No: PLL/ESC/01
Month :
Location of the Plant :
CABLES
1 Whether the condition of Cable is checked?
DBs / SDBs
1 Is earth conductor continued upto DB / SDB?
RCBO / RCCB
1 Whether the connections are routed through
RCBO / RCCB?
2 Is RCBO/RCCB sensitivity maintained at 30 mA?
EARTHING
3 Is neutral earthing ensured at the source of
power (Main DB at Gen. or Transformer)?
4 Whether the continuity & tightness of earth
conductor are checked?
5 Mention the copper/Aluminium strip of earth
conductor used at plant.
6 Proper Earth pit provided & checking.
Page 2 of 3
Rev.01, Eff.Date:04/11/2015 Doc.No: PLL/ESC/01
Inspected By
Checked By
(Maintenance manager)
Verified By
(Safety Officer)