‘Acro Eneray
Borescope Inspection
Report
28/09, 2019
Unit A
ESN 481-012
Unies
GE project 1999123 / 2897805
Customer Representative:
GE Field Service Representative:
AAlltechnical recommendations and information contained in this report are based on GE manuals that
hhave been developed and approved for use with GE engines and parts that have been operated and
maintained in accordance with GE technical documentation and recommendations,
GE has no technical knowledge of, nor obligation for, non GE-approved parts and repairs. Accordingly,
this report is not intended to apply to non GE-approved parts and repairs, nor to any parts that may be
directly or indirectly affected by non GE-approved parts and repair.
Report completed by ~@
Aero Enerey
CONCLUSIONS & RECOMMENDATIONS
‘The purpose of this visit was to perform a Periodic Borescope Inspection.
Engine wasn't wash before the BSI and will be done before start
Found engine dirty
LUM25005AC Report
This Periodie Borescope inspection was completed in accordance with WP 406 09.
\With the Filter house inspection found the filter dirty, a change of the filter needs to be done soon,
Found some ail in the ir inlet, inlet will be cleaned after the water wash by the costumer reps.
‘The unit is available for cor
ntinued operation,
Engine Data:
ESN 481012 Engine Fired Hours Package Hours 34829
Model | 1M 2500Sac | Engine Fired starts Package Fired Starts 145
‘Maintenance Data:
‘WP, 56, St, PB, PL | Revislon/manual reference Date Comments
Pecformed completed
‘WP 405 00 Borescope Inspection 28.02.2019 Serviceable
Report completed by ~@
‘ero Enerey
LM2500SAC Report
DETAILS AND DATA
Purpose of visi
‘The purpose of this visit was to perform a Periodic Borescope Inspection IAW WP 406 00.
Work performed:
A borescope of the engine was performed using a Mentor flex scope and a electrical turning tool
The engine was not water washed before the borescope, ths is done after the inspection, before starting up.
\VSV system check, opened by 13 Bar and closed by 15 Bar. Need more pressure for open and close the IGV/VSV
system.
Filter house inspection (dirty filters)
Inlet inspection. (some corrosion on the inlet wall)
External engine inspection
Sereens and chip detectars checked, no findings.
HP recoup eale,cale shows no orifice change needed.
7 Fuel nozale check and found alli limit
Daily activities
27-02-2019 Travel
28-02-2019 Borescope and external engine inspection 481-012 and checked 7 fuel nozzles
29-02-2019 Travel onshore
Report completed by ~ 3‘Aero Energy
Results:
Lm2500sAc Report
Found dust on Filter house floor before filters
Be
Corrosion on inlet wall
Found oil in Air inlet
Report completed by ~@
‘ero Energy
LM25005AC Report
‘Stage 1 Mid Span
Engine inlet looks dirty
Fi
Report completed by ~@
ero Energy
LM2S00sAC Report
High Pressure Compressor Photos
GV casing found dirty
Stage Oblades ok but dirty ‘Stage 0 Mid Span found dirty
Report completed by~ 6@
‘Aero Energy
Stage LE
LUM25005AC Report
‘Stage 2LE
Stage 4 TE
Stage 6 LE
Report completed by ~@
‘Aero Energy
L25005AC Report
Stage 14 TE
Stage 15 LE Dir build up
Report completed by~@
Aero Enerey
LMa2500sAcReport
High Pressure Compressor
Inspection Avea ‘Comments
Exlinspect stages 1 through 16 blades for cracks, nicks, tears, burs, dents, mising
material, evidence of tip dang, curl or deformation
[Bae Senviceable
Dastage Blades (cay 26) & Vanes é Servceable
Bclstage 2 Blades (Qty 26) & Vanes Serviceable
Ecstage 3 Blades (Quy 42) & Vanes Senviceable
xstage Blades (Qty 45) & Vanes —[Ssenvceabie
[ Bestages elades (ary 48) & Vanes Seniceable
| elstage 6 blades (Qty 54) & Vanes Seniceable
TKlstage 7 Blades (Qty 56) & Vanes Not ns
| Listage'® Blades (Qty 64) & Vanes Not insp
Listages siades (Qty 66) & Vanes Not ins
[ Estage 10 Blades (ty 66) & Vanes Not ins.
stage 11 Blades (Qty 76) & Vanes Not inp,
[Ess ads a ThE Vane Seni
Stage 13 Blades (Qty 76) & Vanes Servieable
Stage 14 Blades (Qty 76) & Vanes Not ins,
Stage 15 Blades (Qty 76) & Vanes Servieable
Exlinspect for erosion, corrasin or deposits.
lnspect for platform singling, bowing, distortion or eracks
Report completed by ~@
Aero Energy
LM25005AC Report
fuer noze OW OUTER DETAIL B
fete ASSHLY UNE
\.
ourine —-§ \,
ene
vfruseR, when
cr
~o0Me
®
| SEE VIEW A
LeGenp:
1.038 11. WIGGLE STRIP RING 20, SUMRLERAENTUR
2. BUSHING, MOUNTING PIN 12 fIVET JOINT 21 DOME CUPiSAINL cUP
S.GGLE RING 1 S000 LouNeRs 2D. SPARK IGNTER TUBE (2 PLACES)
SE BWER COTW 1 SCOOP LOUVERS. 35. TRUNIPET PLATE
5. DFFUSER Box 15, BAND (TYPICAL) 24. DOME PLATE
6, nen RING 16, BAND COOLING HOLES 25, DOE RING-EMBOSSMENTIOONE BAND
F-OUTER AIG 7. SEAL. 26 INTER SLEEVE (@ PLACES)
8 OUTER COWL 16 IGHTER SLEEVE RETAINER 27, VENTURI
FUEL NOZMLE eveLET 19, SVIRLERVENTUR: RETAINER 28, WEAR SLEEVE
10 IGReTER EYELET
VIEW A
SS sowe
“¥ overnun
SURFACES,
SBE DETAIL 8
Report completed by: loero Ene
L2soosAc Report
nee: uTtR §=—«OUTER OUTER SiHTENEN ouTeR ‘SEE VIEW C
eh TMB, a6 gute ou ue Z
Sa ceorere ct, GRE AS RB
Fie nor nessun Ue AS \ “
Sha Sve HOLE LOCATIONS ARE
ROIATED FOR LAITY Oe LUSTRATON
ia. gm
gol
our 7
i avs
: *
ition ‘SEE VIEW B
=
—— |, seeiew ma Be
Yee orm x aden Xf
som cur eye 1
een baie [Coors
mee mn Or = ™
| ft no
“| /cout wo (rere ee WR | ew oar
aan x me
an, i rh mse ‘eet
SOLER “HEGHT (TYPICAL)
ew
HK
s0.s8 men (16) =(17)-2088 : oo a9)
Ir ic 10.92 en I6) «(17-1082 : 33———t9}
Predicted ADJUGTHENT needed to Curent Otioe Diamar (nches)
ey 78> a) OF (10/78 (2 2.00 __c0)
Calculated Recoupe Oriffce with the available data. No change needed,
Report completed by ~@
Aero Energy
LUM25005AC Report
Euel Nozzle inspection:
FUEL NOZZLE (fe fpe $17 ig Fo 54
ane as Fs. 5.18 (Dil Fu)
ne
| wa ,
9 cea ees
Set ae sane solar
= ne Gare
ace uae Gee
pele nas) (Gibasy. 29
eee
Sten
=
me
exes
Youmier
‘Dila5.5 COMBUSTION EINER ASSEMBLY AND FUEL NOZZLES. Coed
Sie me Ons
MavSeventle Maapunble —Coseate
pet ciate a ‘stn
Dbalfeieaieme
Mek eats, Novena oolsia ——Soormaiat
‘hen orm (3am) aeal Reglce
eos Soa ded usage
3. Fuad Nene Spy Ones:
2 CatoeDaost Netra Aeysnent — Ranoseeuten
‘SFeatenene
4 Freie
2 Spuling
Report completed by ~ 20@
Aero Energy
LM25005AC Report
Work perform by JKP
Fuel nozzle Tip = 19,1 mm
Not measured probe 9:
Fuel nozzle position | Measure or change 9-9-2018 2018 Measured probe 28-2-2019
4 New 18.9 mm
10 New 19.1 mm
4 x 18.8mm
16 “New 19.0 mm
2 18.9 mm 189mm.
Ea x 188mm,
29 18.8 mm 18.8mm
All measured Fuel nozzle tips are with in limit
Report completed by ~" - a