Client Site Acceptance Test Report - Test Report Contractor:

Contract No: 5002

Project: Layyah Combined Cycle Power


Plant

Contractor: Sub Station: 6.6 kV GT MV SWITCHGEAR Manufacture:


Equipment: CURRENT TRANSFORMER
Panel Type 6.6 kV SWGR PANEL UNIGEAR ZS1
Bay Ref: 10BBA09-EDG LV TR.1
Date: 23/06/2021 Page 1 of 3

CURRENT TRANSFORMER TEST REPORT


1. CHARACTERISTICS.
V

B
1
1
k

u
s

P
1

1 2 
 2
1  S
 1  2 S S S
S S 12
12 12 12
12 12
B
CORE 1 2
C
MAKE ABB
T
TYPE TPU 40.23
0 RΦ 1VLT5120060688
4Sr.No. YΦ 1VLT5120060686
L BΦ 1VLT5120060695
1 Pri. 400 A 400 A
RATIO
Sec. 1A 1A
CLASS 5P20 0.2FS5
Vk (V) - ..
Io mA) ≤ 0.016 A ≤ 0.01 A
R ct (Ohms) ≤ 7.7 Ω ≤ 4.3 Ω
Burden (VA) 20 5
RΦ 1S1 – 1S2 2S1 – 2S2
CT TB
YΦ 1S1 – 1S2 2S1 – 2S2
No.
BΦ 1S1 – 1S2 2S1 – 2S2
FUNCTION PROTECTION METERING

P 2. GENERAL CHECKS.
2
DESCRIPTION R Phase Y Phase B Phase

VISUAL INSPECTION OK OK OK
NAME PLATE OK OK OK
TIGHTNESS CHECK AT CT SEC. TB – LV Compartment OK OK OK

POSTION OF P1 - TOWARDS BUS/FEEDER BUS BUS BUS

STAR FORMATION - S1/S2 S1 S1 S1


B
EARTHING OF STAR FORMATION OK OK OK
C
T
0 MAIN
TESTED BY WITNESSED BY APPROVED BY
CONTRACTOR
5
SIGNATURE
L
2 ALA
NAME: R.VENKATESH AHMED BASIONY
VENKATESWARLU
DATE: 23/06/2021 23/06/2021 23/06/2021
COMPANY ABB ELSEWEDY POWER ILF SEWA
Client Site Acceptance Test Report - Test Report Contractor:
Contract No: 5002

Project: Layyah Combined Cycle Power


Plant

Contractor:
B Sub Station: 6.6 kV GT MV SWITCHGEAR Manufacture:
C Equipment: CURRENT TRANSFORMER
T Panel Type 6.6 kV SWGR PANEL UNIGEAR ZS1
0 Bay Ref: 10BBA09-EDG LV TR.1
6 Date: 23/06/2021 Page 2 of 3
L
3 3. INSULATION RESISTANCE MEASUREMENT.
IR Values shall be measured up CT terminal blocks. (1min Value) Amb.Temp(t0C): 23.4 0C
Description DC V applied R Phase Y Phase B Phase
Primary to Earth 5000V 410.00 GΩ 457.00 GΩ 491.00 GΩ
Primary to Core-1 2500V 689.00 GΩ 1.32 TΩ 416.00 GΩ
Primary to Core-2 2500V 688.00 GΩ 805.00 GΩ 701.00 GΩ
Core-1 to Earth 500V 17.81 GΩ 15.34 GΩ 11.52 GΩ
Core-2 to Earth 500V 18.00 GΩ 15.56 GΩ 16.08 GΩ
Core-1 to Core-2 500V 29.08 GΩ 26.06 GΩ 29.01 SGΩ

4. POLARITY CHECKS.
PHASE R PHASE Y PHASE B PHASE

CT Terminals At CT Terminal Blocks At CT Terminal Blocks At CT Terminal Blocks

1S1-1S2
CT ANALYZER TEST REPORT ATTACHED
2S1-2S2

5. WINDING RESISTANCE MEASUREMENT. (Values in Ω) Amb.Temp(t0C): 23.4 0C


R Phase Y Phase B Phase
Terminal
CT TERMINALS R at t0 C R at 750 C R at t0 C R at 750 C R at t0 C R at 750 C
Block
1S1-1S2
CT ANALYZER TEST REPORT ATTACHED
2S1-2S2

Resistance at 750 C = R t (1 + 0.00393(75 – t))


Acceptance Criteria: Shall be compared with FAT results and Name plate data.

MAIN
TESTED BY WITNESSED BY APPROVED BY
CONTRACTOR
SIGNATURE
ALA
NAME: R.VENKATESH AHMED BASIONY
VENKATESWARLU
DATE: 23/06/2021 23/06/2021 23/06/2021
COMPANY ABB ELSEWEDY POWER ILF SEWA
Client Site Acceptance Test Report - Test Report Contractor:
Contract No: 5002

Project: Layyah Combined Cycle Power


Plant

Contractor: Sub Station: 6.6 kV GT MV SWITCHGEAR Manufacture:


Equipment: CURRENT TRANSFORMER
Panel Type 6.6 kV SWGR PANEL UNIGEAR ZS1
Bay Ref: 10BBA09-EDG LV TR.1
Date: 23/06/2021 Page 3 of 3

6. MAGNETIZING CURVES FOR Vk.

R PHASE Y PHASE B PHASE


Voltag
CORE RATIO TERMINAL Voltage(V Current Voltage(V Current
e Current(mA)
) (mA) ) (mA)
(V)
400/1A 1S1-1S2
1
CT ANALYZER TEST REPORT ATTACHED
2 400/1A 2S1-2S2
Acceptance Criteria: Shall be compared with FAT results and Name plate data.

7. RATIO TEST:
R Phase Y Phase B Phase

Sec- Pri- Sec- Pri- Sec-


CORE Ratio Pri-Amps Amps Amps Amps Amps Amps
% % %
Measured Measure Measure Measure Measure Measure
Error Error Error
(A) d d d d d
(mA) (A) (mA) (A) (mA)

1S1-1S2 400/1A
CT ANALYZER TEST REPORT ATTACHED
2S1-2S2 400/1A

Acceptance Criteria: Shall be compared with FAT results and Name plate data.

8. INSTRUMENTS DETAILS:
INSTRUMENT Make/Model Sr. No. Cal. Due Date
OMICRON/CT
CT Analyzer RH090Q 02/11/2021
ANALYZER
IR Tester MEGGER/MIT1025 102059599 02/04/2022

MAIN
TESTED BY WITNESSED BY APPROVED BY
CONTRACTOR
SIGNATURE
ALA
NAME: R.VENKATESH AHMED BASIONY
VENKATESWARLU
DATE: 23/06/2021 23/06/2021 23/06/2021
COMPANY ABB ELSEWEDY POWER ILF SEWA