You are on page 1of 1

0 1 2 3 4 5 6 7 8 9

gas
HVAC 2 BR-5 BR-4 BR-3 BR-2 BR-1
control unit
PCS 2 FAN 1-2-3

OIL IMMERSED
TRANSFORMER

QAX1
PCS 1
UPS
HVAC 1 BR-5 BR-4 BR-3 BR-2 BR-1

gas
HVAC 2 BR-5 BR-4 BR-3 BR-2 BR-1
control unit
PCS 2 FAN 1-2-3

OIL IMMERSED
TRANSFORMER

QAX1
PCS 1
UPS
HVAC 1 BR-5 BR-4 BR-3 BR-2 BR-1

TRACTEBEL ENGINEERING PVT. LTD.


CONSULTING ENGINEERS,GURGAON, INDIA

APPROVAL STATUS:

A - APPROVED
B - APPROVED WITH COMMENTS
C - NOT APPROVED
D - RECEIVED FOR INFORMATION/REFERENCE
THIS APPROVAL STATUS SHALL NOT RELEIVE THE CONTRACTOR FROM HIS CONTRACTUAL
OBLIGATIONS.

DEPARTMENT: DATE:
RENEWABLE 13.09.2019

gas
HVAC 2 BR-5 BR-4 BR-3 BR-2 BR-1
control unit
PCS 2 FAN 1-2-3

OIL IMMERSED
TRANSFORMER
QAX1

PCS 1
UPS
HVAC 1 BR-5 BR-4 BR-3 BR-2 BR-1

* MINUMUN DISTANCE BETWEEN CONTAINERS


** ACCORDING TO APPLICABLE STANDARD
1 11/07/2019 MC Date 12/03/2019
Sol de Insurgentes ESS plant layout =
W1060 W1060_351_TD_CVL &ECB
Edited Alessio Gilardoni +
Checked Andrea Della Vedova Mexico Page 1
ENGIE Solar
Rev. Revision Date Elaborated Approved Marco Todeschini Sheet 1/1

You might also like