Vessel Ref Number COC‐1 Operation Checking container lashing at sea Date 15‐Oct‐18
Possible
Activity / Operation Consequence /
Analyze/review/Assess – Controls Required Extent of Consequences - Severity (S)
Hazard /
WHAT IF? Impact
1 2 3 4
Likelihood (L)
Negligible Marginal Critical Catastrophic
Checking container lashing at Slippery surface on weather COSWP 4.0, Proper PPE to be worn and
3 sea decks
Personal injury 2 2 4 housekeeping
1 2 2
Residual Risk after applying existing Additional Control Measures if required for the Final Risk after applying Additional control
Activity to be Performed
Hazards associated with this control measures hazard (pls list measures
(Pls list all activities to be
Sr No. activity Severity all additional measures incase if the risk Factor is Severity
preformed while doing this Likelihood (L) Risk Factor Likelihood (L) Risk Factor (L
(Pls List all hazards ) (S) (1‐ above 6 even after applying existing control (S)
operation) (1‐5) (L x S) (1‐5) x S)
5) measures) (1‐5)
If Final Risk is still above 6 after applying additional measures then pls send the RA to Office and get approval prior conducting the job
Reviewed In Office By Comments Date
This Risk assessment was prepared by Following Persons
Name Rank Sign
Reviewed By HOD :
Approved by Master :
Record of Periodic Review of this Risk Assessment (Prior conducting this operation or every 12 months whichever is lesser)
Date this RA was reviewed Reviewed By (Name & Sign) Master (Name & Sign) Comments
Incase after Review of this Risk Assessment it was decided to revise the Risk assessment then Pls complete below section
Date This RA is Closed out By Master Ref Number of new RA that replaces this RA
Note: 1. To be sent to company. 2. Retention period of this document on board and in office is 3 years. 3. Extend Space as required. 4. RA for Special, Critical Operations and Non-Routine operations as well as RA for any other Operation where the Risk factor
can not be reduced to 6 or below shall be sent to company for approval.
Union Marine Management Services Pte Ltd Shipboard Procedures Manual
TITLE: VER No – 03/ REV No -01 DATE – 15/10/2018
RISK ASSESSMENT AND HAZARD IDENTIFICATION TABLE SECTION : SPM – 14 PREPARED BY – DPA
SPMF 14‐01 APPROVED BY – MD
Vessel Ref Number COC‐2 Operation Live Stock Carriage Date 15‐Oct‐18
Possible
Activity / Operation Consequence /
Analyze/review/Assess – Controls Required Extent of Consequences - Severity (S)
Hazard /
WHAT IF? Impact
1 2 3 4
Likelihood (L)
Negligible Marginal Critical Catastrophic
2 Live Stock Carriage Support / Maintenance /Hygiene Sanitation,Illness 2 2 4 Maintain Hygiene & Cleanliness 1 2 2
Residual Risk after applying existing Additional Control Measures if required for the Final Risk after applying Additional control
Activity to be Performed
Hazards associated with this control measures hazard (pls list measures
(Pls list all activities to be
Sr No. activity Severity all additional measures incase if the risk Factor is Severity
preformed while doing this Likelihood (L) Risk Factor Likelihood (L) Risk Factor (L
(Pls List all hazards ) (S) (1‐ above 6 even after applying existing control (S)
operation) (1‐5) (L x S) (1‐5) x S)
5) measures) (1‐5)
If Final Risk is still above 6 after applying additional measures then pls send the RA to Office and get approval prior conducting the job
Reviewed In Office By Comments Date
This Risk assessment was prepared by Following Persons
Name Rank Sign
Reviewed By HOD :
Approved by Master :
Record of Periodic Review of this Risk Assessment (Prior conducting this operation or every 12 months whichever is lesser)
Date this RA was reviewed Reviewed By (Name & Sign) Master (Name & Sign) Comments
Incase after Review of this Risk Assessment it was decided to revise the Risk assessment then Pls complete below section
Date This RA is Closed out By Master Ref Number of new RA that replaces this RA
Note: 1. To be sent to company. 2. Retention period of this document on board and in office is 3 years. 3. Extend Space as required. 4. RA for Special, Critical Operations and Non-Routine operations as well as RA for any other Operation where the Risk factor can
not be reduced to 6 or below shall be sent to company for approval.
Union Marine Management Services Pte Ltd Shipboard Procedures Manual
TITLE: VER No – 03/ REV No -01 DATE – 15/10/2018
RISK ASSESSMENT AND HAZARD IDENTIFICATION TABLE SECTION : SPM – 14 PREPARED BY – DPA
SPMF 14‐01 APPROVED BY – MD
Vessel Ref Number COC‐3 Operation Reefer temperature monitoring at sea. Date 15‐Oct‐18
Possible
Activity / Operation Consequence /
Analyze/review/Assess – Controls Required Extent of Consequences - Severity (S)
Hazard /
WHAT IF? Impact
1 2 3 4
Likelihood (L)
Negligible Marginal Critical Catastrophic
Reefer temperature monitoring Slippery surface on weather COSWP 4.0, Proper PPE to be worn and
3 at sea. decks
Personal injury 2 3 6 housekeeping, HSM
1 3 3
Reefer temperature monitoring Incorrect reading of temperature 1.The temperature to be monitored with
6 at sea. reading.Celsius/Fahrenhiet units
Wrong Readings Claims 3 2 6 respect to Reefer manifest only.
2 2 4
Residual Risk after applying existing Additional Control Measures if required for the Final Risk after applying Additional control
Activity to be Performed
Hazards associated with this control measures hazard (pls list measures
(Pls list all activities to be
Sr No. activity Severity all additional measures incase if the risk Factor is Severity
preformed while doing this Likelihood (L) Risk Factor Likelihood (L) Risk Factor (L
(Pls List all hazards ) (S) (1‐ above 6 even after applying existing control (S)
operation) (1‐5) (L x S) (1‐5) x S)
5) measures) (1‐5)
If Final Risk is still above 6 after applying additional measures then pls send the RA to Office and get approval prior conducting the job
Reviewed In Office By Comments Date
This Risk assessment was prepared by Following Persons
Name Rank Sign
Reviewed By HOD :
Approved by Master :
Record of Periodic Review of this Risk Assessment (Prior conducting this operation or every 12 months whichever is lesser)
Date this RA was reviewed Reviewed By (Name & Sign) Master (Name & Sign) Comments
Incase after Review of this Risk Assessment it was decided to revise the Risk assessment then Pls complete below section
Date This RA is Closed out By Master Ref Number of new RA that replaces this RA
Note: 1. To be sent to company. 2. Retention period of this document on board and in office is 3 years. 3. Extend Space as required. 4. RA for Special, Critical Operations and Non-Routine operations as well as RA for any other Operation where the Risk factor can
not be reduced to 6 or below shall be sent to company for approval.
Union Marine Management Services Pte Ltd Shipboard Procedures Manual
TITLE: VER No – 03/ REV No -01 DATE – 15/10/2018
RISK ASSESSMENT AND HAZARD IDENTIFICATION TABLE SECTION : SPM – 14 PREPARED BY – DPA
SPMF 14‐01 APPROVED BY – MD
Vessel Ref Number COC‐4 Operation Container lashings/Unlashing in port Date 15‐Oct‐18
Possible
Activity / Operation Consequence /
Analyze/review/Assess – Controls Required Extent of Consequences - Severity (S)
Hazard /
WHAT IF? Impact
1 2 3 4
Likelihood (L)
Negligible Marginal Critical Catastrophic
Residual Risk after applying existing Additional Control Measures if required for the Final Risk after applying Additional control
Activity to be Performed
Hazards associated with this control measures hazard (pls list measures
(Pls list all activities to be
Sr No. activity Severity all additional measures incase if the risk Factor is Severity
preformed while doing this Likelihood (L) Risk Factor Likelihood (L) Risk Factor (L
(Pls List all hazards ) (S) (1‐ above 6 even after applying existing control (S)
operation) (1‐5) (L x S) (1‐5) x S)
5) measures) (1‐5)
If Final Risk is still above 6 after applying additional measures then pls send the RA to Office and get approval prior conducting the job
Reviewed In Office By Comments Date
This Risk assessment was prepared by Following Persons
Name Rank Sign
Reviewed By HOD :
Approved by Master :
Record of Periodic Review of this Risk Assessment (Prior conducting this operation or every 12 months whichever is lesser)
Date this RA was reviewed Reviewed By (Name & Sign) Master (Name & Sign) Comments
Incase after Review of this Risk Assessment it was decided to revise the Risk assessment then Pls complete below section
Date This RA is Closed out By Master Ref Number of new RA that replaces this RA
Note: 1. To be sent to company. 2. Retention period of this document on board and in office is 3 years. 3. Extend Space as required. 4. RA for Special, Critical Operations and Non-Routine operations as well as RA for any other Operation where the Risk factor can
not be reduced to 6 or below shall be sent to company for approval.
Union Marine Management Services Pte Ltd Shipboard Procedures Manual
TITLE: VER No – 03/ REV No -01 DATE – 15/10/2018
RISK ASSESSMENT AND HAZARD IDENTIFICATION TABLE SECTION : SPM – 14 PREPARED BY – DPA
SPMF 14‐01 APPROVED BY – MD
Vessel Ref Number COC‐5 Operation Loading / discharging / carriage of dangerous goods Date 15‐Oct‐18
Possible
Activity / Operation Consequence /
Analyze/review/Assess – Controls Required Extent of Consequences - Severity (S)
Hazard /
WHAT IF? Impact
1 2 3 4
Likelihood (L)
Negligible Marginal Critical Catastrophic
Loading / discharging / carriage DG Manifest not received prior Load plan to be approved only after receiving
7 of dangerous goods loading
Incorrect segregation,Fire hazard 2 3 6 proper shipping documents for DG cargo.
1 3 3
Residual Risk after applying existing Additional Control Measures if required for the Final Risk after applying Additional control
Activity to be Performed
Hazards associated with this control measures hazard (pls list measures
(Pls list all activities to be
Sr No. activity Severity all additional measures incase if the risk Factor is Severity
preformed while doing this Likelihood (L) Risk Factor Likelihood (L) Risk Factor (L
(Pls List all hazards ) (S) (1‐ above 6 even after applying existing control (S)
operation) (1‐5) (L x S) (1‐5) x S)
5) measures) (1‐5)
If Final Risk is still above 6 after applying additional measures then pls send the RA to Office and get approval prior conducting the job
Reviewed In Office By Comments Date
This Risk assessment was prepared by Following Persons
Name Rank Sign
Reviewed By HOD :
Approved by Master :
Record of Periodic Review of this Risk Assessment (Prior conducting this operation or every 12 months whichever is lesser)
Date this RA was reviewed Reviewed By (Name & Sign) Master (Name & Sign) Comments
Incase after Review of this Risk Assessment it was decided to revise the Risk assessment then Pls complete below section
Date This RA is Closed out By Master Ref Number of new RA that replaces this RA
Note: 1. To be sent to company. 2. Retention period of this document on board and in office is 3 years. 3. Extend Space as required. 4. RA for Special, Critical Operations and Non-Routine operations as well as RA for any other Operation where the Risk factor can
not be reduced to 6 or below shall be sent to company for approval.
Union Marine Management Services Pte Ltd Shipboard Procedures Manual
TITLE: VER No – 03/ REV No -01 DATE – 15/10/2018
RISK ASSESSMENT AND HAZARD IDENTIFICATION TABLE SECTION : SPM – 14 PREPARED BY – DPA
SPMF 14‐01 APPROVED BY – MD
Vessel Ref Number COC‐6 Operation Prevention of Loss of containers at sea Date 15‐Oct‐18
Possible
Activity / Operation Consequence /
Analyze/review/Assess – Controls Required Extent of Consequences - Severity (S)
Hazard /
WHAT IF? Impact
1 2 3 4
Likelihood (L)
Negligible Marginal Critical Catastrophic
Prevention of Loss of containers Unsafe tier height considering As per owner's instructions for WNA routes /
3 at sea adverse weather
Tier Collapse 2 3 6 Winter / Hurricanes
1 3 3
Prevention of Loss of containers Tier Collapse, Container Damage in case Loading plan to be verified Cargo Securing
5 at sea
Stratification of tier weight
Top Heavy
2 3 6 Manual checked
1 3 3
Owner's instructions, segregation of defective
Prevention of Loss of containers
6 at sea
Defective lashing gear Tier Collapse, Container Damage 2 3 6 gear ,Cargo Securing Manual , Use good 1 3 3
Lashings
Prevention of Loss of containers Poor monitoring/ supervision of CS manual, Competent person Supervision &
8 at sea Lashing at Load port
Tier Collapse, Container Damage 2 3 6 monitoring
1 3 3
Residual Risk after applying existing Additional Control Measures if required for the Final Risk after applying Additional control
Activity to be Performed
Hazards associated with this control measures hazard (pls list measures
(Pls list all activities to be
Sr No. activity Severity all additional measures incase if the risk Factor is Severity
preformed while doing this Likelihood (L) Risk Factor Likelihood (L) Risk Factor (L
(Pls List all hazards ) (S) (1‐ above 6 even after applying existing control (S)
operation) (1‐5) (L x S) (1‐5) x S)
5) measures) (1‐5)
If Final Risk is still above 6 after applying additional measures then pls send the RA to Office and get approval prior conducting the job
Reviewed In Office By Comments Date
This Risk assessment was prepared by Following Persons
Name Rank Sign
Reviewed By HOD :
Approved by Master :
Record of Periodic Review of this Risk Assessment (Prior conducting this operation or every 12 months whichever is lesser)
Date this RA was reviewed Reviewed By (Name & Sign) Master (Name & Sign) Comments
Incase after Review of this Risk Assessment it was decided to revise the Risk assessment then Pls complete below section
Date This RA is Closed out By Master Ref Number of new RA that replaces this RA
Note: 1. To be sent to company. 2. Retention period of this document on board and in office is 3 years. 3. Extend Space as required. 4. RA for Special, Critical Operations and Non-Routine operations as well as RA for any other Operation where the Risk factor can
not be reduced to 6 or below shall be sent to company for approval.