You are on page 1of 11

SHEET : 1 OF: 11

TEST REPORT FOR CURRENT TRANSFORMER PAGE :


Date : 15/01/2023
Client : M/s.ZF Wind Power Coimbatore Private Limited, Coimbatore.
Project: Maintenance Testing of CT, PT, Breaker & Relays.

1. Location : Ht Panel Room / 33 KV Switchboard

Feeder Name : Incomer From Switch Gear Room Outgoing Feeder -01 (CUEH 002)

Panel No : 01

2. Name Plate Details :

TESTED BY VEPL WITNESSED BY ZF


SHEET : 2 OF: 11
TEST REPORT FOR CURRENT TRANSFORMER PAGE :
Date : 15/01/2023
Client : M/s.ZF Wind Power Coimbatore Private Limited, Coimbatore.
Project: Maintenance Testing of CT, PT, Breaker & Relays.

Make Electrical Control & Systems


Type Wound
Sl.No. R: 08/021648 Y: 08/021652 B: 08/021647
Core Core 1 Core 2
Ratio 450/1A 450/1A
VA 15 15
Class 1.0 5P20
Insulation Class E
Hsv/IL 36/70/170KVp

TESTED BY VEPL WITNESSED BY ZF


SHEET : 3 OF: 11
TEST REPORT FOR CURRENT TRANSFORMER PAGE :
Date : 15/01/2023
Client : M/s.ZF Wind Power Coimbatore Private Limited, Coimbatore.
Project: Maintenance Testing of CT, PT, Breaker & Relays.

3. General Inspection & Polarity Checks : OK

4. Insulation Resistance test:

Measured Resistance Value in GΩ


Reference Applied voltage(V)
R Y B
Pri – Earth 5000 8.56 7.45 8.65
Pri – Core1 5000 15.36 14.2 14.6
Pri – core2 5000 15.81 15.6 11.8
Core1- Earth 500 >1 >1 >1
Core2- Earth 500 >1 >1 >1
TESTED BY VEPL WITNESSED BY ZF
SHEET : 4 OF: 11
TEST REPORT FOR CURRENT TRANSFORMER PAGE :
Date : 15/01/2023
Client : M/s.ZF Wind Power Coimbatore Private Limited, Coimbatore.
Project: Maintenance Testing of CT, PT, Breaker & Relays.

Core1-Core2 500 >1 >1 >1

5. Winding Resistance Measurement:

Measured Resistance Value in Ω


Reference
R Y B
Core 1 5.8 5.6 5.8
Core 2 6.5 6.1 6.8

TESTED BY VEPL WITNESSED BY ZF


SHEET : 5 OF: 11
TEST REPORT FOR CURRENT TRANSFORMER PAGE :
Date : 15/01/2023
Client : M/s.ZF Wind Power Coimbatore Private Limited, Coimbatore.
Project: Maintenance Testing of CT, PT, Breaker & Relays.

6. Ratio test:

TESTED BY VEPL WITNESSED BY ZF


SHEET : 6 OF: 11
TEST REPORT FOR CURRENT TRANSFORMER PAGE :
Date : 15/01/2023
Client : M/s.ZF Wind Power Coimbatore Private Limited, Coimbatore.
Project: Maintenance Testing of CT, PT, Breaker & Relays.

Injected Current in Measured Current in secondary (A)


Reference
Primary (A) R Y B
117.5 0.260 0.261 0.260
Core 1 225 0.515 0.521 0.522
(1s1-1s2) 337.5 0.751 0.751 0.753
450 1.04 0.999 1.04
112.5 0.261 0.262 0.261
Core 2 225.0 0.521 0.522 0.525
(2s1-2s2) 337.5 0.755 0.751 0.752
450 0.999 0.999 0.999

TESTED BY VEPL WITNESSED BY ZF


SHEET : 7 OF: 11
TEST REPORT FOR CURRENT TRANSFORMER PAGE :
Date : 15/01/2023
Client : M/s.ZF Wind Power Coimbatore Private Limited, Coimbatore.
Project: Maintenance Testing of CT, PT, Breaker & Relays.

7. Protection Checks through Primary Injection:

Reference Set Current Time & Curve


EF High Set 0.20 * In Instantaneous
EF Low Set 10% * In Normal Inverse (TMS:0.5)

Protection Circuit checks:


TESTED BY VEPL WITNESSED BY ZF
SHEET : 8 OF: 11
TEST REPORT FOR CURRENT TRANSFORMER PAGE :
Date : 15/01/2023
Client : M/s.ZF Wind Power Coimbatore Private Limited, Coimbatore.
Project: Maintenance Testing of CT, PT, Breaker & Relays.

Reference Set Current(A) Operated Current(A) Relay & Breaker Status


Relay Operated on E/F High Set &
R 0.20 0.201
Breaker Tripped
Relay Operated on E/F High Set &
Y 0.20 0.202
Breaker Tripped
Relay Operated on E/F High Set &
B 0.20 0.204
Breaker Tripped

TESTED BY VEPL WITNESSED BY ZF


SHEET : 9 OF: 11
TEST REPORT FOR CURRENT TRANSFORMER PAGE :
Date : 15/01/2023
Client : M/s.ZF Wind Power Coimbatore Private Limited, Coimbatore.
Project: Maintenance Testing of CT, PT, Breaker & Relays.

TESTED BY VEPL WITNESSED BY ZF


SHEET : 10 OF: 11
TEST REPORT FOR CURRENT TRANSFORMER PAGE :
Date : 15/01/2023
Client : M/s.ZF Wind Power Coimbatore Private Limited, Coimbatore.
Project: Maintenance Testing of CT, PT, Breaker & Relays.

8. Functional checks: (Whether Operational Checks OK / Not OK / Not Applicable)

1. CT secondary core should be shorted & Earthed OK


2. CT Secondary All terminals Tightness Should be checked OK
3. Protection and metering circuit checking OK

9. Comments : Nil.

10. Remarks : Current Transformer & Protection Circuit Found Healthy.

TESTED BY VEPL WITNESSED BY ZF


SHEET : 11 OF: 11
TEST REPORT FOR CURRENT TRANSFORMER PAGE :
Date : 15/01/2023
Client : M/s.ZF Wind Power Coimbatore Private Limited, Coimbatore.
Project: Maintenance Testing of CT, PT, Breaker & Relays.

TESTED BY VEPL WITNESSED BY ZF