Doc No: MTPL/OM/PPM/CL-007

PPM Checklist For Issue Date: 11-10-2019


Tracker Rev no: 01
Rev Date: 01-04-2023

Prepared By Reviewed By Issued By


Site Incharge Cluster / Regional Manager Mr. Kamalesh Dube
Safety: Checks: Please tick in the box ()
Safety helmet Full Body Harness
Insulated Hand Gloves Work Permit no.
Arc Flash suit LOTO No
Safety Shoe Tool Box talk
Reflective jacket Others

Plant Name :
Equipment ID :
Equipment Name :
Frequency : Monthly/ Quarterly
Location :
Date :

Sr.No. Check point description Remark


1 Clean the MAST area clean & body properly.
2 Check MSAT Mount hardware tightness
3 Check all cable gland tightness and earthing connectivity
4 Check Till sensor cable and Earthing tightness properly
5 Check the SMPS Voltage and all input and output
connections necessary.
6 Check the PCB Board and all input and output 24V
connections necessary.
7 Check the communication status of Xbee MSAT with
NCU.
8 Check the SLEEVE DRIVE Connections properly
9 Check all type MC4 tightness properly
10 Check the MSAT Table Running status
11 Check the DB box connections and tightness properly
12 Check the NCU BOX mounting and all type hardware
tightness properly
13 Check Healthiness of MCB.
14 Tightness of all connections for controller box, Junction
Box, NCU & Wind Sensor.
15 Check healthiness of Antenna & Antenna Cable for MSAT
& NCU.
16 Check supply voltage of Wind Sensor AI Module.
17 Check Healthiness of SPD available inside MSAT and
NCU.
18 Check Power supply voltage of NCU.
19 Check the Antenna assembly, NCU assembly, Damper, U-
Bolt, Torque Tube, Mounting rails & other moving
structural parts.

Service Report

1
Doc No: MTPL/OM/PPM/CL-007
PPM Checklist For Issue Date: 11-10-2019
Tracker Rev no: 01
Rev Date: 01-04-2023

Spares Required/Replaced Quantity

PPM Carried Out by Verified by Site in charge / Engineer


Signature Signature