INDIA CEMENT LIMITED,CECL 20 MW POWER PLANT

Wajvana,Distt.-Banswara(Raj.)
DEPARTMENT-INSTRUMENTATION
DOCUMENT NO.-ICL/CECL/INST/CL/BC-1
ISSUE : 01 DATE OF ISSUE : 01.07.2019
TITLE: MONTHLY CHECK LIST FOR BELT CONVEYOR-1
Inst Ele
Instrument Equipment Inst Tech Ele Tech operation Operation
S.No. CHECKPOINT Field Feeder DCS Status Remarks Section Section
Name Name Name/sign Name/sign Sign manager sign
sign sign

1 PCS-1

2 PCS-2

3 PCS-3

1.CLEANING OF INSTRUMENTS-
4 PCS-4 PULLCORDS,ZSS AND SAFETY GUARD
2.INSTRUMENTS MOUNTING AND
TIGHTNESS
3.CABLE LAYING, GLADING AND CONDUITING
5 BSS-1
4.CHECK TERMINATION AND CABLE LUG BC-1
5.CHECK INSTRUMENTS
OPERATION(PCS/BSS/ZSS/PCS ROPE)
6 BSS-2 6.TARPAULIN COVERING
7.JUNCTION BOX CLEANING

7 BSS-3

8 BSS-4

9 ZSS