TEST REPORT FOR

ISOLATOR & EARTH SWITCH


DOC. No. : VEPL/T&CF/IES/007 / Rev : 0
VOLTECH ENGINEERS PVT. LTD.
Excellent Electrical Service JOB REF NO : VEPL/TR/ /
DATE : Page No.
CLIENT : M/s.
PROJECT : Sheet No 1 of 6

1. Date of Erection : Date of Energization :

2. Equipment Details :

LOA No :
Make :
Type :
Sl. No. : R ph : Y ph : B ph :
Mfg Year :

3. Feeder Name :

4. Primary Voltage : Type Of Operating

5. Current Carrying Capacity : Mechanism Motor Operated :

6.1. Control Voltage :

6.2. General Checks :

1 Check the erection of equipment is carried out as per the approved drawings & the
earth switch is provided as per the SLD / Layout
2 The Isolator & Earth switch main contacts are aligned for simultaneous operation
of three poles & proper engagement during closing.
3 Check for free movement of arms of main contacts during closing & opening of
isolator & Earth Switch
4 Main contacts are cleaned and greased
5 Check earth connections from isolator structure to Earth mat
6 Check Earth switch is connected properly
7 Check the insulators are cleaned and free from dust/dirt etc.
8 Marshalling Box of Isolator & Earth Switch
a. Wiring is completed as per the drawing & terminals are tightened
b. All the fuses provided are of the rating as shown in drawing
c. The unused holes in the gland plate are sealed properly
d. The cable tags, ferrules for all cores are provided
e. Cables are properly dressed and clamped
9 Check the Clearance for the following :
a. Phase to Phase _______________
b. Phase to Earth ________________
10 Check the phase sequence of power supply of motor
11 Check the current drawn by motor is not more than the rated full load current & O/L
relay is set for full load current given on motor nameplate
13 All moving parts of drive mechanism are lubricated
14 Check for Changeover of Aux. Contacts during open & close operation

Test Performed by Witnessed by Witnessed by


Name : Name Name
Designation : Designation Designation
Signature & Signature & Signature &
Date Date Date
TEST REPORT FOR
ISOLATOR & EARTH SWITCH
DOC. No. : VEPL/T&CF/IES/007 / Rev : 0
VOLTECH ENGINEERS PVT. LTD.
Excellent Electrical Service JOB REF NO : VEPL/TR/ /
DATE : Page No.
CLIENT : M/s.
PROJECT : Sheet No 2 of 6

7. Motor Details :

ISOLATER EARTECH SWITECH


R - Phase Y-Phase B-Phase R-Phase Y-Phase B- Phase
Make
Sl No
Type
Volts
Amps
KW
Year of Manufacture
Over Load Setting
(Thermal Over Load)

8. Insulation Resistance Value Of Motor Winding:


(Using With 500v Megger Measure Resistance Between The Winding Of Motor And Earth)

Between R ph Y ph B ph
Winding to Earth

9. Operational Checks : (Using Equipment Details)

Make : Range : Sl. No. : Calib due Date :

9.1. Operate The Isolator And Record The Motor Current

Isolator Operating Time


Operation R phase Y phase B phase
Factory Site Factory Site Factory Site
Close
Open

9.2. Operation of Isolator from Local / Remote : (OK / Not OK)

Isolator Operation Control Panel


Local Remote
Close
Open

Test Performed by Witnessed by Witnessed by


Name : Name Name
Designation : Designation Designation
Signature & Signature & Signature &
Date Date Date
TEST REPORT FOR
ISOLATOR & EARTH SWITCH
DOC. No. : VEPL/T&CF/IES/007 / Rev : 0
VOLTECH ENGINEERS PVT. LTD.
Excellent Electrical Service JOB REF NO : VEPL/TR/ /
DATE : Page No.
CLIENT : M/s.
PROJECT : Sheet No 3 of 6

9.3. Measurement of Operating Time : (Using Equipment Details)

Make : Range : Sl. No. : Calib due Date :

Isolator Phase
Operation R ph Y ph B ph
Open
Close

9.4. Auxiliary Contacts Checks :

Isolator Auxiliary Operation Time


Operation Switch R phase Y phase B phase
NO NC NO NC NO NC
Close
Open

10. Insulation Resistance Test : (Using ___________Megger)

Make : Range : Sl. No. Clib due date :

10.1. Isolator Close Condition : (Values in G Ohms)

Between R ph Y ph B ph
Male Side to Ground
Female Side to Ground

10.2. Isolator Open Condition : (Values in G Ohms)

Between R ph Y ph B ph
Male Side to Ground
Female Side to Ground
Male Side to Female Side

11. Contact Resistance Measurement : (Using Equipments)

Make : Range : Sl. No. Clib due date :


11.1. Isolator Close Condition : (Values in Micro Ohms)

Across R ph Y ph B ph
Connector Male Side
Connector Female Side
Main Contact Male & Female
11.2. Isolator Open Condition & Ground Switch Close : (Values in Micro Ohms)
Test Performed by Witnessed by Witnessed by
Name : Name Name
Designation : Designation Designation
Signature & Signature & Signature &
Date Date Date
TEST REPORT FOR
ISOLATOR & EARTH SWITCH
DOC. No. : VEPL/T&CF/IES/007 / Rev : 0
VOLTECH ENGINEERS PVT. LTD.
Excellent Electrical Service JOB REF NO : VEPL/TR/ /
DATE : Page No.
CLIENT : M/s.
PROJECT : Sheet No 4 of 6

Across R ph Y ph B ph
Main Contact (Male & Female)
Ground Switch

12. Checking of Interlocks :

Typical __________ \ _______________ X _____________ \ _______________> Bus Side


Circuit 89A | 89AE 52 89BE | 89B
| . | .
------ ------

Interlock Condition Initiation Result Remarks


Object Equipment Location Close /
Open
Local / Local / Remote Isolator Local Close
Remote Switch in the Control 89A Control Open
Operation Box in Local Remote Close
89A Opened Control Open *
89B Opened (Control * (Close 89A Before
52 Open Panel) giving Open Command)
Local / Remote Isolator Remote Close
Switch in the Control 89A Control Open
Box in Remote Local Close
89A Opened Control Open *
89B Opened * (Close 89A Before
52 Open giving Open Command)
Local / Remote Isolator Local Close
Switch in the Control 89B Control Open
Box in Local Remote Close
89B Opened Control Open *
89A Opened * (Close 89B Before
52 Open giving Open Command)
89B Opened Isolator Local Open
89A Opened 89B
52 Open
Ground Local / Remote Ground Local Close
Switch Switch Position in Switch
Open
Operation Control Box in Local 89AE
89A Opened Ground Local Close
89B Opened Switch
52 Open Open
89BE

Test Performed by Witnessed by Witnessed by


Name : Name Name
Designation : Designation Designation
Signature & Signature & Signature &
Date Date Date
TEST REPORT FOR
ISOLATOR & EARTH SWITCH
DOC. No. : VEPL/T&CF/IES/007 / Rev : 0
VOLTECH ENGINEERS PVT. LTD.
Excellent Electrical Service JOB REF NO : VEPL/TR/ /
DATE : Page No.
CLIENT : M/s.
PROJECT : Sheet No 5 of 6

Interlock Condition Initiation Result Remarks


Object Equipment Location Close /
Open
Inter 89A Opened Ground Local Close
Locking 89B Closed Switch
Between 52 Open 89AE
Ground 89A Opened Ground Local Close
Switch 89B Opened Switch
And 52 Open 89BE
Isolator 89A Closed 89AE Local Close
89B NA
52 NA
89A NA 89BE Local Close
89B Closed
52 NA
Inter 89A Opened 89B Local Close
Locking 89AE Closed
Remote Close
Between 52 NA
Ground
Switch 89B Opened 89A Local Close
And 89BE Closed
52 NA Remote Close
Isolator
Inter 52 Closed 89A Local Close
Locking 89A Opened Remote Close
Between 89B Opened 89B Local Close
Breaker Remote Close
And 52 Opened 52 Local Close
Isolator 89A Closed
89B Opened Remote Close
52 Opened 52 Local Close
89A Closed
Remote Close
89B Opened
52 Closed 89A Local Open
89A Closed Remote Open
89B Opened 89B Local Open
Remote Open

Test Performed by Witnessed by Witnessed by


Name : Name Name
Designation : Designation Designation
Signature & Signature & Signature &
Date Date Date
TEST REPORT FOR
ISOLATOR & EARTH SWITCH
DOC. No. : VEPL/T&CF/IES/007 / Rev : 0
VOLTECH ENGINEERS PVT. LTD.
Excellent Electrical Service JOB REF NO : VEPL/TR/ /
DATE : Page No.
CLIENT : M/s.
PROJECT : Sheet No 6 of 6

Note : the following conditions to be checked :

a. Before Commissioning Tan Delta Test Link & switch Should be Earthed : 
b. CVT Secondary Spare Terminal Should be Earthed : 
c. CVT Secondary All Terminals Tightness Should be Checked : 

11. Remarks :

Test Performed by Witnessed by Witnessed by


Name : Name Name
Designation : Designation Designation
Signature & Signature & Signature &
Date Date Date