Interconnection Authority
GCCIA
Engineer
REVISION
SUMMARY
PAGES 0 1
1 PURPOSE OF TESTS 2 X
2 SCOPE 2 X
3 TEST EQUIPMENT 2 X
4 PRE-REQUISTES 2 X
5 PROCEDURES 3 X
6 RECORD TEST SHEET 5 X
6.1 DIFFERENTIAL PROTECTION END TO END TESTS 5 X
6.2 DISTANCE PROTECTION END TO END TESTS 8 X
Name Name
Date Date
Doc. No. REV-0 Page 1 of 10
Gulf Cooperation Council
Interconnection Authority
GCCIA
Engineer
1 PURPOSE OF TESTS
The purpose of the tests is to check the correct transmission signal information send and receive by the
Relays from optic fibers teleprotection and PLC.
All intertrip logic should be tested.
These tests are performed without load on the line. Tests with line charged are covered by energisation
procedure.
2 SCOPE
LOCAL END REMOTE END
Substation Name :- DOHA SOUTH (DSS) Substation Name :- SALWA SS
Diameter: Q01 Diameter: Q01
Line : L8 TO SALWA Bay : L8 TO DSS
Panel Number : 1RB1,1RA1 Panel Number : 1RB1,1RA1
Relays
Relay Denomination
Denomination in 87LB/21A 87LB/21A
in Scheme
Scheme
Scheme to be
END- TO END TEST.
Checked
Name Name
Date Date
Doc. No. REV-0 Page 2 of 10
Gulf Cooperation Council
Interconnection Authority
GCCIA
Engineer
4. PRE - REQUISITES
PRE-REQUISITES REMARKS
All Safety Condition Are Ok
All Competent Personnel Available For The Test
Ac & Dc Supply Availability And Security
PPE Safety Available.
All Other Relevant Safety Instructions Been Followed
Coordination With Other Parties ( GIS, Transformer, Etc..)
5. TEST PROCEDURES
The following procedures are written for demonstrating the main End to end test to be done for the
Differential Protection and Distance protection for OHL.
All Trip Relays should be reset before the tests.
To perform this test the Differential relay should be set on Test loop back mode – Disabled in
Commission Tests Setting. In order to test the actual communication channels.
These tests can be performed without CB breaker operation, by disconnecting the trip orders at Master
trip side.
Name Name
Date Date
Doc. No. REV-0 Page 3 of 10
Gulf Cooperation Council
Interconnection Authority
GCCIA
Engineer
5-Repeat the same test but the injection from remote end.
Name Name
Date Date
Doc. No. REV-0 Page 4 of 10
Gulf Cooperation Council
Interconnection Authority
GCCIA
Engineer
Name Name
Date Date
Doc. No. REV-0 Page 5 of 10
Gulf Cooperation Council
Interconnection Authority
GCCIA
Engineer
Name Name
Date Date
Doc. No. REV-0 Page 6 of 10
Gulf Cooperation Council
Interconnection Authority
GCCIA
Engineer
Name Name
Date Date
Doc. No. REV-0 Page 7 of 10
Gulf Cooperation Council
Interconnection Authority
GCCIA
Engineer
4- Both CH1 & CH2 out of service: Injected current 0,5A in R phase
Injected from Injected from
DSS SALWA results
Remote end Local Remote end Local
No Trip No Trip No Trip No Trip
Name Name
Date Date
Doc. No. REV-0 Page 8 of 10
Gulf Cooperation Council
Interconnection Authority
GCCIA
Engineer
Name Name
Date Date
Doc. No. REV-0 Page 9 of 10
Gulf Cooperation Council
Interconnection Authority
GCCIA
Engineer
1 All test equipment, leads, shorts and test block removed safely?
2 Disturbed customer wiring re-checked?
3 All commissioning tests disabled?
4 Circuit breaker operations counter reset?
5 Current counters reset?
6 Event records reset?
7 Fault records reset?
8 Disturbance records reset?
9 Alarms reset?
10 LEDs reset?
REMARKS
………………………………………………………………………………………………………………
………………………………………………………………………………………………………………
………………………………………………………………………………………………………………
………………………………………………………………………………………………………………
END OF REPORT
Name Name
Date Date
Doc. No. REV-0 Page 10 of 10