 276
(49-T-14000D)

1
FROM CRUDE OIL FROM CRUDE OIL
SLOPE 3"-DC-64098-011440GY SLOPE STORAGE TANK 4
EXPORT PUMP D 4"-DC-64011-011440GY 1:300
1:300 2"-DC-64023-011440GY GF-GCOT-B-14-4003 277
263 GF-GCOT-B-14-4006
(49-V-14010D)
(49-P-13010D) 1

FROM CRUDE OIL FROM CRUDE OIL


SLOPE SLOPE STORAGE TANK 3
EXPORT PUMP E 4"-DC-64102-011440GY 1:300
1:300 2"-DC-64029-011440GY GF-GCOT-B-14-4002 278
262 GF-GCOT-B-14-4007
(49-P-13010E) 1 (49-T-14000C)

6"-DC-64097-011440GY
FROM CRUDE OIL FROM CRUDE OIL STORAGE
SLOPE SLOPE TANK 3 DEGASSING BOOT
EXPORT PUMP F 2"-DC-64007-011440GY 1:300
1:300 2"-DC-64035-011440GY GF-GCOT-B-14-4002 279
261 GF-GCOT-B-14-4008
(49-P-13010F) (49-V-14010C)

1
1
FROM CRUDE OIL
BOOSTER PUMP D SLOPE
1:300 2"-DC-64024-011440GY
266 GF-GCOT-B-14-4006
(49-P-13000D)

FROM CRUDE OIL TO STORAGE AREA


BOOSTER PUMP E SLOPE CLOSED DRAIN DRUM
1:300 2"-DC-64030-011440GY 6"-DC-64096-011440GY
265 GF-GCOT-B-14-4007 281 GF-GCOT-B-14-4027
(49-P-13000E) (49-V-64030)

FROM CRUDE OIL


BOOSTER PUMP F SLOPE
1:300 2"-DC-64036-011440GY
264 GF-GCOT-B-14-4008
(49-P-13000F)

2" 1

NOTE-3 BR-DC-040 AG UG
False
NC NOTE-2
SP 002
6-
02

PROJECT TITLE
NOTES: PCIHBV COMMENT CONTRACT NO. PCIHBV/PD&T/1570
PROVISION OF ENGINEERING, PROCUREMENT, CONSTRUCTION
1. ALL EQUIPMENT, SP ITEM AND INSTRUMENT TAG NUMBERS ON THIS DRAWING SHALL BE PREFIXED
BY LOCATION IDENTIFIER (49), UNLESS SPECIFIED OTHERWISE. APPROVED/REVIEWED
JOB NO. 706174 AND COMMISSIONING(EPCC) FOR OIL TRAIN 3, 4 AND 5
2. ABOVE GROUND AND UNDER GROUND DEMARCATIONS ARE INDICATIVE ONLY. TO BE CONFIRMED DRAWING TITLE
AFTER ROUTING FINALIZATION. DRAWN BY MG
3. NUMBER AND LOCATION OF FLUSHING AND RODDING POINTS TO BE CONFIRMED AFTER ROUTING
APPROVED WITH COMMENT PIPING AND INSTRUMENTATION DIAGRAM
FINALIZATION. DATE 02.08.18 UTILITIES (TRAIN 3,4,5)
RESUBMIT FOR APPROVAL
NONE
STORAGE AREA CLOSED DRAIN HEADER
SCALE

RESUBMIT FOR REVIEW CHECKED BKP/AB


CLIENT CONTRACTOR
NAME SIGNATURE TITLE DATE 02.08.18
DATE

The signing, countersigning or other endorsements 1 APPROVED FOR CONSTRUCTION 29.01.20 JK BKP/AB JY APPROVED JY
of any drawings and documentation by PCIHBV'S
representatives, agents or employees shall neither
be construed as implying the responsibility for the 0 APPROVED FOR CONSTRUCTION 22.11.18 KD BKP/AB JY DATE 02.08.18
correctness and accuracy of such documents nor THE ORIGINAL AND ALL COPIES OF THIS DRAWING NO SHEET REV.
relieving the CONTRACTOR of its obligations to BY CHKD APPD APPD DRAWING TOGETHER WITH THE
review all information, data, drawings, and DRAWING NO. REFERENCE DRAWINGS REV DESCRIPTIONS DATE CONTRACTOR COPYRIGHT THEREOF ARE THE THE SOLE GF-GCOT-B-14-4026 01/01 1
specifications provided by PCIHBV. CONTRACTOR CLIENT PROPERTY OF PCIHBV

CAD FILE: GF-GCOT-B-14-4026.dwg