Doc No: MTPL/OM/PPM/CL-005

Issue Date: 11-10-2019


PPM Checklist Fencing Rev no: 01
Rev Date – 01-04-2023
Prepared By Reviewed By Issued By
Site Incharge Cluster / Regional Manager Mr. Kamalesh Dube

Safety checks: Please tick in the box ()

Safety helmet Full Body Harness (If applicable)


Insulated Hand Gloves Work Permit no.
Reflective jacket LOTO No (If applicable)
Safety Shoe Tool Box talk
Others
Plant Name :
Equipment ID :
Equipment Name :
Frequency : Monthly/ Quarterly
Location :
Date :

S.NO CHECK POINTS En# En# En#


Z1 Z2 Z1 Z2 Z1 Z2
1 Isolate from upstream
2 Check power in mains
3 Ups Power Up Condition
4 Check the enclosures
5 Any Alarms on the display
6 Rectify the alarms as per SOP
7 Check Hooter and Indication light
8 Any abnormal sound or smell.
9 Battery visual inspection.
10 Battery online voltage and current

1
Doc No: MTPL/OM/PPM/CL-005
Issue Date: 11-10-2019
PPM Checklist Fencing Rev no: 01
Rev Date – 01-04-2023

11 Battery offline voltage and current


12 Cleaning of the enclosure, blower and cloth
13 Check Earth cable Continuity
14 Disarm the Zone-1 and and 02
15 Correct if any damage observe
in fence and its accessories.
16 Charge both Zone and clear alarm if observed

17 Check the EF zone power feeding value


(should be greater than 4kv)
18 Check the communication device healthiness

19 check signal and data communication


20 Check the EF sys operation
21 Check all cable dressing
22 Check hole opening.
23 Power up the mains, and close the enclosure