INDIA CEMENT LIMITED,CECL 20 MW POWER PLANT

Wajvana,Distt.-Banswara(Raj.)
DEPARTMENT-INSTRUMENTATION
DOCUMENT NO.-ICL/CECL/INST/CL/CHP/ZSS
ISSUE : 01 DATE OF ISSUE : 01.07.2019
TITLE: MONTHLY CHECK LIST FOR ZSS
Equipment
Instrum Operation
Name Inst Tech Ele Tech operation Inst Section Ele Section
S.No. ent CHECKPOINT Field Feeder DCS Status Remarks manager
Name/sign Name/sign Sign sign sign
Name sign

CRU-1 (Coal
1 ZSS
Crusher)

CRU-2
2 ZSS 1.CLEANING OF INSTRUMENTS- ZSS AND SAFETY GUARD (Limestone
2.INSTRUMENTS MOUNTING AND TIGHTNESS Crusher)
3.CABLE LAYING, GLADING AND CONDUITING
4.CHECK TERMINATION AND CABLE LUG
5.CHECK INSTRUMENTS OPERATION(ZSS)
6.TARPAULIN COVERING
3 ZSS 7.JUNCTION BOX CLEANING MDCF-1

4 ZSS MDCF-2

COMMENTS