BURNER AREA INSTRUMENTS
Instrument Description INSPECTION POINTS
Termination
TAG NO. IGNITOR Equipment Status Cleaning Proper mounting Enclosure Ignitor Trial Checked by REMARKS
Tightness

IGN-1 BURNER-1

IGN-2 BURNER-2

Cleaning & Power Supply


TAG NO. FLAME SCANNER Equipment Status Proper mounting Error Status DCS Value Checked by REMARKS
Covering Status

NI90001A BURNER-1 FLAME

NI90001B BURNER-2 FLAME

Cleaning & Working


TAG NO. SOV Equipment Status Proper mounting Servicing Field/ DCS Status Checked By REMARKS
Covering Status

SOV9003A BURNER-1 IGN ADV SOV

SOV9003B BURNER-2 IGN ADV SOV

Cleaning & Termination


TAG NO. ON/OFF Actuator Equipment Status Proper mounting Air Leakage Air Pressure Field Status Feedback as per command Checked by REMARKS
Covering Tightness

SOV82001A BURNER-1 ATOM V/V

SOV82002A BURNER-1 SCAV V/V

SOV9002A BURNER-1 OIL TRIP V/V

SOV82001B BURNER-2 ATOM V/V

SOV82002B BURNER-2 SCAV V/V

SOV9002B BURNER-2 OIL TRIP V/V

SOV9001 LOTV
Cleaning & Air Supply Calibration (if Checked
TAG NO. CONTROL VALVE Equipment Status Field opening Air Leakage Control Air pressure DCS Command DCS Feedback REMARKS
Covering Pressure required) by

FCV9001 LDO PRESSURE CV

Cleaning &
TAG NO. PRESSURE GAUGES Equipment Status Proper mounting Glass status Needle Status Leakage Field Value Calibration (if required) Checked By REMARKS
Covering

BURNER-1 ATOM AIR PG

BURNER-1 SCAV PG

BURNER-1 OIL PG

BURNER-2 ATOM AIR PG

BURNER-2 SCAV PG

BURNER-2 OIL PG

Cleaning & Termination Checked from HART (if


TAG NO. Pressure Tx Equipment Status Proper mounting Display Status Leakage Field / DCS Value Checked By REMARKS
Covering tightness required)

PIC9002 LDO PRESSURE