STANDARD PENETRATION TEST (SPT)

PROJECT : DED OF NEW ARCHIVE CENTER CENTRO NACIONAL CHEGA (CNC!I.P.) START OF PROJECT : JANUARY 2022
LOCATION : RUA DE BALIDE END OF PROJECT : APRIL 2022
DRILL HOLE NO. : 1 MADE BY :
ELEVATION : - CHECKED BY :
TOTAL OF BLOW SPT DIAGRAM
GROUND
WATER
DEPTH

LEVEL

TYPE OF SOIL DESCRIPTION N = N2 TOTAL OF BLOW PER 30 CM PENETRATION PHOTO


N1 N2 N3
+ N3 10 20 30 40 50 60
1
2 2 2 3 5
3
4 Soft silty sand, brown colored, high 2 2 5 7
5 Silt plasticity, sediment materials, very loose
6 soil density 4 1 1 2
7
8 2 2 2 4
9
10 6 10 10 20
11
12 5 7 7 14
13
Silty sand with gravel, grey black and
14 13 14 17 31
Silty Sand brown colored, low plasticity, medium
15
dense soil
16 11 13 18 31
17
18 8 10 12 22
19
20 19 21 26 47
21
Sandy silt, grey and brown colored, low
22 Sandy Silt 18 26 35 61
plasticity, very dense soil
23
24 21 30 31 61