Through this RFQ, ORCD invites qualified firms to submit quotations for construction of the
aforementioned project according to volume sheet and design provided as part of key project
documents.
Eligibility Criteria:
Construction work must be carried out in line with volume sheet (BOQ), 2D (floor plan) and
3D design according to the required quantities qualities prepared by ORCD;
Quality assurance of the construction work must be undertaken by an expert engineer of the
firm;
Construction work included but not limited to the following; well boring, construction of
water tank, installation of Solar Panels, installation of Solar Panel frame and etc. must be
completed within two and a half months from signing contract;
Payment terms:
Awarded construction company will be paid the total amount of contract value in one installment
through bank upon successful completion of the construction work according to volume sheet (BOQ)
and other engineering designs.
The oversight committee may accept or reject the quality of work in part or completely. As such, the
Construction Company must be willing to improve the quality of work of complete the incomplete
work as per the volume sheet after M&E report of the oversight committee.
Submission guideline:
Qualified and interested bidders should submit Quotations in sealed envelopes to the following
address:
ORCD Head Office Engineering Department House # 2584, Street of Shams London Academy Girls
School, Shaheed Square, Taimani Project Kabul, Afghanistan
Annexes:
Volume Sheet:
Bill of Quantity:
2D (floor design)