Procedure for Machine Safeguarding

A-2.2/11-11-1-– MONITORING CHECKLIST FOR ELECTRICAL WORKS

Health Safety & Environment Management

MONITORING CHECKLIST FOR ELECTRICAL WORKS

HSE Manual Ref. No. : HSEM GF07032


Site/Office :
Frequency : Fortnightly
Sub Contractor Details (If any) :
Date :

S. No Description Yes No N/A

Are all switchgear, distribution panels and boards that are energized are guarded and
1
provided with a ‘danger’ sign and ‘No Entry’ board?

Are lock / tags available/used on circuits that could become energized while being
2
worked?
3 Are all temporary circuits properly guarded and grounded?

4 Are extension cords in continuous lengths without splice?

5 Whether the condition of cable is checked?


Are cables received from other site checked for insulation resistance before putting
6
them into use?
7 Are all main cables taken overhead?

8 Are welding cables routed properly above the ground?

9 Are welding and electrical cables overlapping?

10 Is any improper jointing of cables/wires prevailing at site?

11 If temporary lighting is provided, are bulbs protected against accidental breakage?

12 Are working surfaces clear of cords so as not to create a tripping hazard?

13 Is there a sufficient number of temporary plug points on the job site?

Are Earth Leakage Circuit Breakers (ELCB) or Residual Current Circuit Breaker
14 (RCCB) of cutoff rating 30 mA installed in each circuit and are they used and tested
by PMV Representative at regular intervals with a record?

Other Observations

Signature of the PMV In charge: _____________________________


Signature of the HSE Officer: _____________________________

Shapoorji Pallonji & Co. Ltd. Page 1 of 1