You are on page 1of 3

Rev 1 13-Nov-17

ENPPI INSPECTION AND TEST PLAN JGC/DEC ITP No. APPROVED DATE DISCIPLINE:

Analyzers, Analyzer Shelters and Racks Material Receiving, Installation and


ENPPI-ITP-001 Instrumentation
Pre commissioning
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR / SUBCONTRACTOR

ENPPI

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY ASSIGNMENTS
TASK / ACTIVITY QUALITY RECORD REMARKS
NO. & ACTIVITY CODE PROCEDURE SAUDI
CNTRCTR
ARAMCO

1.00 DOCUMENT REVIEW


All areas under BI-10-01759 are Unclassified non-
See See
1.01 IS System Notification N/A N/A hazardous area as per the Electrical Area
Remarks Remarks
Classification
All areas under BI-10-01759 are Unclassified non-
See See hazardous area as per the Electrical Area
IS System N/A N/A
1.02 Remarks Remarks
Design / Procurement Package Classification

RECEIVING
2.00
INSPECTION
Handling, Storage and Preservation General - Electrical Equipment, Storage, handling and
2.01
Visual Inspection
SAIC-P-3002 SAIC-P-3002 I S Preservation

Analyzers, Analyzer Shelters and


SAPID to be notified on initial delivery of each listed item
2.02 Racks Material Receiving Visual ENPPI-IC-001 ENPPI-IC-001 H W (by type or manufacturer).
Inspection

General Piping and Tubing System -


Materials Receiving for Stainless Steel
2.03
tubing for process(Including Electric /
SAIC-J-6002 SAIC-J-6002 H W See also SATIP-J-003-01 Instrument Tubing and Piping
Steam Traced Bundle)

Compression Fittings
and Accessories
Copper/Brass/ Stainless steel
2.04
Tubing Accessories
SAIC-J-6005 SAIC-J-6005 H W See also SATIP-J-003-01 Instrument Tubing and Piping
Material Receiving
Visual Inspection

Supplemental Supports
See See SATIP-J-902-06 Inst. Racks, Boxes and Cabinets
2.05 Material Receiving
Remarks Remarks
Visual Inspection

Page 1 of
Rev 1 13-Nov-17

ENPPI INSPECTION AND TEST PLAN JGC/DEC ITP No. APPROVED DATE DISCIPLINE:

Analyzers, Analyzer Shelters and Racks Material Receiving, Installation and


ENPPI-ITP-001 Instrumentation
Pre commissioning
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR / SUBCONTRACTOR

ENPPI

INSPECTION
ITEM PROJECT QUALITY RESPONSIBILITY
TASK / ACTIVITY QUALITY RECORD ASSIGNMENTS REMARKS
NO. PHASE & PROCEDURE
ACTIVITY CNTRCTR
SAUDI
ARAMC
CODE
O

3.00 INSTALLATION

Grounding System Installation Visual See Remarks See


3.01 SATIP-P-111-01 Grounding and Bonding
Inspection Remarks

Supplemental Support / Enclosure


See Remarks See SATIP-J-902-06 Inst. Racks, Boxes and Cabinets SATIP-
3.02 Installation
Remarks M-001-01
Visual Inspection

See also
Analyzers, Analyzer Shelters and Installation, Operation and Maintenance Manual (Vendor
3.03
Racks Installation Visual Inspection
ENPPI-IC-002 ENPPI-IC-002 H W Document No.IM12B6J1-40E-E/IM 12A01A02-12E/IM
12F5A2-01E)

See also
Cable Tray and Conduit See Remarks See SATIP-P-104-03 Cable Tray Fittings and Accessories
3.04 SATIP-P-104-05 Above-grade, conduit, fittings and
Installations Remarks
Accessories

SATIP-P-104-01 Low Voltage (up to 1 kV) Power Cable


and Building Wire
Cable Installation See Remarks See
3.05
Visual Inspection Remarks
H W SATIP-902-01 Metallic Instrumentation and Control Cable
SA PID shall be notified on start of installation for each
intrinsically safe circuit.

Instrument Cable - Continuity, Insulation


Resistance (Installed), and Termination SA PID shall be notified on testing of first ten circuits of
Torque Testing SATR-J-6602 SATR-J-6602 each signal service level.
3.06
Cable Continuity (Volt-Ohm Meter) H W SA PID shall be notified on start of this activity for each
and Insulation (Megger) Testing(Installed process system and plant area.
Cable)
Instrument Cable -
Installation, Termination, SA PID shall be notified on testing of first ten circuits of
Identification each signal service level.
3.07 and Pre-Commissioning SAIC-J-6606 SAIC-J- SA PID shall be notified on start of this activity for each
Cable Termination 6606 H W process system and plant area.
Crimp (wire pull-out) and
Torque Testing

3.08 Tubing and Accessories Installation SAIC-J-6607 SAIC-J-6607 H W See also SATIP-J-003-01 Instrument Tubing and Piping
Visual Inspection

Page 2 of