ELECTRICAL SAFETY JOINT INSPECTION CHECKLIST

Name of the Plant : Date & Time of inspection :

Month :
Location of the Plant :

Sl. No. Points YES/NO Remarks

CABLES
1 Whether the condition of Cable is checked?

2 Are flexible cords and cables free of splices or


taps?
3 Is exposed wiring and cords with frayed or
deteriorated insulation repaired or replaced
promptly?
4 Are all main Cables, taken either underground /
Overhead/Side walls?
5 Are electrical Cables routed properly above the
over head
6 Are welding & Electrical Cables overlapping?
7 Is any improper jointing of Cables wires
prevailing at plant?
8 Are clamps or other securing means provided on
flexible cords or cables at plugs, receptacles,
tools, equipment, etc., and is the cord jacket
securely held in place?

DBs / SDBs
1 Is earth conductor continued upto DB / SDB?

2 Is sufficient access and working space provided


and maintained around all electrical equipment
to permit ready and safe operations and
maintenance?
3 Is there any overloading of DBs / SDBs?

4 Are correct / proper fuses & CB’s provided at


main boards & sub- boards?
5 Is energised wiring in junction boxes, CB panels &
similar places covered all times?
6 Whether all DBs are with doors, lock & key
Page 1 of 3
Rev.01, Eff.Date:04/11/2015 Doc.No: PLL/ESC/01

Rev.01, Eff.Date: 02/03/2017


Sl. No. Points YES/NO Remarks
7 Whether all DBs kept on rubber mats

8 Whether all the DBs kept on dry and clean floor

9 Are all energized parts of electrical circuits and


equipment guarded against accidental contact by
approved cabinets or enclosures?
10 Clear access and aggress available for all DBs.

11 Weather the location of DBs properly Identified

12 Weather all details of DB is available

13 Are electrical enclosures such as switches,


receptacles, junction boxes, etc., provided with
tight-fitting covers or plates?

RCBO / RCCB
1 Whether the connections are routed through
RCBO / RCCB?
2 Is RCBO/RCCB sensitivity maintained at 30 mA?

EARTHING
3 Is neutral earthing ensured at the source of
power (Main DB at Gen. or Transformer)?
4 Whether the continuity & tightness of earth
conductor are checked?
5 Mention the copper/Aluminium strip of earth
conductor used at plant.
6 Proper Earth pit provided & checking.

ELECTRICALLY OPERATED MACHINES /


ACCESSORIES
1 Whether the plug top provided everywhere?
2 Are all metal parts of electrical equipment’s &
light fittings / accessories grounded?
3 Is there any shed / cover for welding machines?
4 Is Double Earthing for Welding Machines?

5 Are Portable power tools maintained as per


norms?
6 Any other Information / observations

Page 2 of 3
Rev.01, Eff.Date:04/11/2015 Doc.No: PLL/ESC/01

Rev.01, Eff.Date: 02/03/2017


Sl. No. Points YES/NO Remarks
7 Is there Fire points, fire extinguishers and fire
buckets?
8 Is low voltage protection provided in the control
device of motor driven machines or equipment,
which could cause injury from Accidental
starting?
9 Is each motor disconnecting switch or circuit
breaker located within sight of the motor control
device?
10 Are employees prohibited from working alone on
energized lines or equipment over 600 volts?
11 Are portable electrical tools and equipment
grounded or of the double insulated type?

Note:-Documented by Electrical Department

Inspected By

Checked By
(Maintenance manager)

Verified By
(Safety Officer)