You are on page 1of 4
cq EMERGENCY EVACUATION MOCK DRILL REPORT ‘Chemie-Tech MOCK DRILL REPORT DDATE OF MOCK DRILL 23-Sep-19 2019 TIME OF START 1852 Hs "TOE OF CLEARANCE 1540 Hs ‘TYPE OF EMERGENCY Assumed |: | wore inte inside tank BRIEF - SCENARIO IP wil eins tank no. 32020 A aa informed incident contol, where + | nedentcontoter states the ERP declare as emargeny. DETALED STEPS. 1 hs rar Fal on i 08 teat hte | |store on tree axctstecrent. | [AICTL Team, DORC & OPR Team present neocon assembled on ste | ‘ascenily pat (TL ncdert Commander Cal emergency toa fo rescue te visi. (CTL Incident Commander informed including Doctor, Emergency nurs, Smbulnce ndvescoe! sec eam, CCTLERT team reached to location 8 rescue he worker (CTL Ambulance esehed te nident Locaton Vlei ws escued safely ou of te confined face Rescued worker satin Ambiance to Ste clin for urter Maal ‘Search eam contemed thal nobdy inside the taro tb locaton, ead cous start at ssarly pont an foune no oe missing [Al lar Message from Chae-Tech ncdont Commandor Bing about the cil gen toa by CTL & DORC, DPRY CTL QAC & Execiton team. ncn he demonstaton ofContined Space Rescue meds THING TO NOTE & EVALUATE 1+ Aooass& gto up oan ocaone was 0 Brough Famat Na CF-FHSOD1 RO Page tote > enzxcencr evacusnon uock DRL REPORT [MOCK -ORILL Record & Evaluation DDATE OF MOCK DRILL zavera019 TIME OF START isazres ‘TIME OF CLEARANCE. S40 HS ‘TOTAL TIME TAKEN FOR DRILL 05 Mute ‘TYPE OF EMERGENCY Confined Space Rescue ASSEMBLY POINT NO, enree ‘AREA OF OPERATION Tank Erecton [NAME OF ASSEMBLY PONT CONTROLLER Mer Sarwar Alay S.No. om Ovsenations | Remarks 1 ee of Fst Ca [839 He [2 Time of Ava of Ambulance! Emergency Snveos 156 He 3 [Tine ofthe Rescue eam lene Emergency scene 4 ime of Fst parson Arived at assombly Pol jsseres 5 ime of Las parson Ave at Assembly Pint fs36 he é al Head count Recorded e 7 (om of Vets Recorded s a (os, Of Mstng Personal Recorded a Information of the tsing Personnel passed at Time to a escuela 0 [earch & Rescue Operation Ita at Tene ee " [Search & Ras Operation Complete at Time ee 2 he End Emergency Cal at Tne ves WNY OTHER OBSERVATION: POSITIVE RESPONSE: 1 Atworkors reached at sasembly point wihin tre minutes. {Search ad rescuo toam chaclad the ste and conf al sf ncusng iors. {ERP toa ake out hand sete Formato: CEHS-01-80 Page 2a oe ‘OBSERVATIONS (RECORDED IN DEBRIEFING MEETING) DATEOF MOCKDRLL = 296Sep.2019 ‘TIME OF START 1832 Hee "TIME OF CLEARANCE 18:40 te TYPEOF EMERGENCY: Confined Space Rescue ‘SR Nos. ‘OBSERVATIONS. + [access & gree up oan ations wasnt trough 2 [Wate Tay dacharge 3. [ETLERT response tne was god & appreciated 4+ [ate Emergency Contt numbers wore active & everyone alended the cl mmednsly (Aula river, ERT Reactor) sR RECOMMENDATIONS. Nos. he vesponce ine &rasovery ated are saison, no pede rcammaniaon was observed rg the il. Resources Used forte Dil Ambulance 5. Hand Sete Name & Sign of Observer begseson Famat ha C7FHS201.0 Poyesers EMERGENCY EVACUATION MOCK DRILL REPORT Chemie-Tech PHOTOS Drill Witnessed by: DPRIDORCICTL Execution Team

You might also like