SAUDI ARAMCO ID/PID FORM REV 1 - 010109 (Standards Cutoff-Mar 2013) Rev 7 31-Mar-13

SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:

Grounding and Bonding SATIP- P-111- 01 30-Apr-13 Electrical


PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM QUALITY QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

1.0 DOCUMENT REVIEW

Soil Resistivity Test Report Test and report in accordance with IEEE 81 or Geonics
1.1
(Jobsite Final)
SATR-P-3701 SATR-P-3701 RH R techniques.

RECEIVING
2.0
INSPECTION

Storage, Handling, and Preservation


2.1 Visual Inspection for General Electrical SAIC-P-3002 SAIC-P-3002 W S Weekly Inspection by Contractor QC
Equipment

Storage, Handling, and Preservation


2.2
Visual Inspection for Cable
SAIC-P-3201 SAIC-P-3201 W S Weekly Inspection by Contractor QC

Manufactured Electrodes
2.3 Material Receiving SAIC-P-3701 SAIC-P-3701 H W
Visual Inspection for Ground Rods

Manufactured Electrodes
Material Receiving
2.4
Visual Inspection for Zinc and Magnesium
SAIC-P-3704 SAIC-P-3704 H W
Anode Electrodes

Grounding Cable
2.5 Material Receiving SAIC-P-3705 SAIC-P-3705 H W Bare, Tinned and Insulated Copper Cable
Visual Inspection

Accessories See GENERAL NOTES for typical accessories.


Material Receiving
2.6
Visual Inspection for Exothermic Welding
SAIC-P-3018 SAIC-P-3018 H W Notify SA by RFI on receipt of each listed accessory (by
Materials, Molds, & Tools type or manufacturer).

Accessories See GENERAL NOTES for typical accessories.


Material Receiving
2.7
Visual Inspection for Hydraulic
SAIC-P-3708 SAIC-P-3708 H W Notify SA by RFI on receipt of each listed accessory (by
Compression Fittings / Tools type or manufacturer).

Page 1 of 12
SAUDI ARAMCO ID/PID FORM REV 1 - 010109 (Standards Cutoff-Mar 2013) Rev 7 31-Mar-13

SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:

Grounding and Bonding SATIP- P-111- 01 30-Apr-13 Electrical


PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM QUALITY QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

Accessories See GENERAL NOTES for typical accessories.


Material Receiving
2.8
Visual Inspection for Grounding and
SAIC-P-3709 SAIC-P-3709 H W Notify SA by RFI on receipt of each listed accessory (by
Bonding Accessories type or manufacturer).

Neutral Ground Resistor


2.9 Material Receiving SAIC-P-3710 SAIC-P-3710 H W
Visual Inspection

3.0 INSTALLATION

Ground Electrode System


Manufactured Electrode
3.1
Installation Visual Inspection for Ground
SAIC-P-3711 SAIC-P-3711 H W
Rods

Ground Electrode System


Manufactured Electrode
3.2
Installation Visual Inspection for Zinc and
SAIC-P-3712 SAIC-P-3712 H W
Magnesium Anode Electrodes

Ground Electrode System


Fabricated / Supplemental
3.3 Electrode Installation SAIC-P-3713 SAIC-P-3713 H W
Visual Inspection for Exothermic
(Thermite) Welding

Ground Electrode System


Fabricated / Supplemental
3.4 Electrode Installation SAIC-P-3714 SAIC-P-3714 H W
Visual Inspection for Hydraulic
Compression Connectors

Ground Electrode System


Fabricated / Supplemental
3.5 Electrode Installation SAIC-P-3715 SAIC-P-3715 H W
Visual Inspection for Concrete Embedded
Copper

Page 2 of 12
SAUDI ARAMCO ID/PID FORM REV 1 - 010109 (Standards Cutoff-Mar 2013) Rev 7 31-Mar-13

SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:

Grounding and Bonding SATIP- P-111- 01 30-Apr-13 Electrical


PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM QUALITY QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

Ground Electrode System


Fabricated / Supplemental
3.6
Electrode Installation
SAIC-P-3716 SAIC-P-3716 H W
Visual Inspection for Piping Electrodes

Ground Electrode System


Fabricated / Supplemental
3.7 Electrode Installation SAIC-P-3717 SAIC-P-3717 H W
Visual Inspection for Structural Steel
Electrodes

Ground Electrode System


Fabricated / Supplemental
3.8 Electrode Installation SAIC-P-3718 SAIC-P-3718 H W
Visual Inspection for Copper Conductor
Ground Rings

Ground Electrode System


Individual Electrode
3.9 Resistance Testing SATR-P-3702 SATR-P-3702 H H
(Substation and System Grounding) for
Electrode Resistance Test (IEEE 81)

Ground Electrode System


Individual Electrode
3.10 Resistance Testing SATR-P-3703 SATR-P-3703 H H
(Substation and System Grounding) for
Electrode Resistance Test (Geonics)
Ground Electrode System
Ground Conductor Trench
3.11
Visual Inspection
SAIC-P-3333 SAIC-P-3333 H W SATIP-P-104-07 Below Grade Conduit and Duct Bank
(Before Conductor Laying)
Ground Electrode System
Ground Conductor Laying and
Two hold points; for backfilling of ground conductors and
3.12 Below-Grade Connections SAIC-P-3719 SAIC-P-3719 H W safety warning markers.
Visual Inspection for Power Ground
Electrode System (GES)
Ground Electrode System
Ground Conductor Laying and
Two hold points; for backfilling of ground conductors and
3.13 Below-Grade Connections SAIC-P-3720 SAIC-P-3720 H W safety warning markers.
Visual Inspection for Substation
Grounding

Page 3 of 12
SAUDI ARAMCO ID/PID FORM REV 1 - 010109 (Standards Cutoff-Mar 2013) Rev 7 31-Mar-13

SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:

Grounding and Bonding SATIP- P-111- 01 30-Apr-13 Electrical


PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM QUALITY QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

Ground Electrode System


Ground Conductor Laying and
3.14 Below-Grade Connections SAIC-P-3721 SAIC-P-3721 H W
Visual Inspection for Cathodic Protection
Grounding

Ground Electrode System


Ground Conductor Laying and
Two hold points; for backfilling of ground conductors and
3.15 Below-Grade Connections SAIC-P-3124 SAIC-P-3124 H W safety warning markers.
Visual Inspection for
DCS/ESD/PLC/SCADA Grounding

Ground Electrode System


Ground Conductor Laying and
3.16
Below-Grade Connections
SAIC-P-3722 SAIC-P-3722 H W
Visual Inspection for Offshore Grounding

Ground Electrode System


Ground Conductor Laying and
Two hold points; for backfilling of ground conductors and
3.17 Below-Grade Connections SAIC-P-3755 SAIC-P-3755 H W safety warning markers.
Visual Inspection for Lightning Protection
System Installation

Ground Electrode System


Ground Conductor Laying and
Two hold points; for backfilling of ground conductors and
3.18 Below-Grade Connections SAIC-P-3723 SAIC-P-3723 H W safety warning markers.
Visual Inspection for Telecommunications
GES Installation

Ground Electrode System


Ground Conductor Laying and
Two hold points; for backfilling of ground conductors and
3.19 Below-Grade Connections SAIC-P-3713 SAIC-P-3713 H W safety warning markers.
Visual Inspection for Exothermic
(Thermite) Welding

Ground Electrode System


Ground Conductor Laying and
3.20 Below-Grade Connections SAIC-P-3714 SAIC-P-3714 H W
Visual Inspection for Hydraulic
Compression Connectors

Page 4 of 12
SAUDI ARAMCO ID/PID FORM REV 1 - 010109 (Standards Cutoff-Mar 2013) Rev 7 31-Mar-13

SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:

Grounding and Bonding SATIP- P-111- 01 30-Apr-13 Electrical


PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM QUALITY QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

Ground Electrode System


Bonding Conductor Laying and
3.21 Below-Grade Connections SAIC-P-3719 SAIC-P-3719 H W
Visual Inspection for Power GES
Installation

Ground Electrode System


Bonding Conductor Laying and
3.22 Below-Grade Connections SAIC-P-3124 SAIC-P-3124 H W
Visual Inspection for
DCS/ESD/PLC/SCADA Grounding

Ground Electrode System


Bonding Conductor Laying and
3.23 Below-Grade Connections SAIC-P-3755 SAIC-P-3755 H W
Visual Inspection for Lightning Protection
System Installation

Ground Electrode System


Bonding Conductor Laying and
3.24 Below-Grade Connections SAIC-P-3723 SAIC-P-3723 H W
Visual Inspection for Telecommunications
GES Installation

Ground Electrode System


Bonding Conductor Laying and
3.25 Below-Grade Connections SAIC-P-3713 SAIC-P-3713 H W
Visual Inspection for Exothermic
(Thermite) Welding

Ground Electrode System


Bonding Conductor Laying and
3.26 Below-Grade Connections SAIC-P-3714 SAIC-P-3714 H W
Visual Inspection for Hydraulic
Compression Connectors
Ground Electrode System
Backfilling
3.27
Visual Inspection for Power GES
SAIC-P-3719 SAIC-P-3719 H W
Installation
Electrical System Grounding See also
Neutral Ground Resistor Installation SATIP-P-104-05 A/G Conduit
3.28
Visual Inspection for High Resistance
SAIC-P-3724 SAIC-P-3724 H W SATIP-P-104-02 MV Cable
Grounding SATIP-P-121-02 Power Transformer

Page 5 of 12
SAUDI ARAMCO ID/PID FORM REV 1 - 010109 (Standards Cutoff-Mar 2013) Rev 7 31-Mar-13

SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:

Grounding and Bonding SATIP- P-111- 01 30-Apr-13 Electrical


PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM QUALITY QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

Electrical System Grounding


Ground Electrode Conductor
3.29 and Main Bonding Jumper Installation SAIC-P-3724 SAIC-P-3724 H W
Visual Inspection for High Resistance
Grounding

Electrical System Grounding


Ground Electrode Conductor
3.30 and Main Bonding Jumper Installation SAIC-P-3725 SAIC-P-3725 H W
Visual Inspection for LV Dry Transformer
Grounding

Electrical System Grounding


Ground Electrode Conductor
3.31 and Main Bonding Jumper Installation SAIC-P-3726 SAIC-P-3726 H W
Visual Inspection for Panelboard
Grounding

Electrical System Grounding


Ground Electrode Conductor
3.32 and Main Bonding Jumper Installation SAIC-P-3727 SAIC-P-3727 H W
Visual Inspection for Switchgear /
Controlgear Grounding

Electrical System Grounding


Ground Electrode Conductor
3.33 and Main Bonding Jumper Installation SAIC-P-3125 SAIC-P-3125 H W
Visual Inspection for AC UPS System
Grounding

Electrical System Grounding


Ground Electrode Conductor
3.34 and Main Bonding Jumper Installation SAIC-P-3126 SAIC-P-3126 H W
Visual Inspection for DC System
Grounding

Electrical System Grounding


Ground Electrode Conductor
3.35 and Main Bonding Jumper Installation SAIC-P-3728 SAIC-P-3728 H W
Visual Inspection for DG Set System
Grounding

Page 6 of 12
SAUDI ARAMCO ID/PID FORM REV 1 - 010109 (Standards Cutoff-Mar 2013) Rev 7 31-Mar-13

SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:

Grounding and Bonding SATIP- P-111- 01 30-Apr-13 Electrical


PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM QUALITY QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

Electrical System Grounding


Ground Electrode Conductor
3.36 and Main Bonding Jumper Installation SAIC-P-3729 SAIC-P-3729 H W
Visual Inspection for ATS / MTS System
Grounding

Electrical System Grounding


Ground Electrode Conductor
3.37 and Main Bonding Jumper Installation SAIC-P-3730 SAIC-P-3730 H W
Visual Inspection for Pad-Mounted
Transformer Grounding

Electrical System Grounding


Ground Electrode Conductor
3.38 and Main Bonding Jumper Installation SAIC-P-3731 SAIC-P-3731 H W
Visual Inspection for Power Transformer
Grounding

Electrical System Grounding


Ground Electrode Conductor
3.39 and Main Bonding Jumper Installation SAIC-P-3732 SAIC-P-3732 H W
Visual Inspection for Variable Speed Drive
Grounding
Electrical System Grounding
Ground Electrode Conductor
3.40 and Main Bonding Jumper Installation SAIC-P-3713 SAIC-P-3713 H W
Visual Inspection for Exothermic
(Thermite) Welding

Electrical System Grounding


Ground Electrode Conductor
3.41 and Main Bonding Jumper Installation SAIC-P-3714 SAIC-P-3714 H W
Visual Inspection for Hydraulic
Compression Connectors

Equipment Ground Conductor


and Bonding Jumper Installation
3.42
Visual Inspection for Cable Tray Grounding
SAIC-P-3733 SAIC-P-3733 H W
/ Bonding
Equipment Ground Conductor
and Bonding Jumper Installation
3.43
Visual Inspection for Conduit Grounding /
SAIC-P-3734 SAIC-P-3734 H W
Bonding

Page 7 of 12
SAUDI ARAMCO ID/PID FORM REV 1 - 010109 (Standards Cutoff-Mar 2013) Rev 7 31-Mar-13

SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:

Grounding and Bonding SATIP- P-111- 01 30-Apr-13 Electrical


PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM QUALITY QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

Equipment Grounding / Bonding


and Supplementary Grounding
Equipment Ground Conductor
3.44
and Bonding Jumper Installation
SAIC-P-3735 SAIC-P-3735 H W
Visual Inspection for Buried Cable
Grounding / Bonding
Equipment Grounding / Bonding
and Supplementary Grounding
Equipment Ground Conductor
3.45
and Bonding Jumper Installation
SAIC-P-3736 SAIC-P-3736 H W
Visual Inspection for Duct bank/ Electrical
Manhole Grounding / Bonding
Equipment Grounding / Bonding
and Supplementary Grounding
Equipment Ground Conductor
3.46
and Bonding Jumper Installation
SAIC-P-3737 SAIC-P-3737 H W
Visual Inspection for Electrical Eqpt.
Grounding / Bonding
Equipment Grounding / Bonding
and Supplementary Grounding
Equipment Ground Conductor
3.47
and Bonding Jumper Installation
SAIC-P-3738 SAIC-P-3738 H W
Visual Inspection for Instrumentation
Grounding / Bonding / Shielding

Equipment Grounding / Bonding


and Supplementary Grounding
Equipment Ground Conductor
3.48
and Bonding Jumper Installation
SAIC-P-3739 SAIC-P-3739 H W
Visual Inspection for Surge Arrestor
Grounding / Bonding

Equipment Grounding / Bonding


and Supplementary Grounding
Equipment Ground Conductor
3.49
and Bonding Jumper Installation
SAIC-P-3740 SAIC-P-3740 H W
Visual Inspection for Process Eqpt.
Grounding / Bonding

Page 8 of 12
SAUDI ARAMCO ID/PID FORM REV 1 - 010109 (Standards Cutoff-Mar 2013) Rev 7 31-Mar-13

SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:

Grounding and Bonding SATIP- P-111- 01 30-Apr-13 Electrical


PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM QUALITY QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

Equipment Grounding / Bonding


and Supplementary Grounding
Equipment Ground Conductor
3.50
and Bonding Jumper Installation
SAIC-P-3741 SAIC-P-3741 H W
Visual Inspection for Structural Steel
Grounding / Bonding

Equipment Grounding / Bonding


and Supplementary Grounding
Equipment Ground Conductor
3.51
and Bonding Jumper Installation
SAIC-P-3742 SAIC-P-3742 H W
Visual Inspection for LV Cable Grounding /
Bonding

Equipment Grounding / Bonding


and Supplementary Grounding
Equipment Ground Conductor
3.52
and Bonding Jumper Installation
SAIC-P-3743 SAIC-P-3743 H W
Visual Inspection for MV Cable Grounding
/ Bonding / Shielding

Equipment Grounding / Bonding


and Supplementary Grounding
Equipment Ground Conductor
3.53
and Bonding Jumper Installation
SAIC-P-3744 SAIC-P-3744 H W
Visual Inspection for Raised Floor
Grounding / Bonding

Equipment Grounding / Bonding


and Supplementary Grounding
Equipment Ground Conductor
3.54
and Bonding Jumper Installation
SAIC-P-3745 SAIC-P-3745 H W
Visual Inspection for Offshore Grounding /
Bonding

Equipment Grounding / Bonding


and Supplementary Grounding
Equipment Ground Conductor
3.55
and Bonding Jumper Installation
SAIC-P-3746 SAIC-P-3746 H W
Visual Inspection for Fence Grounding /
Bonding

Page 9 of 12
SAUDI ARAMCO ID/PID FORM REV 1 - 010109 (Standards Cutoff-Mar 2013) Rev 7 31-Mar-13

SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:

Grounding and Bonding SATIP- P-111- 01 30-Apr-13 Electrical


PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM QUALITY QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

Equipment Grounding / Bonding


and Supplementary Grounding
Equipment Ground Conductor
3.56
and Bonding Jumper Installation
SAIC-P-3747 SAIC-P-3747 H W
Visual Inspection for Tank Grounding /
Bonding

Equipment Grounding / Bonding


and Supplementary Grounding
Equipment Ground Conductor
3.57
and Bonding Jumper Installation
SAIC-P-3748 SAIC-P-3748 H W
Visual Inspection for Static Electricity
Grounding / Bonding

Equipment Grounding / Bonding


and Supplementary Grounding
Equipment Ground Conductor
3.58
and Bonding Jumper Installation
SAIC-P-3749 SAIC-P-3749 H W
Visual Inspection for Isolated Grounding /
Bonding

Equipment Grounding / Bonding


and Supplementary Grounding
Equipment Ground Conductor
3.59
and Bonding Jumper Installation
SAIC-P-3713 SAIC-P-3713 H W
Visual Inspection for Exothermic
(Thermite) Welding

Equipment Grounding / Bonding


and Supplementary Grounding
Equipment Ground Conductor
3.60
and Bonding Jumper Installation
SAIC-P-3714 SAIC-P-3714 H W
Visual Inspection for Hydraulic
Compression Connectors

4.0 PRE-COMMISSIONING

Equipment Grounding / Bonding,


Supplementary Grounding, and
4.1 Electrical System Grounding SATR-P-3704 SATR-P-3704 H W Continuity to GES (VOM)
Ground Continuity Testing
(Installed Cable)

Page 10 of 12
SAUDI ARAMCO ID/PID FORM REV 1 - 010109 (Standards Cutoff-Mar 2013) Rev 7 31-Mar-13

SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:

Grounding and Bonding SATIP- P-111- 01 30-Apr-13 Electrical


PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM QUALITY QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

Ground Electrode System


Grid Resistance Testing
4.2
(Installed Grid) for GES Resistance Test
SATR-P-3702 SATR-P-3702 H H
(IEEE 81)

Ground Electrode System


Grid Resistance Testing
4.3
(Installed Grid) for GES Resistance Test
SATR-P-3703 SATR-P-3703 H H
(Geonics)

Electrical System Grounding


4.4
Neutral Ground Resistor Testing
SATR-P-3705 SATR-P-3705 H W

Equipment Grounding / Bonding,


Supplementary Grounding, and
4.5 Electrical System Grounding SATR-P-3706 SATR-P-3706 H W Electrical Equipment with Mechanical Fasteners
Cable Termination
Torque Testing

Grounding System Review EIL and all associated Quality Records


4.6
Final Inspection
See Remarks EIL H H Hold point for Energization

Grounding System
Energization
4.7 Quality Document Review and FEIL
Certificate
RH RH Review FEIL and all associated Quality Records
Energization Certificate

GENERAL NOTES
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust the
1
levels of Saudi Aramco participation based upon the Contractor’s performance.
2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC
3
organization representative is not present.
Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization
4
representative in attendance.
5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.

Accessories include mechanical fasteners, listed grounding straps and clamps, flexible (braided) ground straps, conductive lubricating grease, anti-oxidizing compound, calcined petroleum coke, coke
6 breeze, rubber tape, plastic tape, and coatings (epoxy, aluminum alkyd, zinc chromate, and bituminous coatings).
Notify SA PID by RFI on initial receipt of each listed accessory (by type and/or manufacturer).

Page 11 of 12
SAUDI ARAMCO ID/PID FORM REV 1 - 010109 (Standards Cutoff-Mar 2013) Rev 7 31-Mar-13

SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:

Grounding and Bonding SATIP- P-111- 01 30-Apr-13 Electrical


PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM QUALITY QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

LEGEND
H Hold Point for QC Inspection/ Test R Review of Documents
W Witness Inspection/Test RH Review and Approval of Documents
S Surveillance I 100% Contractor Inspection