: GAC-12-VX-RMH-LAH-003
Attachment 1
Pre-commissioning check: 6.3kV Switchgear Busbar
Switchgear/Item No.
System / Equipment
CHECKED
ACTIVITIES REMARKS
OK
Calik / LII
TESTING AND COMMISSIONING Doc. No. : GAC-12-VX-RMH-LAH-003
Attachment 2
Pre Commissioning Tests: Insulation Resistance (IR) Test of 6.3kV Switchgear Bus Bar
Switchgear/Item No.
System / Equipment
This test is to measure insulation resistance of entire switchgear including bus bars, circuit breakers, CT etc of all
panels.
During test check and confirm the following conditions:
a) All Circuit breakers are in service position and closed.
b) All CT’s are connected properly.
c) All VT’s disconnected from the circuit.
d) All Lightning Arrestors disconnected from the circuit.
e) All Power cables are disconnected.
f) The frames and secondary windings of all CT’s are earthed.
g) All bus bars, insulators, circuit breakers CTs etc are clean and free from visual damage.
Test Procedure:
The leads on the IR tester to be connected to the conductive parts of the phases under test. For example, the IR
test would be done between one phase to earth while other two phases connected earth.
IR test to be done for one (1) minute before and after High Voltage test and results to be recorded.
When the IR test is completed for any one phase, discharge the static charge of that phase by static discharge
stick or by IR tester with automatic discharging capabilities.
Connection Diagram for Insulation Resistance Test of 6.3kV Switchgear Bus Bar
TESTING AND COMMISSIONING Doc. No. : GAC-12-VX-RMH-LAH-003
Test Result:
Insulation Resistance (1 min.)
Phase Test Voltage
Other Phases Remarks
Under Test (kV) Before HV Test After HV test
(MΩ) (MΩ)
L1 to Earth L2 & L3 connected to earth
Calik / LII
Attachment 3
TESTING AND COMMISSIONING Doc. No. : GAC-12-VX-RMH-LAH-003
System / Equipment
This test is to measure insulation resistance of bus VT between primary and secondary windings and also
between secondary windings.
B. Ratio Test
TESTING AND COMMISSIONING Doc. No. : GAC-12-VX-RMH-LAH-003
Ratio shall be checked by applying a three phase 380V supply on the Primary side and measuring voltage on the
secondary side.
Test Result:
Voltage ratio
Calik / LII
Attachment 4
Pre Commissioning Tests: Voltage Transformer of Bus Section 2
TESTING AND COMMISSIONING Doc. No. : GAC-12-VX-RMH-LAH-003
Switchgear/Item No.
System / Equipment
This test is to measure insulation resistance of bus VT between primary and secondary and also between
secondary windings.
B. Ratio Test
Ratio shall be checked by applying a three phase 380V supply on the Primary side and measuring voltage on the
TESTING AND COMMISSIONING Doc. No. : GAC-12-VX-RMH-LAH-003
secondary side.
Test Result:
Voltage ratio
Calik / LII
Attachment 5
Commissioning Checks: 6.3kV Switchgear Busbar
TESTING AND COMMISSIONING Doc. No. : GAC-12-VX-RMH-LAH-003
System / Equipment
CHECKED
ACTIVITIES REMARKS
OK
L3-L1
L1-L2 L2-L3
Date Time Incoming Voltage (kV) Bus 1 Voltage (kV) Bus 2 Voltage (kV)
R
TESTING AND COMMISSIONING Doc. No. : GAC-12-VX-RMH-LAH-003
ma
rks
e
19. After stable operation without any abnormality
during the above period, the switchgear is
considered to be ready for supply loads by switching
ON outgoing feeder.