You are on page 1of 192

Criteria

Date 31-May-22
Time Of Report 9:00 AM
A.1 PNP PERSONNEL A.2 SOCIAL MEDIA AND SOCIAL
STRENGTH ADVISORY
PROs/UNITs

NR OF RSSF PERSONNEL
NR OF SRR PERSONNEL
TOTAL STRENGTH

MESSAGES
INTERNET
RADIO
TV

NCRPO 1 2 3 4 5 6 7
PRO1 1 2 3 4 5 6 7
PRO2 1 2 3 4 5 6 7
PRO3 1 2 3 4 5 6 7
PRO4A 1 2 3 4 5 6 7
PRO4B 1 2 3 4 5 6 7
PRO5 1 2 3 4 5 6 7
PRO6 1 2 3 4 5 6 7
PRO7 1 2 3 4 5 6 7
PRO8 1 2 3 4 5 6 7
PRO9 1 2 3 4 5 6 7
PRO10 1 2 3 4 5 6 7
PRO11 1 2 3 4 5 6 7
PRO12 1 2 3 4 5 6 7
PRO13 1 2 3 4 5 6 7
PROBAR 1 2 3 4 5 6 7
PROCOR 123 2 3 4 5 6 7
TOTAL 139 34 51 68 85 102 119
NDOC MONITORING
A. PRE-DISASTER STAGE

A.3
A.4
A AND SOCIAL DIRECTIVES
COMMUNICATION A.5 EQUIPPAGE
ORY AND
EQUIPMENT
MEETINGS

PNP OWNED SEARCH, RESCUE, AND RE


COMMUNICATION OR OTHER
ACTIVITIES CONDUCTED
DIRECTIVE DISPATCHED

SATELITE PHONES

RAPELLING SET
PNP BLUE BOX

RESCUE ROPE
SPINE BOARD
LIFE VEST
OTHERS
RADIOS
PRINT

8 9 10 11 12 13 14 15 16 17 18
8 9 10 11 12 13 14 15 16 17 18
8 9 10 11 12 13 14 15 16 17 18
8 9 10 11 12 13 14 15 16 17 18
8 9 10 11 12 13 14 15 16 17 18
8 9 10 11 12 13 14 15 16 17 18
8 9 10 11 12 13 14 15 16 17 18
8 9 10 11 12 13 14 15 16 17 18
8 9 10 11 12 13 14 15 16 17 18
8 9 10 11 12 13 14 15 16 17 18
8 9 10 11 12 13 14 15 16 17 18
8 9 10 11 12 13 14 15 16 17 18
8 9 10 11 12 13 14 15 16 17 18
8 9 10 11 12 13 14 15 16 17 18
8 9 10 11 12 13 14 15 16 17 18
8 9 10 11 12 13 14 15 16 17 18
8 9 10 11 12 13 14 15 16 17 18
136 153 170 187 204 221 238 255 272 289 306
5 EQUIPPAGE A.6 MOBILITY ASSETS

EARCH, RESCUE, AND RETRIEVAL ASSETS/EQUIPPAGE

RUBBER BOAT WITHOUT

TACTICAL WATERCRAFT
PORTABLE GENERATOR

MOTORIZED BANCA

OUTBOARD MOTOR
UTILITY TRUCK
FLOATING RIN

LIGHT TRUCK
MEGAPHONE

AMBULANCE

DRUM BOAT
CHAINSAW

19 20 21 22 23 24 25 26 27 28 29
19 20 21 22 23 24 25 26 27 28 29
19 20 21 22 23 24 25 26 27 28 29
19 20 21 22 23 24 25 26 27 28 29
19 20 21 22 23 24 25 26 27 28 29
19 20 21 22 23 24 25 26 27 28 29
19 20 21 22 23 24 25 26 27 28 29
19 20 21 22 23 24 25 26 27 28 29
19 20 21 22 23 24 25 26 27 28 29
19 20 21 22 23 24 25 26 27 28 29
19 20 21 22 23 24 25 26 27 28 29
19 20 21 22 23 24 25 26 27 28 29
19 20 21 22 23 24 25 26 27 28 29
19 20 21 22 23 24 25 26 27 28 29
19 20 21 22 23 24 25 26 27 28 29
19 20 21 22 23 24 25 26 27 28 29
19 20 21 22 23 24 25 26 27 28 29
323 340 357 374 391 408 425 442 459 476 493
NDOC M
NDOC MONITORING
B. DISASTER RESPONSES STAGE (DURING THE TYPHOON)

B.2 EVACUATION CENTER


B.1 DEPLOYMENT OF PNP PERSONNEL
RELATED DATA

RECAPITULA NR OF EVACUATION
IN STRANDED AREAS
TION CENTER

NR OF TOTAL PERSONNEL
IN EVACUATION CENTERS

NR OF RSSF PERSONNEL
IN AFFECTED AREAS
IN VACATED AREAS

BUS TERMINAL

ESTABLISHED
DEPLOYED

OCCUPIED
SEAPORT
AIRPORT
IN WCPD

31 32 33 34 36 37 38 39 40 41 42
31 32 33 34 36 37 38 39 40 41 42
31 32 33 34 36 37 38 39 40 41 42
31 32 33 34 36 37 38 39 40 41 42
31 32 33 34 36 37 38 39 40 41 42
31 32 33 34 36 37 38 39 40 41 42
31 32 33 34 36 37 38 39 40 41 42
31 32 33 34 36 37 38 39 40 41 42
31 32 33 34 36 37 38 39 40 41 42
31 32 33 34 36 37 38 39 40 41 42
31 32 33 34 36 37 38 39 40 41 42
31 32 33 34 36 37 38 39 40 41 42
31 32 33 34 36 37 38 39 40 41 42
31 32 33 34 36 37 38 39 40 41 42
31 32 33 34 36 37 38 39 40 41 42
31 32 33 34 36 37 38 39 40 41 42
31 32 33 34 36 37 38 39 40 41 42
527 544 561 578 612 629 646 663 680 697 714
NDOC MONITORING
NDOC MO
YPHOON) C. AFTER

.2 EVACUATION CENTERS C.3 LAW AND


C.1 RESPONSE OPERATIONS C.2 RELIEF OPERATIONS
RELATED DATA ORDER

NR OF NR OF
F EVACUATION NR OF NR OF RELIEF
RESCUE RETRIEVAL
CENTER EVACUESS OPERATIONS
OPERATIONS OPERATIONS

TOTAL ESTIMATED AMOUNT

NR OF REPORTED LOOTING
RESCUED INDIVIDUALS

NR OF INDIVIDUALS AS
RETRIEVED BODY OR

RELIEF OPERATIONS
BENEFECIARIES
INDIVIDUALLY

CONDUCTED

CONDUCTED

CONDUCTED

INCIDENTS
BY FAMILY

CADAVER
VACANT

43 44 45 46 47 48 49 50 51 52 53
43 44 45 46 47 48 49 50 51 52 53
43 44 45 46 47 48 49 50 51 52 53
43 44 45 46 47 48 49 50 51 52 53
43 44 45 46 47 48 49 50 51 52 53
43 44 45 46 47 48 49 50 51 52 53
43 44 45 46 47 48 49 50 51 52 53
43 44 45 46 47 48 49 50 51 52 53
43 44 45 46 47 48 49 50 51 52 53
43 44 45 46 47 48 49 50 51 52 53
43 44 45 46 47 48 49 50 51 52 53
43 44 45 46 47 48 49 50 51 52 53
43 44 45 46 47 48 49 50 51 52 53
43 44 45 46 47 48 49 50 51 52 53
43 44 45 46 47 48 49 50 51 52 53
43 44 45 46 47 48 49 50 51 52 53
43 44 45 46 47 48 49 50 51 52 53
731 748 765 782 799 816 833 850 867 884 901
NDOC MONITORING
C. AFTER THE TYPHOON

NR OF PNP PERSONNEL DEPLOYED AS WAREHOUSE SECURITY


C.4
ROAD
CLEA
C.3 LAW AND C.5 Security Operations(Warehouse/Groceries/Gas
RING C.6 DONATIONS

NR OF PERSONNEL DEPLOYES AS BANK SECURITY


ORDER Stations/Banks)
OPER
ATION
S C.5.2
C.5.1 GROCERIES
C.5.3 GAS
WAREHOUSE OR C.5.4 BANKS
STATIONS
S SUPERMARK
NR OF ARRESTED INDIVIDUALS

ETS

Nr Of PNP Personnel Deployed As


DUE TO LOOTING INCIDENTS

DEPLOYED AS GROCERIES OR
OPERATIONS CONDUCTED

SUPERMARKET SECURITY
NR OF ROAD CLEARING

NR OF PNP PERSONNEL

NR OF GAS STATIONS
NR OF WAREHOUSES

NR OF GROCERIES OR

Gas Station Security

NR OF DONORS
SUPERMARKETS

NR OF BANKS

54 55 56 57 58 59 60 61 62 63 64
54 55 56 57 58 59 60 61 62 63 64
54 55 56 57 58 59 60 61 62 63 64
54 55 56 57 58 59 60 61 62 63 64
54 55 56 57 58 59 60 61 62 63 64
54 55 56 57 58 59 60 61 62 63 64
54 55 56 57 58 59 60 61 62 63 64
54 55 56 57 58 59 60 61 62 63 64
54 55 56 57 58 59 60 61 62 63 64
54 55 56 57 58 59 60 61 62 63 64
54 55 56 57 58 59 60 61 62 63 64
54 55 56 57 58 59 60 61 62 63 64
54 55 56 57 58 59 60 61 62 63 64
54 55 56 57 58 59 60 61 62 63 64
54 55 56 57 58 59 60 61 62 63 64
54 55 56 57 58 59 60 61 62 63 64
54 55 56 57 58 59 60 61 62 63 64
918 935 952 969 986 1003 1020 1037 1054 1071 1088
D.3
D.2 DAMAGED
D.1 DAMAGED
C.6 DONATIONS INFRASTRUCT D.4 CASUALTIES
AFFECTED PNP
URE
EQUIPMENT

PNP OR NUP

NR OF DAMAGED PNP EQUIPMENT

ESTIMATED COST OF DAMAGE TO


NR OF DAMAGED PNP BUILDING

ESTIMATED COST OF DAMAGED


ESTIMATED AMOUNT OF
NR OF RECIPIENTS OR

PNP EQUIPMENT
BENEFICIARIES

PNP BUILDING
DONATION

INJURED

MISSING
DEAD
NUP
PNP

65 66 67 68 69 70 71 72 73 74 75
65 66 67 68 69 70 71 72 73 74 75
65 66 67 68 69 70 71 72 73 74 75
65 66 67 68 69 70 71 72 73 74 75
65 66 67 68 69 70 71 72 73 74 75
65 66 67 68 69 70 71 72 73 74 75
65 66 67 68 69 70 71 72 73 74 75
65 66 67 68 69 70 71 72 73 74 75
65 66 67 68 69 70 71 72 73 74 75
65 66 67 68 69 70 71 72 73 74 75
65 66 67 68 69 70 71 72 73 74 75
65 66 67 68 69 70 71 72 73 74 75
65 66 67 68 69 70 71 72 73 74 75
65 66 67 68 69 70 71 72 73 74 75
65 66 67 68 69 70 71 72 73 74 75
65 66 67 68 69 70 71 72 73 74 75
65 66 67 68 69 70 71 72 73 74 75
1105 1122 1139 1156 1173 1190 1207 1224 1241 1258 1275
NDOC MONITORING

D. POST DISASTER STAGE (AFTERMATH OR EFFECTS)

D.7
D.6 LANDSLIDE AFFECTED
D.4 CASUALTIES D.5 FLOODED AREAS
INCENT ROADS AND
BRIDGES

CIVILIAN NR OF AFFECTED INDIVIDUALS

NR OF AFFECTED INDIVIDUALS
NR OF AFFECTED BARANGAYS

NR OF AFFECTED BARANGAYS

NR OF UNPASSABLE BRIDGES
NR OF AFFECTED FAMILIES

NR OF AFFECTED FAMILIES

NR OF UNPASSABLE ROADS
INJURED

MISSING
DEAD

76 77 78 79 80 81 82 83 84 85 86
76 77 78 79 80 81 82 83 84 85 86
76 77 78 79 80 81 82 83 84 85 86
76 77 78 79 80 81 82 83 84 85 86
76 77 78 79 80 81 82 83 84 85 86
76 77 78 79 80 81 82 83 84 85 86
76 77 78 79 80 81 82 83 84 85 86
76 77 78 79 80 81 82 83 84 85 86
76 77 78 79 80 81 82 83 84 85 86
76 77 78 79 80 81 82 83 84 85 86
76 77 78 79 80 81 82 83 84 85 86
76 77 78 79 80 81 82 83 84 85 86
76 77 78 79 80 81 82 83 84 85 86
76 77 78 79 80 81 82 83 84 85 86
76 77 78 79 80 81 82 83 84 85 86
76 77 78 79 80 81 82 83 84 85 86
76 77 78 79 80 81 82 83 84 85 86
1292 1309 1326 1343 1360 1377 1394 1411 1428 1445 1462
ECTS)

D.9
D.8 AFFECTED POWER, WATER AND TRANSPORTATION D.10 STRANDED
COMMUNICATION LINES SITUATION OR PASSENGERS
STATUS

ELECTRICIT
WATER TELCOM
Y

NR OF CANCELLED SHIP VOGAGE

NR OF CANCELLED BUS VOYAGE


NR OF BARANGAY RESTORED

NR OF BARANGAY RESTORED

NR OF BARANGAY RESTORED

NR OF CANCELLED FLIGHTS
NR OF BARANGAY WITHOUT

NR OF BARANGAY WITHOUT

NR OF BARANGAY WITHOUT
TELCO (SIGNAL)
ELECTRICITY

IN SEAPORTS
IN AIRPORTS
WATER

87 88 89 90 91 92 93 94 95 96 97
87 88 89 90 91 92 93 94 95 96 97
87 88 89 90 91 92 93 94 95 96 97
87 88 89 90 91 92 93 94 95 96 97
87 88 89 90 91 92 93 94 95 96 97
87 88 89 90 91 92 93 94 95 96 97
87 88 89 90 91 92 93 94 95 96 97
87 88 89 90 91 92 93 94 95 96 97
87 88 89 90 91 92 93 94 95 96 97
87 88 89 90 91 92 93 94 95 96 97
87 88 89 90 91 92 93 94 95 96 97
87 88 89 90 91 92 93 94 95 96 97
87 88 89 90 91 92 93 94 95 96 97
87 88 89 90 91 92 93 94 95 96 97
87 88 89 90 91 92 93 94 95 96 97
87 88 89 90 91 92 93 94 95 96 97
87 88 89 90 91 92 93 94 95 96 97
1479 1496 1513 1530 1547 1564 1581 1598 1615 1632 1649
10 STRANDED
CROSSCHECKER
ASSENGERS
IN BUS TERMINALS

98
98
98
98
98
98
98
98
98
98
98
98
98
98
98
98
98
1666
A.1 PNP PERSONNEL
STRENGTH

Time Of
Date PRO/UNIT SUBUNIT/DPO/PPO/CPO CPS/MPS
Report

NR OF SRR PERSONNEL
TOTAL STRENGTH
31-May-22 9:00 AM PROCOR 123 2
STRENGTH

3
NR OF RSSF PERSONNEL

NP PERSONNEL

4
TV

5
RADIO

6
INTERNET
ADVISORY

7
MESSAGES

8
PRINT
A.2 SOCIAL MEDIA AND SOCIAL

9
DIRECTIVE DISPATCHED
A.3

AND

COMMUNICATION/OTHER ACTIVITIES

10
MEETINGS

CONDUCTED
DIRECTIVES

11
RADIOS
12

SATELITE PHONES
A.4

EQUIPMENT

13

OTHERS
COMMUNICATION
PNP OWNED SEARCH, RESCUE, AND RETRIEVAL ASSETS/EQUIPPAGE

A.5 PNP OWNED SEARCH AND RESCUE ASSETS/EQUIPPAGE A.6 PNP OWNED MO

PORTABLE GENERATOR
FLOATING RING

UTILITY TRUCK
RAPELLING SET
PNP BLUE BOX

LIGHT TRUCK
RESCUE ROPE
SPINE BOARD

MEGAPHONE

CHAINSAW
LIFE VEST

14 15 16 17 18 19 20 21 22 23 24
25
AMBULANCE

TS/EQUIPPAGE

26
MOTORIZED BANCA

RUBBER BOAT WITHOUT

27
OUTBOARD MOTOR

28
DRUM BOAT
A.6 PNP OWNED MOBILITY ASSETS

29
TACTICAL WATERCRAFT

SAR VEHICLE WITH WATER

30
DESALINATION MACHINE

NR OF DEPLOYED PNP PERSONNEL AT

31
EVACUATON CENTERS

NR OF DEPLOYED WCPD PERSONNEL

32
AT EVACUATION CENTER

33 NR OF DEPLOYED PNP PERSONNEL AT


VACATED AREAS

NR OF DEPLOYED PNP PERSONNEL AT


34

AFFECTED AREAS

NR OF DEPLOYED PNP SRR PERSONNEL


35

AT AFFECTED AREAS
B. DISASTER RESPONSES S

B.1 DEPLOYMENT OF PNP PERSONN


NR OF DEPLOYED PNP

36
PERSONNEL AT AIRPORT

NR OF DEPLOYED PNP

37
PERSONNEL AT SEAPORT

AREAS
NR OF DEPLOYED PNP

38
YMENT OF PNP PERSONNEL

PERSONNEL AT BUS
B.1.6 AT STRANDED
TERMINAL
TOTAL NR OF DEPLOYED

39
PERSONNEL
B.1.7

TOTAL NR OF RSSF
TION OF

40
PERSONNEL
RECAPITULA

NR OF EVACUATION CENER

41
ESTABLISHED BY LGU
DISASTER RESPONSES STAGE (DURING THE TYPHOON)

NR OF EVACUATION

42
CENTERS OCCUPIED
CENTER

NR OF VACANT EVACUATION

43
CENTERS
NR OF EVACUATION
RELATED DATA

44
BY FAMILY
B.2 EVACUATION CENTERS

NR OF

45

PER INDIVIDUAL
EVACUESS

NUMBER OF RESCUE
46

OPERATIONS CONDUCTED
RESCUE
OPERATIONS
C.1 RESPONSE OPERAT
NR OF RESCUED

RESCUE

47
INDIVIDUALS

NR OF RETRIEVAL

48
OPERATIONS CONDUCTED

NR OF RETRIEVED BODY OR

49
C.1 RESPONSE OPERATIONS

RETRIEVAL
CADAVER

NR OF RELIEF OPERATIONS OPERATIONS OPERATIONS

50
CONDUCTED
NR OF BENEFECIARIES

51
(INDIVIDUALS) OF RELIEF
OPERATIONS
OPERATIONS
NR OF RELIEF

52
TOTAL ESTIMATED AMOUNT

53
NR OF REPORTED LOOTING INCIDENTS
C.2 RELIEF OPERATIONS (DURING)
ORDER

NR OF ARRESTED INDIVIDUALS DUE TO

54
LOOTING INCIDENTS
C.3 LAW AND

NR OF ROAD CLEARING OPERATIONS


55

CONDUCTED
C.4 ROAD
CLEARING
OPERATIONS

56

NR OF WAREHOUSES
S

57
C. RESPONSE OPERATIONS

WAREHOUSE

NR OF PNP PERSONNEL DEPLOYED


S
C.5 Security Operat
NR OF GROCERIES OR RATIONS

58
SUPERMARKETS

OR

ETS
NR OF PNP PERSONNEL

59
DEPLOYED

GROCERIES

SUPERMARK

60
NR OF GAS STATIONS
Stations/Banks)

GAS

61
Nr Of PNP Personnel Deployed
STATIONS

62
NR OF BANKS
C.5 Security Operations(WarehouseS/Groceries/Gas

BANKS

63
NR OF PNP PERSONNEL DEPLOYED

64
NR OF DONORS

65
NR OF RECIPIENTS OR BENEFICIARIES
C.6 DONATIONS

66
ESTIMATED AMOUNT OF DONATION
67

PNP
D.1

PNP/NUP

68

NUP
AFFECTED
69
NR OF DAMAGED PNP BUILDING

URE
ESTIMATED COST OF DAMAGED PNP

70
BUILDING
D.2 DAMAGED
INFRASTRUCT

71
NR OF DAMAGED PNP EQUIPMENT
D.3

PNP

ESTIMATED COST OF DAMAGE TO PNP

72
DAMAGED

EQUIPMENT
EQUIPMENT

73
DEAD

74
INJURED
PNP OR NUP

75
MISSING

76
DEAD
D.4 CASUALTIES

77
INJURED
CIVILIAN

78

MISSING
79

NR OF AFFECTED BARANGAYS
D. POST DISASTER S

D.5 FLOODED AREAS


80
NR OF AFFECTED FAMILIES

81
NR OF AFFECTED INDIVIDUALS D.5 FLOODED AREAS

82
NR OF AFFECTED BARANGAYS

83
NR OF AFFECTED FAMILIES
INCENT
D6. LANDSLIDE

84
NR OF AFFECTED INDIVIDUALS

85
NR OF IMPASSABLE ROADS
D.7
D. POST DISASTER STAGE (AFTERMATH OR EFFECTS)

BRIDGES

86
NR OF IMPASSABLE BRIDGES
AFFECTED
ROADS AND

NR OF BARANGAY WITHOUT

87
ELECTRICITY
Y
D.8.1

88
NR OF BARANGAY RESTORED

NR OF BARANGAY WITHOUT
89

WATER
90

NR OF BARANGAY RESTORED
ELECTRICIT D.8.2 WATER
COMMUNICATION LINES
D.8 AFFECTED POWER, WATER AND
NR OF BARANGAY WITHOUT

91
CATION LINES
TELCO (SIGNAL)

OWER, WATER AND

92
NR OF BARANGAY RESTORED

D.8.3 TELCOM

93
NR OF CANCELLED FLIGHTS

94
NR OF CANCELLED SHIP VOGAGE
D.9

STATUS
SITUATION OR

95
NR OF CANCELLED BUS VOYAGE/TRIP
TRANSPORTATION

96
IN AIRPORTS

97
IN SEAPORTS
PASSENGERS
D.10 STRANDED

98
IN BUS TERMINALS
Date

Date

31-May-22
Time Of Report

Report
Time Of
PRO/UNIT

9:00 AM PROBAR
PRO/UNIT

SUBUNIT/DPO/PPO/CPO
SUBUNIT/DPO/PPO/CPO

CPS/MPS
CPS/MPS

1
Total Strength TOTAL STRENGTH

2
Strength-Nr Of SRR Personnel NR OF SRR PERSONNEL
STRENGTH
A.1 PNP PERSONNEL
STRENGTH

3
Strength-Nr Of RSSF Personnel NR OF RSSF PERSONNEL

NP PERSONNEL

4
Social Media and Media Advisory-TV TV

5
Social Media and Media Advisory-Radio RADIO

6
Social Media and Media Advisory-Internet INTERNET
ADVISORY

7
Social Media and Media Advisory-Messages MESSAGES

8
Social Media and Media Advisory-Print PRINT
A.2 SOCIAL MEDIA AND SOCIAL

9
Directives and Meetings-Dispatched DIRECTIVE DISPATCHED
A.3

AND

Communication Or Other Activities COMMUNICATION/OTHER ACTIVITIES

10
MEETINGS

Conducted CONDUCTED
DIRECTIVES

11
SRR Equipment-Radios RADIOS

12
SRR Equipment-Satelite Phones SATELITE PHONES
A.4

EQUIPMENT

13
SRR Equipment-Others OTHERS
COMMUNICATION
14
SRR Equipment-PNP Blue Box PNP BLUE BOX

15
SRR Equipment-Life Vest LIFE VEST

16
SRR Equipment-Spine Board SPINE BOARD

17
SRR Equipment-Rescue Rope RESCUE ROPE

18
SRR Equipment-Rapelling Set RAPELLING SET

19
SRR Equipment-Floating Ring FLOATING RING

20
SRR Equipment-Megaphone MEGAPHONE

21
SRR Equipment-Chainsaw CHAINSAW
A.5 PNP OWNED SEARCH AND RESCUE ASSETS/EQUIPPAGE

22
SRR Equipment-Portable Generator PORTABLE GENERATOR

23
SRR Equipment-Utility Truck UTILITY TRUCK

24
SRR Equipment-Light Truck LIGHT TRUCK
PNP OWNED SEARCH, RESCUE, AND RETRIEVAL ASSETS/EQUIPPAGE

A.6 PNP OWNED MO


25
SRR Equipment-Ambulance AMBULANCE

TS/EQUIPPAGE

26
SRR Equipment-Motorized Banca MOTORIZED BANCA

SRR Equipment-Rubber boat withou RUBBER BOAT WITHOUT

27
Outboard Motor OUTBOARD MOTOR

28
SRR Equipment-Drum Boat DRUM BOAT
A.6 PNP OWNED MOBILITY ASSETS

29
SRR Equipment-Tactical Watercraft TACTICAL WATERCRAFT

RR Equipment-SAR Vehicle With Water SAR VEHICLE WITH WATER

30
Desalination Machine DESALINATION MACHINE

Nr Of PNP Personnel Deployed In NR OF DEPLOYED PNP PERSONNEL AT

31
Evacuation Center EVACUATON CENTERS

Nr Of PNP WCPD Personnel Deployed In NR OF DEPLOYED WCPD PERSONNEL

32
Evacuation Centers AT EVACUATION CENTER

Nr Of PNP Personnel Deployed In Vacated NR OF DEPLOYED PNP PERSONNEL AT

33
Areas VACATED AREAS

Nr Of PNP Personnel Deployed in Affected NR OF DEPLOYED PNP PERSONNEL AT

34
Areas AFFECTED AREAS

NR OF DEPLOYED PNP SRR PERSONNEL

35
Nr Of SRR Personnel Deployed
AT AFFECTED AREAS
B. DISASTER RESPONSES S

B.1 DEPLOYMENT OF PNP PERSONN


Nr Of PNP Personnel Deployed In Stranded NR OF DEPLOYED PNP

36
Areas-Airport PERSONNEL AT AIRPORT

Nr Of PNP Personnel Deployed In Stranded NR OF DEPLOYED PNP

37
Area-Seaport PERSONNEL AT SEAPORT

AREAS
NR OF DEPLOYED PNP
Nr Of PNP Personnel Deployed In Stranded

38
YMENT OF PNP PERSONNEL

PERSONNEL AT BUS
B.1.6 AT STRANDED
Area-Bus Terminal
TERMINAL
TOTAL NR OF DEPLOYED

39
Total Nr Of Personnel Deployed
PERSONNEL
B.1.7

TOTAL NR OF RSSF
TION OF

40
Nr Of RSSF Personnel
PERSONNEL
RECAPITULA

Nr Of Evacuation Center Established NR OF EVACUATION CENER

41
Established By LGU ESTABLISHED BY LGU
DISASTER RESPONSES STAGE (DURING THE TYPHOON)

NR OF EVACUATION

42
Nr Of Evacuation Centers Occupied
CENTERS OCCUPIED
CENTER

NR OF VACANT EVACUATION

43
Nr Of Vacant Evacuation Centers
CENTERS
NR OF EVACUATION
RELATED DATA

44
Nr Of Evacuess By Family BY FAMILY
B.2 EVACUATION CENTERS

NR OF

45
Nr Of Evacuess Individually PER INDIVIDUAL
EVACUESS

NUMBER OF RESCUE

46
Nr Of Rescue Operations Conducted
OPERATIONS CONDUCTED
RESCUE
OPERATIONS
C.1 RESPONSE OPERAT
NR OF RESCUED

RESCUE

47
Nr Of Rescued Individuals
INDIVIDUALS

NR OF RETRIEVAL

48
Nr Of Retrieval Operations Conducted
OPERATIONS CONDUCTED

NR OF RETRIEVED BODY OR

49
Nr Of Retrieved Body Or Cadaver
C.1 RESPONSE OPERATIONS

RETRIEVAL
CADAVER

NR OF RELIEF OPERATIONS OPERATIONS OPERATIONS

50
Nr Of Relief Operations Conducted
CONDUCTED
NR OF BENEFECIARIES
Nr Of Individuals As Relief Operations

51
(INDIVIDUALS) OF RELIEF
Beneficiaries
OPERATIONS
OPERATIONS
NR OF RELIEF

52
Total Estimated Amount TOTAL ESTIMATED AMOUNT

53
Nr Of Reported Looting Incidents NR OF REPORTED LOOTING INCIDENTS
C.2 RELIEF OPERATIONS (DURING)
ORDER

Nr Of Arrested Individuals Due To Looting NR OF ARRESTED INDIVIDUALS DUE TO

54
Incidents LOOTING INCIDENTS
C.3 LAW AND

NR OF ROAD CLEARING OPERATIONS

55
Nr Of Road Clearing Operations Conducted
CONDUCTED
C.4 ROAD
CLEARING
OPERATIONS

56
Nr Of Warehouse NR OF WAREHOUSES
S

Nr Of PNP Personnel Deployed As

57
Warehouse Security
C. RESPONSE OPERATIONS

WAREHOUSE

NR OF PNP PERSONNEL DEPLOYED


S
C.5 Security Operat
NR OF GROCERIES OR RATIONS

58
Nr Of Groceries Or Supermarket SUPERMARKETS

OR

ETS
Nr Of PNP Personnel Deployed As Groceries NR OF PNP PERSONNEL

59
DEPLOYED

GROCERIES
Or Supermarket Security

SUPERMARK

60
Nr Of Gas Station NR OF GAS STATIONS
Stations/Banks)

GAS
Nr Of PNP Personnel Deployed As Gas

61
Nr Of PNP Personnel Deployed
STATIONS
Station Security

62
Nr Of Banks NR OF BANKS
C.5 Security Operations(WarehouseS/Groceries/Gas

BANKS

63
Nr Of Personnel Deployed As Bank Security
NR OF PNP PERSONNEL DEPLOYED

64
Nr Of Donors NR OF DONORS

65
Nr Of Recipients Or Beneficiaries NR OF RECIPIENTS OR BENEFICIARIES
C.6 DONATIONS

66
Estimated Amount Of Donation ESTIMATED AMOUNT OF DONATION

67
Affected Personnel-PNP PNP
D.1

PNP/NUP

68
Affected Personnel -NUP NUP
AFFECTED
69
Nr Of Damaged PNP Building NR OF DAMAGED PNP BUILDING

URE
ESTIMATED COST OF DAMAGED PNP

70
Estimaged Cost Of Damaged PNP Building
BUILDING
D.2 DAMAGED
INFRASTRUCT

71
Nr Of Damaged PNP Equipment NR OF DAMAGED PNP EQUIPMENT
D.3

PNP

ESTIMATED COST OF DAMAGE TO PNP

72
Estimated Cost of Damaged PNP Equipment
DAMAGED

EQUIPMENT
EQUIPMENT

73
Casualties-PNP-Or-NUP-Dead DEAD

74
Casualties-PNP-Or-NUP-Injured INJURED
PNP OR NUP

75
Casualties-PNP-Or-NUP-Missing MISSING

76
Casualties-Civilian-Dead DEAD
D.4 CASUALTIES

77
Casualties-Civilian-Injured INJURED
CIVILIAN

78
Casualties-Civilian-Missing MISSING

79
Flooded Areas-Nr Of Affected Barangays NR OF AFFECTED BARANGAYS
D. POST DISASTER S

D.5 FLOODED AREAS


80
Flooded Areas-Nr Of Affected Families NR OF AFFECTED FAMILIES

81
Flooded Areas-Nr Of Affected Individuals NR OF AFFECTED INDIVIDUALS D.5 FLOODED AREAS

82
Landslide Incident-Nr Of Affected Barangays NR OF AFFECTED BARANGAYS

83
Landslide Incident-Nr Of Affected Families NR OF AFFECTED FAMILIES
INCENT

Landslide Incident-Nr Of Affected


D6. LANDSLIDE

84
NR OF AFFECTED INDIVIDUALS
Individuals

85
Nr Of Impassable Roads NR OF IMPASSABLE ROADS
D.7
D. POST DISASTER STAGE (AFTERMATH OR EFFECTS)

BRIDGES

86
Nr Of Impassable Bridges NR OF IMPASSABLE BRIDGES
AFFECTED
ROADS AND

NR OF BARANGAY WITHOUT

87
Nr Of Barangay Without Electricity
ELECTRICITY
Y
D.8.1

88
Nr Of Barangay Electricity Restored NR OF BARANGAY RESTORED

NR OF BARANGAY WITHOUT

89
Nr Of Barangay Without-Water
WATER

90
Nr Of Barangay Water Supply Restored NR OF BARANGAY RESTORED
ELECTRICIT D.8.2 WATER
COMMUNICATION LINES
D.8 AFFECTED POWER, WATER AND
NR OF BARANGAY WITHOUT

91
Nr Of Barangay Without Telco Signal

CATION LINES
TELCO (SIGNAL)

OWER, WATER AND

92
Nr of Barangay Telco Signal Restored NR OF BARANGAY RESTORED

D.8.3 TELCOM

93
Nr Of Cancelled Flights NR OF CANCELLED FLIGHTS

94
Nr Of Cancelled Ship Vogage NR OF CANCELLED SHIP VOGAGE
D.9

STATUS
SITUATION OR

95
Nr Of Cancelled Bus Voyage NR OF CANCELLED BUS VOYAGE/TRIP
TRANSPORTATION

96
Stranded Passengers-At Airport IN AIRPORTS

97
Stranded Passengers-At Seaport IN SEAPORTS
PASSENGERS
D.10 STRANDED

98
Stranded Passengers-At Terminal IN BUS TERMINALS
Date

Date

31-May-22
Time Of Report

Report
Time Of

9:00 AM PRO13
PRO/UNIT
PRO/UNIT

SUBUNIT/DPO/PPO/CPO
SUBUNIT/DPO/PPO/CPO

CPS/MPS
CPS/MPS

1
Total Strength TOTAL STRENGTH

2
Strength-Nr Of SRR Personnel NR OF SRR PERSONNEL
STRENGTH
A.1 PNP PERSONNEL
STRENGTH

3
Strength-Nr Of RSSF Personnel NR OF RSSF PERSONNEL

NP PERSONNEL

4
Social Media and Media Advisory-TV TV

5
Social Media and Media Advisory-Radio RADIO

6
Social Media and Media Advisory-Internet INTERNET
ADVISORY

7
Social Media and Media Advisory-Messages MESSAGES

8
Social Media and Media Advisory-Print PRINT
A.2 SOCIAL MEDIA AND SOCIAL

9
Directives and Meetings-Dispatched DIRECTIVE DISPATCHED
A.3

AND

Communication Or Other Activities COMMUNICATION/OTHER ACTIVITIES

10
MEETINGS

Conducted CONDUCTED
DIRECTIVES

11
SRR Equipment-Radios RADIOS

12
SRR Equipment-Satelite Phones SATELITE PHONES
A.4

EQUIPMENT

13
SRR Equipment-Others OTHERS
COMMUNICATION
14
SRR Equipment-PNP Blue Box PNP BLUE BOX

15
SRR Equipment-Life Vest LIFE VEST

16
SRR Equipment-Spine Board SPINE BOARD

17
SRR Equipment-Rescue Rope RESCUE ROPE

18
SRR Equipment-Rapelling Set RAPELLING SET

19
SRR Equipment-Floating Ring FLOATING RING

20
SRR Equipment-Megaphone MEGAPHONE

21
SRR Equipment-Chainsaw CHAINSAW
A.5 PNP OWNED SEARCH AND RESCUE ASSETS/EQUIPPAGE

22
SRR Equipment-Portable Generator PORTABLE GENERATOR

23
SRR Equipment-Utility Truck UTILITY TRUCK

24
SRR Equipment-Light Truck LIGHT TRUCK
PNP OWNED SEARCH, RESCUE, AND RETRIEVAL ASSETS/EQUIPPAGE

A.6 PNP OWNED MO


25
SRR Equipment-Ambulance AMBULANCE

TS/EQUIPPAGE

26
SRR Equipment-Motorized Banca MOTORIZED BANCA

SRR Equipment-Rubber boat withou RUBBER BOAT WITHOUT

27
Outboard Motor OUTBOARD MOTOR

28
SRR Equipment-Drum Boat DRUM BOAT
A.6 PNP OWNED MOBILITY ASSETS

29
SRR Equipment-Tactical Watercraft TACTICAL WATERCRAFT

RR Equipment-SAR Vehicle With Water SAR VEHICLE WITH WATER

30
Desalination Machine DESALINATION MACHINE

Nr Of PNP Personnel Deployed In NR OF DEPLOYED PNP PERSONNEL AT

31
Evacuation Center EVACUATON CENTERS

Nr Of PNP WCPD Personnel Deployed In NR OF DEPLOYED WCPD PERSONNEL

32
Evacuation Centers AT EVACUATION CENTER

Nr Of PNP Personnel Deployed In Vacated NR OF DEPLOYED PNP PERSONNEL AT

33
Areas VACATED AREAS

Nr Of PNP Personnel Deployed in Affected NR OF DEPLOYED PNP PERSONNEL AT

34
Areas AFFECTED AREAS

NR OF DEPLOYED PNP SRR PERSONNEL

35
Nr Of SRR Personnel Deployed
AT AFFECTED AREAS
B. DISASTER RESPONSES S

B.1 DEPLOYMENT OF PNP PERSONN


Nr Of PNP Personnel Deployed In Stranded NR OF DEPLOYED PNP

36
Areas-Airport PERSONNEL AT AIRPORT

Nr Of PNP Personnel Deployed In Stranded NR OF DEPLOYED PNP

37
Area-Seaport PERSONNEL AT SEAPORT

AREAS
NR OF DEPLOYED PNP
Nr Of PNP Personnel Deployed In Stranded

38
YMENT OF PNP PERSONNEL

PERSONNEL AT BUS
B.1.6 AT STRANDED
Area-Bus Terminal
TERMINAL
TOTAL NR OF DEPLOYED

39
Total Nr Of Personnel Deployed
PERSONNEL
B.1.7

TOTAL NR OF RSSF
TION OF

40
Nr Of RSSF Personnel
PERSONNEL
RECAPITULA

Nr Of Evacuation Center Established NR OF EVACUATION CENER

41
Established By LGU ESTABLISHED BY LGU
DISASTER RESPONSES STAGE (DURING THE TYPHOON)

NR OF EVACUATION

42
Nr Of Evacuation Centers Occupied
CENTERS OCCUPIED
CENTER

NR OF VACANT EVACUATION

43
Nr Of Vacant Evacuation Centers
CENTERS
NR OF EVACUATION
RELATED DATA

44
Nr Of Evacuess By Family BY FAMILY
B.2 EVACUATION CENTERS

NR OF

45
Nr Of Evacuess Individually PER INDIVIDUAL
EVACUESS

NUMBER OF RESCUE

46
Nr Of Rescue Operations Conducted
OPERATIONS CONDUCTED
RESCUE
OPERATIONS
C.1 RESPONSE OPERAT
NR OF RESCUED

RESCUE

47
Nr Of Rescued Individuals
INDIVIDUALS

NR OF RETRIEVAL

48
Nr Of Retrieval Operations Conducted
OPERATIONS CONDUCTED

NR OF RETRIEVED BODY OR

49
Nr Of Retrieved Body Or Cadaver
C.1 RESPONSE OPERATIONS

RETRIEVAL
CADAVER

NR OF RELIEF OPERATIONS OPERATIONS OPERATIONS

50
Nr Of Relief Operations Conducted
CONDUCTED
NR OF BENEFECIARIES
Nr Of Individuals As Relief Operations

51
(INDIVIDUALS) OF RELIEF
Beneficiaries
OPERATIONS
OPERATIONS
NR OF RELIEF

52
Total Estimated Amount TOTAL ESTIMATED AMOUNT

53
Nr Of Reported Looting Incidents NR OF REPORTED LOOTING INCIDENTS
C.2 RELIEF OPERATIONS (DURING)
ORDER

Nr Of Arrested Individuals Due To Looting NR OF ARRESTED INDIVIDUALS DUE TO

54
Incidents LOOTING INCIDENTS
C.3 LAW AND

NR OF ROAD CLEARING OPERATIONS

55
Nr Of Road Clearing Operations Conducted
CONDUCTED
C.4 ROAD
CLEARING
OPERATIONS

56
Nr Of Warehouse NR OF WAREHOUSES
S

Nr Of PNP Personnel Deployed As

57
Warehouse Security
C. RESPONSE OPERATIONS

WAREHOUSE

NR OF PNP PERSONNEL DEPLOYED


S
C.5 Security Operat
NR OF GROCERIES OR RATIONS

58
Nr Of Groceries Or Supermarket SUPERMARKETS

OR

ETS
Nr Of PNP Personnel Deployed As Groceries NR OF PNP PERSONNEL

59
DEPLOYED

GROCERIES
Or Supermarket Security

SUPERMARK

60
Nr Of Gas Station NR OF GAS STATIONS
Stations/Banks)

GAS
Nr Of PNP Personnel Deployed As Gas

61
Nr Of PNP Personnel Deployed
STATIONS
Station Security

62
Nr Of Banks NR OF BANKS
C.5 Security Operations(WarehouseS/Groceries/Gas

BANKS

63
Nr Of Personnel Deployed As Bank Security
NR OF PNP PERSONNEL DEPLOYED

64
Nr Of Donors NR OF DONORS

65
Nr Of Recipients Or Beneficiaries NR OF RECIPIENTS OR BENEFICIARIES
C.6 DONATIONS

66
Estimated Amount Of Donation ESTIMATED AMOUNT OF DONATION

67
Affected Personnel-PNP PNP
D.1

PNP/NUP

68
Affected Personnel -NUP NUP
AFFECTED
69
Nr Of Damaged PNP Building NR OF DAMAGED PNP BUILDING

URE
ESTIMATED COST OF DAMAGED PNP

70
Estimaged Cost Of Damaged PNP Building
BUILDING
D.2 DAMAGED
INFRASTRUCT

71
Nr Of Damaged PNP Equipment NR OF DAMAGED PNP EQUIPMENT
D.3

PNP

ESTIMATED COST OF DAMAGE TO PNP

72
Estimated Cost of Damaged PNP Equipment
DAMAGED

EQUIPMENT
EQUIPMENT

73
Casualties-PNP-Or-NUP-Dead DEAD

74
Casualties-PNP-Or-NUP-Injured INJURED
PNP OR NUP

75
Casualties-PNP-Or-NUP-Missing MISSING

76
Casualties-Civilian-Dead DEAD
D.4 CASUALTIES

77
Casualties-Civilian-Injured INJURED
CIVILIAN

78
Casualties-Civilian-Missing MISSING

79
Flooded Areas-Nr Of Affected Barangays NR OF AFFECTED BARANGAYS
D. POST DISASTER S

D.5 FLOODED AREAS


80
Flooded Areas-Nr Of Affected Families NR OF AFFECTED FAMILIES

81
Flooded Areas-Nr Of Affected Individuals NR OF AFFECTED INDIVIDUALS D.5 FLOODED AREAS

82
Landslide Incident-Nr Of Affected Barangays NR OF AFFECTED BARANGAYS

83
Landslide Incident-Nr Of Affected Families NR OF AFFECTED FAMILIES
INCENT

Landslide Incident-Nr Of Affected


D6. LANDSLIDE

84
NR OF AFFECTED INDIVIDUALS
Individuals

85
Nr Of Impassable Roads NR OF IMPASSABLE ROADS
D.7
D. POST DISASTER STAGE (AFTERMATH OR EFFECTS)

BRIDGES

86
Nr Of Impassable Bridges NR OF IMPASSABLE BRIDGES
AFFECTED
ROADS AND

NR OF BARANGAY WITHOUT

87
Nr Of Barangay Without Electricity
ELECTRICITY
Y
D.8.1

88
Nr Of Barangay Electricity Restored NR OF BARANGAY RESTORED

NR OF BARANGAY WITHOUT

89
Nr Of Barangay Without-Water
WATER

90
Nr Of Barangay Water Supply Restored NR OF BARANGAY RESTORED
ELECTRICIT D.8.2 WATER
COMMUNICATION LINES
D.8 AFFECTED POWER, WATER AND
NR OF BARANGAY WITHOUT

91
Nr Of Barangay Without Telco Signal

CATION LINES
TELCO (SIGNAL)

OWER, WATER AND

92
Nr of Barangay Telco Signal Restored NR OF BARANGAY RESTORED

D.8.3 TELCOM

93
Nr Of Cancelled Flights NR OF CANCELLED FLIGHTS

94
Nr Of Cancelled Ship Vogage NR OF CANCELLED SHIP VOGAGE
D.9

STATUS
SITUATION OR

95
Nr Of Cancelled Bus Voyage NR OF CANCELLED BUS VOYAGE/TRIP
TRANSPORTATION

96
Stranded Passengers-At Airport IN AIRPORTS

97
Stranded Passengers-At Seaport IN SEAPORTS
PASSENGERS
D.10 STRANDED

98
Stranded Passengers-At Terminal IN BUS TERMINALS
Date

Date

31-May-22
Time Of Report

Report
Time Of

9:00 AM PRO12
PRO/UNIT
PRO/UNIT

SUBUNIT/DPO/PPO/CPO
SUBUNIT/DPO/PPO/CPO

CPS/MPS
CPS/MPS

1
Total Strength TOTAL STRENGTH

2
Strength-Nr Of SRR Personnel NR OF SRR PERSONNEL
STRENGTH
A.1 PNP PERSONNEL
STRENGTH

3
Strength-Nr Of RSSF Personnel NR OF RSSF PERSONNEL

NP PERSONNEL

4
Social Media and Media Advisory-TV TV

5
Social Media and Media Advisory-Radio RADIO

6
Social Media and Media Advisory-Internet INTERNET
ADVISORY

7
Social Media and Media Advisory-Messages MESSAGES

8
Social Media and Media Advisory-Print PRINT
A.2 SOCIAL MEDIA AND SOCIAL

9
Directives and Meetings-Dispatched DIRECTIVE DISPATCHED
A.3

AND

Communication Or Other Activities COMMUNICATION/OTHER ACTIVITIES

10
MEETINGS

Conducted CONDUCTED
DIRECTIVES

11
SRR Equipment-Radios RADIOS

12
SRR Equipment-Satelite Phones SATELITE PHONES
A.4

EQUIPMENT

13
SRR Equipment-Others OTHERS
COMMUNICATION
14
SRR Equipment-PNP Blue Box PNP BLUE BOX

15
SRR Equipment-Life Vest LIFE VEST

16
SRR Equipment-Spine Board SPINE BOARD

17
SRR Equipment-Rescue Rope RESCUE ROPE

18
SRR Equipment-Rapelling Set RAPELLING SET

19
SRR Equipment-Floating Ring FLOATING RING

20
SRR Equipment-Megaphone MEGAPHONE

21
SRR Equipment-Chainsaw CHAINSAW
A.5 PNP OWNED SEARCH AND RESCUE ASSETS/EQUIPPAGE

22
SRR Equipment-Portable Generator PORTABLE GENERATOR

23
SRR Equipment-Utility Truck UTILITY TRUCK

24
SRR Equipment-Light Truck LIGHT TRUCK
PNP OWNED SEARCH, RESCUE, AND RETRIEVAL ASSETS/EQUIPPAGE

A.6 PNP OWNED MO


25
SRR Equipment-Ambulance AMBULANCE

TS/EQUIPPAGE

26
SRR Equipment-Motorized Banca MOTORIZED BANCA

SRR Equipment-Rubber boat withou RUBBER BOAT WITHOUT

27
Outboard Motor OUTBOARD MOTOR

28
SRR Equipment-Drum Boat DRUM BOAT
A.6 PNP OWNED MOBILITY ASSETS

29
SRR Equipment-Tactical Watercraft TACTICAL WATERCRAFT

RR Equipment-SAR Vehicle With Water SAR VEHICLE WITH WATER

30
Desalination Machine DESALINATION MACHINE

Nr Of PNP Personnel Deployed In NR OF DEPLOYED PNP PERSONNEL AT

31
Evacuation Center EVACUATON CENTERS

Nr Of PNP WCPD Personnel Deployed In NR OF DEPLOYED WCPD PERSONNEL

32
Evacuation Centers AT EVACUATION CENTER

Nr Of PNP Personnel Deployed In Vacated NR OF DEPLOYED PNP PERSONNEL AT

33
Areas VACATED AREAS

Nr Of PNP Personnel Deployed in Affected NR OF DEPLOYED PNP PERSONNEL AT

34
Areas AFFECTED AREAS

NR OF DEPLOYED PNP SRR PERSONNEL

35
Nr Of SRR Personnel Deployed
AT AFFECTED AREAS
B. DISASTER RESPONSES S

B.1 DEPLOYMENT OF PNP PERSONN


Nr Of PNP Personnel Deployed In Stranded NR OF DEPLOYED PNP

36
Areas-Airport PERSONNEL AT AIRPORT

Nr Of PNP Personnel Deployed In Stranded NR OF DEPLOYED PNP

37
Area-Seaport PERSONNEL AT SEAPORT

AREAS
NR OF DEPLOYED PNP
Nr Of PNP Personnel Deployed In Stranded

38
YMENT OF PNP PERSONNEL

PERSONNEL AT BUS
B.1.6 AT STRANDED
Area-Bus Terminal
TERMINAL
TOTAL NR OF DEPLOYED

39
Total Nr Of Personnel Deployed
PERSONNEL
B.1.7

TOTAL NR OF RSSF
TION OF

40
Nr Of RSSF Personnel
PERSONNEL
RECAPITULA

Nr Of Evacuation Center Established NR OF EVACUATION CENER

41
Established By LGU ESTABLISHED BY LGU
DISASTER RESPONSES STAGE (DURING THE TYPHOON)

NR OF EVACUATION

42
Nr Of Evacuation Centers Occupied
CENTERS OCCUPIED
CENTER

NR OF VACANT EVACUATION

43
Nr Of Vacant Evacuation Centers
CENTERS
NR OF EVACUATION
RELATED DATA

44
Nr Of Evacuess By Family BY FAMILY
B.2 EVACUATION CENTERS

NR OF

45
Nr Of Evacuess Individually PER INDIVIDUAL
EVACUESS

NUMBER OF RESCUE

46
Nr Of Rescue Operations Conducted
OPERATIONS CONDUCTED
RESCUE
OPERATIONS
C.1 RESPONSE OPERAT
NR OF RESCUED

RESCUE

47
Nr Of Rescued Individuals
INDIVIDUALS

NR OF RETRIEVAL

48
Nr Of Retrieval Operations Conducted
OPERATIONS CONDUCTED

NR OF RETRIEVED BODY OR

49
Nr Of Retrieved Body Or Cadaver
C.1 RESPONSE OPERATIONS

RETRIEVAL
CADAVER

NR OF RELIEF OPERATIONS OPERATIONS OPERATIONS

50
Nr Of Relief Operations Conducted
CONDUCTED
NR OF BENEFECIARIES
Nr Of Individuals As Relief Operations

51
(INDIVIDUALS) OF RELIEF
Beneficiaries
OPERATIONS
OPERATIONS
NR OF RELIEF

52
Total Estimated Amount TOTAL ESTIMATED AMOUNT

53
Nr Of Reported Looting Incidents NR OF REPORTED LOOTING INCIDENTS
C.2 RELIEF OPERATIONS (DURING)
ORDER

Nr Of Arrested Individuals Due To Looting NR OF ARRESTED INDIVIDUALS DUE TO

54
Incidents LOOTING INCIDENTS
C.3 LAW AND

NR OF ROAD CLEARING OPERATIONS

55
Nr Of Road Clearing Operations Conducted
CONDUCTED
C.4 ROAD
CLEARING
OPERATIONS

56
Nr Of Warehouse NR OF WAREHOUSES
S

Nr Of PNP Personnel Deployed As

57
Warehouse Security
C. RESPONSE OPERATIONS

WAREHOUSE

NR OF PNP PERSONNEL DEPLOYED


S
C.5 Security Operat
NR OF GROCERIES OR RATIONS

58
Nr Of Groceries Or Supermarket SUPERMARKETS

OR

ETS
Nr Of PNP Personnel Deployed As Groceries NR OF PNP PERSONNEL

59
DEPLOYED

GROCERIES
Or Supermarket Security

SUPERMARK

60
Nr Of Gas Station NR OF GAS STATIONS
Stations/Banks)

GAS
Nr Of PNP Personnel Deployed As Gas

61
Nr Of PNP Personnel Deployed
STATIONS
Station Security

62
Nr Of Banks NR OF BANKS
C.5 Security Operations(WarehouseS/Groceries/Gas

BANKS

63
Nr Of Personnel Deployed As Bank Security
NR OF PNP PERSONNEL DEPLOYED

64
Nr Of Donors NR OF DONORS

65
Nr Of Recipients Or Beneficiaries NR OF RECIPIENTS OR BENEFICIARIES
C.6 DONATIONS

66
Estimated Amount Of Donation ESTIMATED AMOUNT OF DONATION

67
Affected Personnel-PNP PNP
D.1

PNP/NUP

68
Affected Personnel -NUP NUP
AFFECTED
69
Nr Of Damaged PNP Building NR OF DAMAGED PNP BUILDING

URE
ESTIMATED COST OF DAMAGED PNP

70
Estimaged Cost Of Damaged PNP Building
BUILDING
D.2 DAMAGED
INFRASTRUCT

71
Nr Of Damaged PNP Equipment NR OF DAMAGED PNP EQUIPMENT
D.3

PNP

ESTIMATED COST OF DAMAGE TO PNP

72
Estimated Cost of Damaged PNP Equipment
DAMAGED

EQUIPMENT
EQUIPMENT

73
Casualties-PNP-Or-NUP-Dead DEAD

74
Casualties-PNP-Or-NUP-Injured INJURED
PNP OR NUP

75
Casualties-PNP-Or-NUP-Missing MISSING

76
Casualties-Civilian-Dead DEAD
D.4 CASUALTIES

77
Casualties-Civilian-Injured INJURED
CIVILIAN

78
Casualties-Civilian-Missing MISSING

79
Flooded Areas-Nr Of Affected Barangays NR OF AFFECTED BARANGAYS
D. POST DISASTER S

D.5 FLOODED AREAS


80
Flooded Areas-Nr Of Affected Families NR OF AFFECTED FAMILIES

81
Flooded Areas-Nr Of Affected Individuals NR OF AFFECTED INDIVIDUALS D.5 FLOODED AREAS

82
Landslide Incident-Nr Of Affected Barangays NR OF AFFECTED BARANGAYS

83
Landslide Incident-Nr Of Affected Families NR OF AFFECTED FAMILIES
INCENT

Landslide Incident-Nr Of Affected


D6. LANDSLIDE

84
NR OF AFFECTED INDIVIDUALS
Individuals

85
Nr Of Impassable Roads NR OF IMPASSABLE ROADS
D.7
D. POST DISASTER STAGE (AFTERMATH OR EFFECTS)

BRIDGES

86
Nr Of Impassable Bridges NR OF IMPASSABLE BRIDGES
AFFECTED
ROADS AND

NR OF BARANGAY WITHOUT

87
Nr Of Barangay Without Electricity
ELECTRICITY
Y
D.8.1

88
Nr Of Barangay Electricity Restored NR OF BARANGAY RESTORED

NR OF BARANGAY WITHOUT

89
Nr Of Barangay Without-Water
WATER

90
Nr Of Barangay Water Supply Restored NR OF BARANGAY RESTORED
ELECTRICIT D.8.2 WATER
COMMUNICATION LINES
D.8 AFFECTED POWER, WATER AND
NR OF BARANGAY WITHOUT

91
Nr Of Barangay Without Telco Signal

CATION LINES
TELCO (SIGNAL)

OWER, WATER AND

92
Nr of Barangay Telco Signal Restored NR OF BARANGAY RESTORED

D.8.3 TELCOM

93
Nr Of Cancelled Flights NR OF CANCELLED FLIGHTS

94
Nr Of Cancelled Ship Vogage NR OF CANCELLED SHIP VOGAGE
D.9

STATUS
SITUATION OR

95
Nr Of Cancelled Bus Voyage NR OF CANCELLED BUS VOYAGE/TRIP
TRANSPORTATION

96
Stranded Passengers-At Airport IN AIRPORTS

97
Stranded Passengers-At Seaport IN SEAPORTS
PASSENGERS
D.10 STRANDED

98
Stranded Passengers-At Terminal IN BUS TERMINALS
Date

Date

31-May-22
Time Of Report

Report
Time Of

9:00 AM PRO11
PRO/UNIT
PRO/UNIT

SUBUNIT/DPO/PPO/CPO
SUBUNIT/DPO/PPO/CPO

CPS/MPS
CPS/MPS

1
Total Strength TOTAL STRENGTH

2
Strength-Nr Of SRR Personnel NR OF SRR PERSONNEL
STRENGTH
A.1 PNP PERSONNEL
STRENGTH

3
Strength-Nr Of RSSF Personnel NR OF RSSF PERSONNEL

NP PERSONNEL

4
Social Media and Media Advisory-TV TV

5
Social Media and Media Advisory-Radio RADIO

6
Social Media and Media Advisory-Internet INTERNET
ADVISORY

7
Social Media and Media Advisory-Messages MESSAGES

8
Social Media and Media Advisory-Print PRINT
A.2 SOCIAL MEDIA AND SOCIAL

9
Directives and Meetings-Dispatched DIRECTIVE DISPATCHED
A.3

AND

Communication Or Other Activities COMMUNICATION/OTHER ACTIVITIES

10
MEETINGS

Conducted CONDUCTED
DIRECTIVES

11
SRR Equipment-Radios RADIOS

12
SRR Equipment-Satelite Phones SATELITE PHONES
A.4

EQUIPMENT

13
SRR Equipment-Others OTHERS
COMMUNICATION
14
SRR Equipment-PNP Blue Box PNP BLUE BOX

15
SRR Equipment-Life Vest LIFE VEST

16
SRR Equipment-Spine Board SPINE BOARD

17
SRR Equipment-Rescue Rope RESCUE ROPE

18
SRR Equipment-Rapelling Set RAPELLING SET

19
SRR Equipment-Floating Ring FLOATING RING

20
SRR Equipment-Megaphone MEGAPHONE

21
SRR Equipment-Chainsaw CHAINSAW
A.5 PNP OWNED SEARCH AND RESCUE ASSETS/EQUIPPAGE

22
SRR Equipment-Portable Generator PORTABLE GENERATOR

23
SRR Equipment-Utility Truck UTILITY TRUCK

24
SRR Equipment-Light Truck LIGHT TRUCK
PNP OWNED SEARCH, RESCUE, AND RETRIEVAL ASSETS/EQUIPPAGE

A.6 PNP OWNED MO


25
SRR Equipment-Ambulance AMBULANCE

TS/EQUIPPAGE

26
SRR Equipment-Motorized Banca MOTORIZED BANCA

SRR Equipment-Rubber boat withou RUBBER BOAT WITHOUT

27
Outboard Motor OUTBOARD MOTOR

28
SRR Equipment-Drum Boat DRUM BOAT
A.6 PNP OWNED MOBILITY ASSETS

29
SRR Equipment-Tactical Watercraft TACTICAL WATERCRAFT

RR Equipment-SAR Vehicle With Water SAR VEHICLE WITH WATER

30
Desalination Machine DESALINATION MACHINE

Nr Of PNP Personnel Deployed In NR OF DEPLOYED PNP PERSONNEL AT

31
Evacuation Center EVACUATON CENTERS

Nr Of PNP WCPD Personnel Deployed In NR OF DEPLOYED WCPD PERSONNEL

32
Evacuation Centers AT EVACUATION CENTER

Nr Of PNP Personnel Deployed In Vacated NR OF DEPLOYED PNP PERSONNEL AT

33
Areas VACATED AREAS

Nr Of PNP Personnel Deployed in Affected NR OF DEPLOYED PNP PERSONNEL AT

34
Areas AFFECTED AREAS

NR OF DEPLOYED PNP SRR PERSONNEL

35
Nr Of SRR Personnel Deployed
AT AFFECTED AREAS
B. DISASTER RESPONSES S

B.1 DEPLOYMENT OF PNP PERSONN


Nr Of PNP Personnel Deployed In Stranded NR OF DEPLOYED PNP

36
Areas-Airport PERSONNEL AT AIRPORT

Nr Of PNP Personnel Deployed In Stranded NR OF DEPLOYED PNP

37
Area-Seaport PERSONNEL AT SEAPORT

AREAS
NR OF DEPLOYED PNP
Nr Of PNP Personnel Deployed In Stranded

38
YMENT OF PNP PERSONNEL

PERSONNEL AT BUS
B.1.6 AT STRANDED
Area-Bus Terminal
TERMINAL
TOTAL NR OF DEPLOYED

39
Total Nr Of Personnel Deployed
PERSONNEL
B.1.7

TOTAL NR OF RSSF
TION OF

40
Nr Of RSSF Personnel
PERSONNEL
RECAPITULA

Nr Of Evacuation Center Established NR OF EVACUATION CENER

41
Established By LGU ESTABLISHED BY LGU
DISASTER RESPONSES STAGE (DURING THE TYPHOON)

NR OF EVACUATION

42
Nr Of Evacuation Centers Occupied
CENTERS OCCUPIED
CENTER

NR OF VACANT EVACUATION

43
Nr Of Vacant Evacuation Centers
CENTERS
NR OF EVACUATION
RELATED DATA

44
Nr Of Evacuess By Family BY FAMILY
B.2 EVACUATION CENTERS

NR OF

45
Nr Of Evacuess Individually PER INDIVIDUAL
EVACUESS

NUMBER OF RESCUE

46
Nr Of Rescue Operations Conducted
OPERATIONS CONDUCTED
RESCUE
OPERATIONS
C.1 RESPONSE OPERAT
NR OF RESCUED

RESCUE

47
Nr Of Rescued Individuals
INDIVIDUALS

NR OF RETRIEVAL

48
Nr Of Retrieval Operations Conducted
OPERATIONS CONDUCTED

NR OF RETRIEVED BODY OR

49
Nr Of Retrieved Body Or Cadaver
C.1 RESPONSE OPERATIONS

RETRIEVAL
CADAVER

NR OF RELIEF OPERATIONS OPERATIONS OPERATIONS

50
Nr Of Relief Operations Conducted
CONDUCTED
NR OF BENEFECIARIES
Nr Of Individuals As Relief Operations

51
(INDIVIDUALS) OF RELIEF
Beneficiaries
OPERATIONS
OPERATIONS
NR OF RELIEF

52
Total Estimated Amount TOTAL ESTIMATED AMOUNT

53
Nr Of Reported Looting Incidents NR OF REPORTED LOOTING INCIDENTS
C.2 RELIEF OPERATIONS (DURING)
ORDER

Nr Of Arrested Individuals Due To Looting NR OF ARRESTED INDIVIDUALS DUE TO

54
Incidents LOOTING INCIDENTS
C.3 LAW AND

NR OF ROAD CLEARING OPERATIONS

55
Nr Of Road Clearing Operations Conducted
CONDUCTED
C.4 ROAD
CLEARING
OPERATIONS

56
Nr Of Warehouse NR OF WAREHOUSES
S

Nr Of PNP Personnel Deployed As

57
Warehouse Security
C. RESPONSE OPERATIONS

WAREHOUSE

NR OF PNP PERSONNEL DEPLOYED


S
C.5 Security Operat
NR OF GROCERIES OR RATIONS

58
Nr Of Groceries Or Supermarket SUPERMARKETS

OR

ETS
Nr Of PNP Personnel Deployed As Groceries NR OF PNP PERSONNEL

59
DEPLOYED

GROCERIES
Or Supermarket Security

SUPERMARK

60
Nr Of Gas Station NR OF GAS STATIONS
Stations/Banks)

GAS
Nr Of PNP Personnel Deployed As Gas

61
Nr Of PNP Personnel Deployed
STATIONS
Station Security

62
Nr Of Banks NR OF BANKS
C.5 Security Operations(WarehouseS/Groceries/Gas

BANKS

63
Nr Of Personnel Deployed As Bank Security
NR OF PNP PERSONNEL DEPLOYED

64
Nr Of Donors NR OF DONORS

65
Nr Of Recipients Or Beneficiaries NR OF RECIPIENTS OR BENEFICIARIES
C.6 DONATIONS

66
Estimated Amount Of Donation ESTIMATED AMOUNT OF DONATION

67
Affected Personnel-PNP PNP
D.1

PNP/NUP

68
Affected Personnel -NUP NUP
AFFECTED
69
Nr Of Damaged PNP Building NR OF DAMAGED PNP BUILDING

URE
ESTIMATED COST OF DAMAGED PNP

70
Estimaged Cost Of Damaged PNP Building
BUILDING
D.2 DAMAGED
INFRASTRUCT

71
Nr Of Damaged PNP Equipment NR OF DAMAGED PNP EQUIPMENT
D.3

PNP

ESTIMATED COST OF DAMAGE TO PNP

72
Estimated Cost of Damaged PNP Equipment
DAMAGED

EQUIPMENT
EQUIPMENT

73
Casualties-PNP-Or-NUP-Dead DEAD

74
Casualties-PNP-Or-NUP-Injured INJURED
PNP OR NUP

75
Casualties-PNP-Or-NUP-Missing MISSING

76
Casualties-Civilian-Dead DEAD
D.4 CASUALTIES

77
Casualties-Civilian-Injured INJURED
CIVILIAN

78
Casualties-Civilian-Missing MISSING

79
Flooded Areas-Nr Of Affected Barangays NR OF AFFECTED BARANGAYS
D. POST DISASTER S

D.5 FLOODED AREAS


80
Flooded Areas-Nr Of Affected Families NR OF AFFECTED FAMILIES

81
Flooded Areas-Nr Of Affected Individuals NR OF AFFECTED INDIVIDUALS D.5 FLOODED AREAS

82
Landslide Incident-Nr Of Affected Barangays NR OF AFFECTED BARANGAYS

83
Landslide Incident-Nr Of Affected Families NR OF AFFECTED FAMILIES
INCENT

Landslide Incident-Nr Of Affected


D6. LANDSLIDE

84
NR OF AFFECTED INDIVIDUALS
Individuals

85
Nr Of Impassable Roads NR OF IMPASSABLE ROADS
D.7
D. POST DISASTER STAGE (AFTERMATH OR EFFECTS)

BRIDGES

86
Nr Of Impassable Bridges NR OF IMPASSABLE BRIDGES
AFFECTED
ROADS AND

NR OF BARANGAY WITHOUT

87
Nr Of Barangay Without Electricity
ELECTRICITY
Y
D.8.1

88
Nr Of Barangay Electricity Restored NR OF BARANGAY RESTORED

NR OF BARANGAY WITHOUT

89
Nr Of Barangay Without-Water
WATER

90
Nr Of Barangay Water Supply Restored NR OF BARANGAY RESTORED
ELECTRICIT D.8.2 WATER
COMMUNICATION LINES
D.8 AFFECTED POWER, WATER AND
NR OF BARANGAY WITHOUT

91
Nr Of Barangay Without Telco Signal

CATION LINES
TELCO (SIGNAL)

OWER, WATER AND

92
Nr of Barangay Telco Signal Restored NR OF BARANGAY RESTORED

D.8.3 TELCOM

93
Nr Of Cancelled Flights NR OF CANCELLED FLIGHTS

94
Nr Of Cancelled Ship Vogage NR OF CANCELLED SHIP VOGAGE
D.9

STATUS
SITUATION OR

95
Nr Of Cancelled Bus Voyage NR OF CANCELLED BUS VOYAGE/TRIP
TRANSPORTATION

96
Stranded Passengers-At Airport IN AIRPORTS

97
Stranded Passengers-At Seaport IN SEAPORTS
PASSENGERS
D.10 STRANDED

98
Stranded Passengers-At Terminal IN BUS TERMINALS
Date

Date

31-May-22
Time Of Report

Report
Time Of

9:00 AM PRO10
PRO/UNIT
PRO/UNIT

SUBUNIT/DPO/PPO/CPO
SUBUNIT/DPO/PPO/CPO

CPS/MPS
CPS/MPS

1
Total Strength TOTAL STRENGTH

2
Strength-Nr Of SRR Personnel NR OF SRR PERSONNEL
STRENGTH
A.1 PNP PERSONNEL
STRENGTH

3
Strength-Nr Of RSSF Personnel NR OF RSSF PERSONNEL

NP PERSONNEL

4
Social Media and Media Advisory-TV TV

5
Social Media and Media Advisory-Radio RADIO

6
Social Media and Media Advisory-Internet INTERNET
ADVISORY

7
Social Media and Media Advisory-Messages MESSAGES

8
Social Media and Media Advisory-Print PRINT
A.2 SOCIAL MEDIA AND SOCIAL

9
Directives and Meetings-Dispatched DIRECTIVE DISPATCHED
A.3

AND

Communication Or Other Activities COMMUNICATION/OTHER ACTIVITIES

10
MEETINGS

Conducted CONDUCTED
DIRECTIVES

11
SRR Equipment-Radios RADIOS

12
SRR Equipment-Satelite Phones SATELITE PHONES
A.4

EQUIPMENT

13
SRR Equipment-Others OTHERS
COMMUNICATION
14
SRR Equipment-PNP Blue Box PNP BLUE BOX

15
SRR Equipment-Life Vest LIFE VEST

16
SRR Equipment-Spine Board SPINE BOARD

17
SRR Equipment-Rescue Rope RESCUE ROPE

18
SRR Equipment-Rapelling Set RAPELLING SET

19
SRR Equipment-Floating Ring FLOATING RING

20
SRR Equipment-Megaphone MEGAPHONE

21
SRR Equipment-Chainsaw CHAINSAW
A.5 PNP OWNED SEARCH AND RESCUE ASSETS/EQUIPPAGE

22
SRR Equipment-Portable Generator PORTABLE GENERATOR

23
SRR Equipment-Utility Truck UTILITY TRUCK

24
SRR Equipment-Light Truck LIGHT TRUCK
PNP OWNED SEARCH, RESCUE, AND RETRIEVAL ASSETS/EQUIPPAGE

A.6 PNP OWNED MO


25
SRR Equipment-Ambulance AMBULANCE

TS/EQUIPPAGE

26
SRR Equipment-Motorized Banca MOTORIZED BANCA

SRR Equipment-Rubber boat withou RUBBER BOAT WITHOUT

27
Outboard Motor OUTBOARD MOTOR

28
SRR Equipment-Drum Boat DRUM BOAT
A.6 PNP OWNED MOBILITY ASSETS

29
SRR Equipment-Tactical Watercraft TACTICAL WATERCRAFT

RR Equipment-SAR Vehicle With Water SAR VEHICLE WITH WATER

30
Desalination Machine DESALINATION MACHINE

Nr Of PNP Personnel Deployed In NR OF DEPLOYED PNP PERSONNEL AT

31
Evacuation Center EVACUATON CENTERS

Nr Of PNP WCPD Personnel Deployed In NR OF DEPLOYED WCPD PERSONNEL

32
Evacuation Centers AT EVACUATION CENTER

Nr Of PNP Personnel Deployed In Vacated NR OF DEPLOYED PNP PERSONNEL AT

33
Areas VACATED AREAS

Nr Of PNP Personnel Deployed in Affected NR OF DEPLOYED PNP PERSONNEL AT

34
Areas AFFECTED AREAS

NR OF DEPLOYED PNP SRR PERSONNEL

35
Nr Of SRR Personnel Deployed
AT AFFECTED AREAS
B. DISASTER RESPONSES S

B.1 DEPLOYMENT OF PNP PERSONN


Nr Of PNP Personnel Deployed In Stranded NR OF DEPLOYED PNP

36
Areas-Airport PERSONNEL AT AIRPORT

Nr Of PNP Personnel Deployed In Stranded NR OF DEPLOYED PNP

37
Area-Seaport PERSONNEL AT SEAPORT

AREAS
NR OF DEPLOYED PNP
Nr Of PNP Personnel Deployed In Stranded

38
YMENT OF PNP PERSONNEL

PERSONNEL AT BUS
B.1.6 AT STRANDED
Area-Bus Terminal
TERMINAL
TOTAL NR OF DEPLOYED

39
Total Nr Of Personnel Deployed
PERSONNEL
B.1.7

TOTAL NR OF RSSF
TION OF

40
Nr Of RSSF Personnel
PERSONNEL
RECAPITULA

Nr Of Evacuation Center Established NR OF EVACUATION CENER

41
Established By LGU ESTABLISHED BY LGU
DISASTER RESPONSES STAGE (DURING THE TYPHOON)

NR OF EVACUATION

42
Nr Of Evacuation Centers Occupied
CENTERS OCCUPIED
CENTER

NR OF VACANT EVACUATION

43
Nr Of Vacant Evacuation Centers
CENTERS
NR OF EVACUATION
RELATED DATA

44
Nr Of Evacuess By Family BY FAMILY
B.2 EVACUATION CENTERS

NR OF

45
Nr Of Evacuess Individually PER INDIVIDUAL
EVACUESS

NUMBER OF RESCUE

46
Nr Of Rescue Operations Conducted
OPERATIONS CONDUCTED
RESCUE
OPERATIONS
C.1 RESPONSE OPERAT
NR OF RESCUED

RESCUE

47
Nr Of Rescued Individuals
INDIVIDUALS

NR OF RETRIEVAL

48
Nr Of Retrieval Operations Conducted
OPERATIONS CONDUCTED

NR OF RETRIEVED BODY OR

49
Nr Of Retrieved Body Or Cadaver
C.1 RESPONSE OPERATIONS

RETRIEVAL
CADAVER

NR OF RELIEF OPERATIONS OPERATIONS OPERATIONS

50
Nr Of Relief Operations Conducted
CONDUCTED
NR OF BENEFECIARIES
Nr Of Individuals As Relief Operations

51
(INDIVIDUALS) OF RELIEF
Beneficiaries
OPERATIONS
OPERATIONS
NR OF RELIEF

52
Total Estimated Amount TOTAL ESTIMATED AMOUNT

53
Nr Of Reported Looting Incidents NR OF REPORTED LOOTING INCIDENTS
C.2 RELIEF OPERATIONS (DURING)
ORDER

Nr Of Arrested Individuals Due To Looting NR OF ARRESTED INDIVIDUALS DUE TO

54
Incidents LOOTING INCIDENTS
C.3 LAW AND

NR OF ROAD CLEARING OPERATIONS

55
Nr Of Road Clearing Operations Conducted
CONDUCTED
C.4 ROAD
CLEARING
OPERATIONS

56
Nr Of Warehouse NR OF WAREHOUSES
S

Nr Of PNP Personnel Deployed As

57
Warehouse Security
C. RESPONSE OPERATIONS

WAREHOUSE

NR OF PNP PERSONNEL DEPLOYED


S
C.5 Security Operat
NR OF GROCERIES OR RATIONS

58
Nr Of Groceries Or Supermarket SUPERMARKETS

OR

ETS
Nr Of PNP Personnel Deployed As Groceries NR OF PNP PERSONNEL

59
DEPLOYED

GROCERIES
Or Supermarket Security

SUPERMARK

60
Nr Of Gas Station NR OF GAS STATIONS
Stations/Banks)

GAS
Nr Of PNP Personnel Deployed As Gas

61
Nr Of PNP Personnel Deployed
STATIONS
Station Security

62
Nr Of Banks NR OF BANKS
C.5 Security Operations(WarehouseS/Groceries/Gas

BANKS

63
Nr Of Personnel Deployed As Bank Security
NR OF PNP PERSONNEL DEPLOYED

64
Nr Of Donors NR OF DONORS

65
Nr Of Recipients Or Beneficiaries NR OF RECIPIENTS OR BENEFICIARIES
C.6 DONATIONS

66
Estimated Amount Of Donation ESTIMATED AMOUNT OF DONATION

67
Affected Personnel-PNP PNP
D.1

PNP/NUP

68
Affected Personnel -NUP NUP
AFFECTED
69
Nr Of Damaged PNP Building NR OF DAMAGED PNP BUILDING

URE
ESTIMATED COST OF DAMAGED PNP

70
Estimaged Cost Of Damaged PNP Building
BUILDING
D.2 DAMAGED
INFRASTRUCT

71
Nr Of Damaged PNP Equipment NR OF DAMAGED PNP EQUIPMENT
D.3

PNP

ESTIMATED COST OF DAMAGE TO PNP

72
Estimated Cost of Damaged PNP Equipment
DAMAGED

EQUIPMENT
EQUIPMENT

73
Casualties-PNP-Or-NUP-Dead DEAD

74
Casualties-PNP-Or-NUP-Injured INJURED
PNP OR NUP

75
Casualties-PNP-Or-NUP-Missing MISSING

76
Casualties-Civilian-Dead DEAD
D.4 CASUALTIES

77
Casualties-Civilian-Injured INJURED
CIVILIAN

78
Casualties-Civilian-Missing MISSING

79
Flooded Areas-Nr Of Affected Barangays NR OF AFFECTED BARANGAYS
D. POST DISASTER S

D.5 FLOODED AREAS


80
Flooded Areas-Nr Of Affected Families NR OF AFFECTED FAMILIES

81
Flooded Areas-Nr Of Affected Individuals NR OF AFFECTED INDIVIDUALS D.5 FLOODED AREAS

82
Landslide Incident-Nr Of Affected Barangays NR OF AFFECTED BARANGAYS

83
Landslide Incident-Nr Of Affected Families NR OF AFFECTED FAMILIES
INCENT

Landslide Incident-Nr Of Affected


D6. LANDSLIDE

84
NR OF AFFECTED INDIVIDUALS
Individuals

85
Nr Of Impassable Roads NR OF IMPASSABLE ROADS
D.7
D. POST DISASTER STAGE (AFTERMATH OR EFFECTS)

BRIDGES

86
Nr Of Impassable Bridges NR OF IMPASSABLE BRIDGES
AFFECTED
ROADS AND

NR OF BARANGAY WITHOUT

87
Nr Of Barangay Without Electricity
ELECTRICITY
Y
D.8.1

88
Nr Of Barangay Electricity Restored NR OF BARANGAY RESTORED

NR OF BARANGAY WITHOUT

89
Nr Of Barangay Without-Water
WATER

90
Nr Of Barangay Water Supply Restored NR OF BARANGAY RESTORED
ELECTRICIT D.8.2 WATER
COMMUNICATION LINES
D.8 AFFECTED POWER, WATER AND
NR OF BARANGAY WITHOUT

91
Nr Of Barangay Without Telco Signal

CATION LINES
TELCO (SIGNAL)

OWER, WATER AND

92
Nr of Barangay Telco Signal Restored NR OF BARANGAY RESTORED

D.8.3 TELCOM

93
Nr Of Cancelled Flights NR OF CANCELLED FLIGHTS

94
Nr Of Cancelled Ship Vogage NR OF CANCELLED SHIP VOGAGE
D.9

STATUS
SITUATION OR

95
Nr Of Cancelled Bus Voyage NR OF CANCELLED BUS VOYAGE/TRIP
TRANSPORTATION

96
Stranded Passengers-At Airport IN AIRPORTS

97
Stranded Passengers-At Seaport IN SEAPORTS
PASSENGERS
D.10 STRANDED

98
Stranded Passengers-At Terminal IN BUS TERMINALS
Date

Date

31-May-22
Time Of Report

Report
Time Of

9:00 AM PRO9
PRO/UNIT
PRO/UNIT

SUBUNIT/DPO/PPO/CPO
SUBUNIT/DPO/PPO/CPO

CPS/MPS
CPS/MPS

1
Total Strength TOTAL STRENGTH

2
Strength-Nr Of SRR Personnel NR OF SRR PERSONNEL
STRENGTH
A.1 PNP PERSONNEL
STRENGTH

3
Strength-Nr Of RSSF Personnel NR OF RSSF PERSONNEL

NP PERSONNEL

4
Social Media and Media Advisory-TV TV

5
Social Media and Media Advisory-Radio RADIO

6
Social Media and Media Advisory-Internet INTERNET
ADVISORY

7
Social Media and Media Advisory-Messages MESSAGES

8
Social Media and Media Advisory-Print PRINT
A.2 SOCIAL MEDIA AND SOCIAL

9
Directives and Meetings-Dispatched DIRECTIVE DISPATCHED
A.3

AND

Communication Or Other Activities COMMUNICATION/OTHER ACTIVITIES

10
MEETINGS

Conducted CONDUCTED
DIRECTIVES

11
SRR Equipment-Radios RADIOS

12
SRR Equipment-Satelite Phones SATELITE PHONES
A.4

EQUIPMENT

13
SRR Equipment-Others OTHERS
COMMUNICATION
14
SRR Equipment-PNP Blue Box PNP BLUE BOX

15
SRR Equipment-Life Vest LIFE VEST

16
SRR Equipment-Spine Board SPINE BOARD

17
SRR Equipment-Rescue Rope RESCUE ROPE

18
SRR Equipment-Rapelling Set RAPELLING SET

19
SRR Equipment-Floating Ring FLOATING RING

20
SRR Equipment-Megaphone MEGAPHONE

21
SRR Equipment-Chainsaw CHAINSAW
A.5 PNP OWNED SEARCH AND RESCUE ASSETS/EQUIPPAGE

22
SRR Equipment-Portable Generator PORTABLE GENERATOR

23
SRR Equipment-Utility Truck UTILITY TRUCK

24
SRR Equipment-Light Truck LIGHT TRUCK
PNP OWNED SEARCH, RESCUE, AND RETRIEVAL ASSETS/EQUIPPAGE

A.6 PNP OWNED MO


25
SRR Equipment-Ambulance AMBULANCE

TS/EQUIPPAGE

26
SRR Equipment-Motorized Banca MOTORIZED BANCA

SRR Equipment-Rubber boat withou RUBBER BOAT WITHOUT

27
Outboard Motor OUTBOARD MOTOR

28
SRR Equipment-Drum Boat DRUM BOAT
A.6 PNP OWNED MOBILITY ASSETS

29
SRR Equipment-Tactical Watercraft TACTICAL WATERCRAFT

RR Equipment-SAR Vehicle With Water SAR VEHICLE WITH WATER

30
Desalination Machine DESALINATION MACHINE

Nr Of PNP Personnel Deployed In NR OF DEPLOYED PNP PERSONNEL AT

31
Evacuation Center EVACUATON CENTERS

Nr Of PNP WCPD Personnel Deployed In NR OF DEPLOYED WCPD PERSONNEL

32
Evacuation Centers AT EVACUATION CENTER

Nr Of PNP Personnel Deployed In Vacated NR OF DEPLOYED PNP PERSONNEL AT

33
Areas VACATED AREAS

Nr Of PNP Personnel Deployed in Affected NR OF DEPLOYED PNP PERSONNEL AT

34
Areas AFFECTED AREAS

NR OF DEPLOYED PNP SRR PERSONNEL

35
Nr Of SRR Personnel Deployed
AT AFFECTED AREAS
B. DISASTER RESPONSES S

B.1 DEPLOYMENT OF PNP PERSONN


Nr Of PNP Personnel Deployed In Stranded NR OF DEPLOYED PNP

36
Areas-Airport PERSONNEL AT AIRPORT

Nr Of PNP Personnel Deployed In Stranded NR OF DEPLOYED PNP

37
Area-Seaport PERSONNEL AT SEAPORT

AREAS
NR OF DEPLOYED PNP
Nr Of PNP Personnel Deployed In Stranded

38
YMENT OF PNP PERSONNEL

PERSONNEL AT BUS
B.1.6 AT STRANDED
Area-Bus Terminal
TERMINAL
TOTAL NR OF DEPLOYED

39
Total Nr Of Personnel Deployed
PERSONNEL
B.1.7

TOTAL NR OF RSSF
TION OF

40
Nr Of RSSF Personnel
PERSONNEL
RECAPITULA

Nr Of Evacuation Center Established NR OF EVACUATION CENER

41
Established By LGU ESTABLISHED BY LGU
DISASTER RESPONSES STAGE (DURING THE TYPHOON)

NR OF EVACUATION

42
Nr Of Evacuation Centers Occupied
CENTERS OCCUPIED
CENTER

NR OF VACANT EVACUATION

43
Nr Of Vacant Evacuation Centers
CENTERS
NR OF EVACUATION
RELATED DATA

44
Nr Of Evacuess By Family BY FAMILY
B.2 EVACUATION CENTERS

NR OF

45
Nr Of Evacuess Individually PER INDIVIDUAL
EVACUESS

NUMBER OF RESCUE

46
Nr Of Rescue Operations Conducted
OPERATIONS CONDUCTED
RESCUE
OPERATIONS
C.1 RESPONSE OPERAT
NR OF RESCUED

RESCUE

47
Nr Of Rescued Individuals
INDIVIDUALS

NR OF RETRIEVAL

48
Nr Of Retrieval Operations Conducted
OPERATIONS CONDUCTED

NR OF RETRIEVED BODY OR

49
Nr Of Retrieved Body Or Cadaver
C.1 RESPONSE OPERATIONS

RETRIEVAL
CADAVER

NR OF RELIEF OPERATIONS OPERATIONS OPERATIONS

50
Nr Of Relief Operations Conducted
CONDUCTED
NR OF BENEFECIARIES
Nr Of Individuals As Relief Operations

51
(INDIVIDUALS) OF RELIEF
Beneficiaries
OPERATIONS
OPERATIONS
NR OF RELIEF

52
Total Estimated Amount TOTAL ESTIMATED AMOUNT

53
Nr Of Reported Looting Incidents NR OF REPORTED LOOTING INCIDENTS
C.2 RELIEF OPERATIONS (DURING)
ORDER

Nr Of Arrested Individuals Due To Looting NR OF ARRESTED INDIVIDUALS DUE TO

54
Incidents LOOTING INCIDENTS
C.3 LAW AND

NR OF ROAD CLEARING OPERATIONS

55
Nr Of Road Clearing Operations Conducted
CONDUCTED
C.4 ROAD
CLEARING
OPERATIONS

56
Nr Of Warehouse NR OF WAREHOUSES
S

Nr Of PNP Personnel Deployed As

57
Warehouse Security
C. RESPONSE OPERATIONS

WAREHOUSE

NR OF PNP PERSONNEL DEPLOYED


S
C.5 Security Operat
NR OF GROCERIES OR RATIONS

58
Nr Of Groceries Or Supermarket SUPERMARKETS

OR

ETS
Nr Of PNP Personnel Deployed As Groceries NR OF PNP PERSONNEL

59
DEPLOYED

GROCERIES
Or Supermarket Security

SUPERMARK

60
Nr Of Gas Station NR OF GAS STATIONS
Stations/Banks)

GAS
Nr Of PNP Personnel Deployed As Gas

61
Nr Of PNP Personnel Deployed
STATIONS
Station Security

62
Nr Of Banks NR OF BANKS
C.5 Security Operations(WarehouseS/Groceries/Gas

BANKS

63
Nr Of Personnel Deployed As Bank Security
NR OF PNP PERSONNEL DEPLOYED

64
Nr Of Donors NR OF DONORS

65
Nr Of Recipients Or Beneficiaries NR OF RECIPIENTS OR BENEFICIARIES
C.6 DONATIONS

66
Estimated Amount Of Donation ESTIMATED AMOUNT OF DONATION

67
Affected Personnel-PNP PNP
D.1

PNP/NUP

68
Affected Personnel -NUP NUP
AFFECTED
69
Nr Of Damaged PNP Building NR OF DAMAGED PNP BUILDING

URE
ESTIMATED COST OF DAMAGED PNP

70
Estimaged Cost Of Damaged PNP Building
BUILDING
D.2 DAMAGED
INFRASTRUCT

71
Nr Of Damaged PNP Equipment NR OF DAMAGED PNP EQUIPMENT
D.3

PNP

ESTIMATED COST OF DAMAGE TO PNP

72
Estimated Cost of Damaged PNP Equipment
DAMAGED

EQUIPMENT
EQUIPMENT

73
Casualties-PNP-Or-NUP-Dead DEAD

74
Casualties-PNP-Or-NUP-Injured INJURED
PNP OR NUP

75
Casualties-PNP-Or-NUP-Missing MISSING

76
Casualties-Civilian-Dead DEAD
D.4 CASUALTIES

77
Casualties-Civilian-Injured INJURED
CIVILIAN

78
Casualties-Civilian-Missing MISSING

79
Flooded Areas-Nr Of Affected Barangays NR OF AFFECTED BARANGAYS
D. POST DISASTER S

D.5 FLOODED AREAS


80
Flooded Areas-Nr Of Affected Families NR OF AFFECTED FAMILIES

81
Flooded Areas-Nr Of Affected Individuals NR OF AFFECTED INDIVIDUALS D.5 FLOODED AREAS

82
Landslide Incident-Nr Of Affected Barangays NR OF AFFECTED BARANGAYS

83
Landslide Incident-Nr Of Affected Families NR OF AFFECTED FAMILIES
INCENT

Landslide Incident-Nr Of Affected


D6. LANDSLIDE

84
NR OF AFFECTED INDIVIDUALS
Individuals

85
Nr Of Impassable Roads NR OF IMPASSABLE ROADS
D.7
D. POST DISASTER STAGE (AFTERMATH OR EFFECTS)

BRIDGES

86
Nr Of Impassable Bridges NR OF IMPASSABLE BRIDGES
AFFECTED
ROADS AND

NR OF BARANGAY WITHOUT

87
Nr Of Barangay Without Electricity
ELECTRICITY
Y
D.8.1

88
Nr Of Barangay Electricity Restored NR OF BARANGAY RESTORED

NR OF BARANGAY WITHOUT

89
Nr Of Barangay Without-Water
WATER

90
Nr Of Barangay Water Supply Restored NR OF BARANGAY RESTORED
ELECTRICIT D.8.2 WATER
COMMUNICATION LINES
D.8 AFFECTED POWER, WATER AND
NR OF BARANGAY WITHOUT

91
Nr Of Barangay Without Telco Signal

CATION LINES
TELCO (SIGNAL)

OWER, WATER AND

92
Nr of Barangay Telco Signal Restored NR OF BARANGAY RESTORED

D.8.3 TELCOM

93
Nr Of Cancelled Flights NR OF CANCELLED FLIGHTS

94
Nr Of Cancelled Ship Vogage NR OF CANCELLED SHIP VOGAGE
D.9

STATUS
SITUATION OR

95
Nr Of Cancelled Bus Voyage NR OF CANCELLED BUS VOYAGE/TRIP
TRANSPORTATION

96
Stranded Passengers-At Airport IN AIRPORTS

97
Stranded Passengers-At Seaport IN SEAPORTS
PASSENGERS
D.10 STRANDED

98
Stranded Passengers-At Terminal IN BUS TERMINALS
Date

Date

31-May-22
Time Of Report

Report
Time Of

9:00 AM PRO8
PRO/UNIT
PRO/UNIT

SUBUNIT/DPO/PPO/CPO
SUBUNIT/DPO/PPO/CPO

CPS/MPS
CPS/MPS

1
Total Strength TOTAL STRENGTH

2
Strength-Nr Of SRR Personnel NR OF SRR PERSONNEL
STRENGTH
A.1 PNP PERSONNEL
STRENGTH

3
Strength-Nr Of RSSF Personnel NR OF RSSF PERSONNEL

NP PERSONNEL

4
Social Media and Media Advisory-TV TV

5
Social Media and Media Advisory-Radio RADIO

6
Social Media and Media Advisory-Internet INTERNET
ADVISORY

7
Social Media and Media Advisory-Messages MESSAGES

8
Social Media and Media Advisory-Print PRINT
A.2 SOCIAL MEDIA AND SOCIAL

9
Directives and Meetings-Dispatched DIRECTIVE DISPATCHED
A.3

AND

Communication Or Other Activities COMMUNICATION/OTHER ACTIVITIES

10
MEETINGS

Conducted CONDUCTED
DIRECTIVES

11
SRR Equipment-Radios RADIOS

12
SRR Equipment-Satelite Phones SATELITE PHONES
A.4

EQUIPMENT

13
SRR Equipment-Others OTHERS
COMMUNICATION
14
SRR Equipment-PNP Blue Box PNP BLUE BOX

15
SRR Equipment-Life Vest LIFE VEST

16
SRR Equipment-Spine Board SPINE BOARD

17
SRR Equipment-Rescue Rope RESCUE ROPE

18
SRR Equipment-Rapelling Set RAPELLING SET

19
SRR Equipment-Floating Ring FLOATING RING

20
SRR Equipment-Megaphone MEGAPHONE

21
SRR Equipment-Chainsaw CHAINSAW
A.5 PNP OWNED SEARCH AND RESCUE ASSETS/EQUIPPAGE

22
SRR Equipment-Portable Generator PORTABLE GENERATOR

23
SRR Equipment-Utility Truck UTILITY TRUCK

24
SRR Equipment-Light Truck LIGHT TRUCK
PNP OWNED SEARCH, RESCUE, AND RETRIEVAL ASSETS/EQUIPPAGE

A.6 PNP OWNED MO


25
SRR Equipment-Ambulance AMBULANCE

TS/EQUIPPAGE

26
SRR Equipment-Motorized Banca MOTORIZED BANCA

SRR Equipment-Rubber boat withou RUBBER BOAT WITHOUT

27
Outboard Motor OUTBOARD MOTOR

28
SRR Equipment-Drum Boat DRUM BOAT
A.6 PNP OWNED MOBILITY ASSETS

29
SRR Equipment-Tactical Watercraft TACTICAL WATERCRAFT

RR Equipment-SAR Vehicle With Water SAR VEHICLE WITH WATER

30
Desalination Machine DESALINATION MACHINE

Nr Of PNP Personnel Deployed In NR OF DEPLOYED PNP PERSONNEL AT

31
Evacuation Center EVACUATON CENTERS

Nr Of PNP WCPD Personnel Deployed In NR OF DEPLOYED WCPD PERSONNEL

32
Evacuation Centers AT EVACUATION CENTER

Nr Of PNP Personnel Deployed In Vacated NR OF DEPLOYED PNP PERSONNEL AT

33
Areas VACATED AREAS

Nr Of PNP Personnel Deployed in Affected NR OF DEPLOYED PNP PERSONNEL AT

34
Areas AFFECTED AREAS

NR OF DEPLOYED PNP SRR PERSONNEL

35
Nr Of SRR Personnel Deployed
AT AFFECTED AREAS
B. DISASTER RESPONSES S

B.1 DEPLOYMENT OF PNP PERSONN


Nr Of PNP Personnel Deployed In Stranded NR OF DEPLOYED PNP

36
Areas-Airport PERSONNEL AT AIRPORT

Nr Of PNP Personnel Deployed In Stranded NR OF DEPLOYED PNP

37
Area-Seaport PERSONNEL AT SEAPORT

AREAS
NR OF DEPLOYED PNP
Nr Of PNP Personnel Deployed In Stranded

38
YMENT OF PNP PERSONNEL

PERSONNEL AT BUS
B.1.6 AT STRANDED
Area-Bus Terminal
TERMINAL
TOTAL NR OF DEPLOYED

39
Total Nr Of Personnel Deployed
PERSONNEL
B.1.7

TOTAL NR OF RSSF
TION OF

40
Nr Of RSSF Personnel
PERSONNEL
RECAPITULA

Nr Of Evacuation Center Established NR OF EVACUATION CENER

41
Established By LGU ESTABLISHED BY LGU
DISASTER RESPONSES STAGE (DURING THE TYPHOON)

NR OF EVACUATION

42
Nr Of Evacuation Centers Occupied
CENTERS OCCUPIED
CENTER

NR OF VACANT EVACUATION

43
Nr Of Vacant Evacuation Centers
CENTERS
NR OF EVACUATION
RELATED DATA

44
Nr Of Evacuess By Family BY FAMILY
B.2 EVACUATION CENTERS

NR OF

45
Nr Of Evacuess Individually PER INDIVIDUAL
EVACUESS

NUMBER OF RESCUE

46
Nr Of Rescue Operations Conducted
OPERATIONS CONDUCTED
RESCUE
OPERATIONS
C.1 RESPONSE OPERAT
NR OF RESCUED

RESCUE

47
Nr Of Rescued Individuals
INDIVIDUALS

NR OF RETRIEVAL

48
Nr Of Retrieval Operations Conducted
OPERATIONS CONDUCTED

NR OF RETRIEVED BODY OR

49
Nr Of Retrieved Body Or Cadaver
C.1 RESPONSE OPERATIONS

RETRIEVAL
CADAVER

NR OF RELIEF OPERATIONS OPERATIONS OPERATIONS

50
Nr Of Relief Operations Conducted
CONDUCTED
NR OF BENEFECIARIES
Nr Of Individuals As Relief Operations

51
(INDIVIDUALS) OF RELIEF
Beneficiaries
OPERATIONS
OPERATIONS
NR OF RELIEF

52
Total Estimated Amount TOTAL ESTIMATED AMOUNT

53
Nr Of Reported Looting Incidents NR OF REPORTED LOOTING INCIDENTS
C.2 RELIEF OPERATIONS (DURING)
ORDER

Nr Of Arrested Individuals Due To Looting NR OF ARRESTED INDIVIDUALS DUE TO

54
Incidents LOOTING INCIDENTS
C.3 LAW AND

NR OF ROAD CLEARING OPERATIONS

55
Nr Of Road Clearing Operations Conducted
CONDUCTED
C.4 ROAD
CLEARING
OPERATIONS

56
Nr Of Warehouse NR OF WAREHOUSES
S

Nr Of PNP Personnel Deployed As

57
Warehouse Security
C. RESPONSE OPERATIONS

WAREHOUSE

NR OF PNP PERSONNEL DEPLOYED


S
C.5 Security Operat
NR OF GROCERIES OR RATIONS

58
Nr Of Groceries Or Supermarket SUPERMARKETS

OR

ETS
Nr Of PNP Personnel Deployed As Groceries NR OF PNP PERSONNEL

59
DEPLOYED

GROCERIES
Or Supermarket Security

SUPERMARK

60
Nr Of Gas Station NR OF GAS STATIONS
Stations/Banks)

GAS
Nr Of PNP Personnel Deployed As Gas

61
Nr Of PNP Personnel Deployed
STATIONS
Station Security

62
Nr Of Banks NR OF BANKS
C.5 Security Operations(WarehouseS/Groceries/Gas

BANKS

63
Nr Of Personnel Deployed As Bank Security
NR OF PNP PERSONNEL DEPLOYED

64
Nr Of Donors NR OF DONORS

65
Nr Of Recipients Or Beneficiaries NR OF RECIPIENTS OR BENEFICIARIES
C.6 DONATIONS

66
Estimated Amount Of Donation ESTIMATED AMOUNT OF DONATION

67
Affected Personnel-PNP PNP
D.1

PNP/NUP

68
Affected Personnel -NUP NUP
AFFECTED
69
Nr Of Damaged PNP Building NR OF DAMAGED PNP BUILDING

URE
ESTIMATED COST OF DAMAGED PNP

70
Estimaged Cost Of Damaged PNP Building
BUILDING
D.2 DAMAGED
INFRASTRUCT

71
Nr Of Damaged PNP Equipment NR OF DAMAGED PNP EQUIPMENT
D.3

PNP

ESTIMATED COST OF DAMAGE TO PNP

72
Estimated Cost of Damaged PNP Equipment
DAMAGED

EQUIPMENT
EQUIPMENT

73
Casualties-PNP-Or-NUP-Dead DEAD

74
Casualties-PNP-Or-NUP-Injured INJURED
PNP OR NUP

75
Casualties-PNP-Or-NUP-Missing MISSING

76
Casualties-Civilian-Dead DEAD
D.4 CASUALTIES

77
Casualties-Civilian-Injured INJURED
CIVILIAN

78
Casualties-Civilian-Missing MISSING

79
Flooded Areas-Nr Of Affected Barangays NR OF AFFECTED BARANGAYS
D. POST DISASTER S

D.5 FLOODED AREAS


80
Flooded Areas-Nr Of Affected Families NR OF AFFECTED FAMILIES

81
Flooded Areas-Nr Of Affected Individuals NR OF AFFECTED INDIVIDUALS D.5 FLOODED AREAS

82
Landslide Incident-Nr Of Affected Barangays NR OF AFFECTED BARANGAYS

83
Landslide Incident-Nr Of Affected Families NR OF AFFECTED FAMILIES
INCENT

Landslide Incident-Nr Of Affected


D6. LANDSLIDE

84
NR OF AFFECTED INDIVIDUALS
Individuals

85
Nr Of Impassable Roads NR OF IMPASSABLE ROADS
D.7
D. POST DISASTER STAGE (AFTERMATH OR EFFECTS)

BRIDGES

86
Nr Of Impassable Bridges NR OF IMPASSABLE BRIDGES
AFFECTED
ROADS AND

NR OF BARANGAY WITHOUT

87
Nr Of Barangay Without Electricity
ELECTRICITY
Y
D.8.1

88
Nr Of Barangay Electricity Restored NR OF BARANGAY RESTORED

NR OF BARANGAY WITHOUT

89
Nr Of Barangay Without-Water
WATER

90
Nr Of Barangay Water Supply Restored NR OF BARANGAY RESTORED
ELECTRICIT D.8.2 WATER
COMMUNICATION LINES
D.8 AFFECTED POWER, WATER AND
NR OF BARANGAY WITHOUT

91
Nr Of Barangay Without Telco Signal

CATION LINES
TELCO (SIGNAL)

OWER, WATER AND

92
Nr of Barangay Telco Signal Restored NR OF BARANGAY RESTORED

D.8.3 TELCOM

93
Nr Of Cancelled Flights NR OF CANCELLED FLIGHTS

94
Nr Of Cancelled Ship Vogage NR OF CANCELLED SHIP VOGAGE
D.9

STATUS
SITUATION OR

95
Nr Of Cancelled Bus Voyage NR OF CANCELLED BUS VOYAGE/TRIP
TRANSPORTATION

96
Stranded Passengers-At Airport IN AIRPORTS

97
Stranded Passengers-At Seaport IN SEAPORTS
PASSENGERS
D.10 STRANDED

98
Stranded Passengers-At Terminal IN BUS TERMINALS
Date

Date

31-May-22
Time Of Report

Report
Time Of

9:00 AM PRO7
PRO/UNIT
PRO/UNIT

SUBUNIT/DPO/PPO/CPO
SUBUNIT/DPO/PPO/CPO

CPS/MPS
CPS/MPS

1
Total Strength TOTAL STRENGTH

2
Strength-Nr Of SRR Personnel NR OF SRR PERSONNEL
STRENGTH
A.1 PNP PERSONNEL
STRENGTH

3
Strength-Nr Of RSSF Personnel NR OF RSSF PERSONNEL

NP PERSONNEL

4
Social Media and Media Advisory-TV TV

5
Social Media and Media Advisory-Radio RADIO

6
Social Media and Media Advisory-Internet INTERNET
ADVISORY

7
Social Media and Media Advisory-Messages MESSAGES

8
Social Media and Media Advisory-Print PRINT
A.2 SOCIAL MEDIA AND SOCIAL

9
Directives and Meetings-Dispatched DIRECTIVE DISPATCHED
A.3

AND

Communication Or Other Activities COMMUNICATION/OTHER ACTIVITIES

10
MEETINGS

Conducted CONDUCTED
DIRECTIVES

11
SRR Equipment-Radios RADIOS

12
SRR Equipment-Satelite Phones SATELITE PHONES
A.4

EQUIPMENT

13
SRR Equipment-Others OTHERS
COMMUNICATION
14
SRR Equipment-PNP Blue Box PNP BLUE BOX

15
SRR Equipment-Life Vest LIFE VEST

16
SRR Equipment-Spine Board SPINE BOARD

17
SRR Equipment-Rescue Rope RESCUE ROPE

18
SRR Equipment-Rapelling Set RAPELLING SET

19
SRR Equipment-Floating Ring FLOATING RING

20
SRR Equipment-Megaphone MEGAPHONE

21
SRR Equipment-Chainsaw CHAINSAW
A.5 PNP OWNED SEARCH AND RESCUE ASSETS/EQUIPPAGE

22
SRR Equipment-Portable Generator PORTABLE GENERATOR

23
SRR Equipment-Utility Truck UTILITY TRUCK

24
SRR Equipment-Light Truck LIGHT TRUCK
PNP OWNED SEARCH, RESCUE, AND RETRIEVAL ASSETS/EQUIPPAGE

A.6 PNP OWNED MO


25
SRR Equipment-Ambulance AMBULANCE

TS/EQUIPPAGE

26
SRR Equipment-Motorized Banca MOTORIZED BANCA

SRR Equipment-Rubber boat withou RUBBER BOAT WITHOUT

27
Outboard Motor OUTBOARD MOTOR

28
SRR Equipment-Drum Boat DRUM BOAT
A.6 PNP OWNED MOBILITY ASSETS

29
SRR Equipment-Tactical Watercraft TACTICAL WATERCRAFT

RR Equipment-SAR Vehicle With Water SAR VEHICLE WITH WATER

30
Desalination Machine DESALINATION MACHINE

Nr Of PNP Personnel Deployed In NR OF DEPLOYED PNP PERSONNEL AT

31
Evacuation Center EVACUATON CENTERS

Nr Of PNP WCPD Personnel Deployed In NR OF DEPLOYED WCPD PERSONNEL

32
Evacuation Centers AT EVACUATION CENTER

Nr Of PNP Personnel Deployed In Vacated NR OF DEPLOYED PNP PERSONNEL AT

33
Areas VACATED AREAS

Nr Of PNP Personnel Deployed in Affected NR OF DEPLOYED PNP PERSONNEL AT

34
Areas AFFECTED AREAS

NR OF DEPLOYED PNP SRR PERSONNEL

35
Nr Of SRR Personnel Deployed
AT AFFECTED AREAS
B. DISASTER RESPONSES S

B.1 DEPLOYMENT OF PNP PERSONN


Nr Of PNP Personnel Deployed In Stranded NR OF DEPLOYED PNP

36
Areas-Airport PERSONNEL AT AIRPORT

Nr Of PNP Personnel Deployed In Stranded NR OF DEPLOYED PNP

37
Area-Seaport PERSONNEL AT SEAPORT

AREAS
NR OF DEPLOYED PNP
Nr Of PNP Personnel Deployed In Stranded

38
YMENT OF PNP PERSONNEL

PERSONNEL AT BUS
B.1.6 AT STRANDED
Area-Bus Terminal
TERMINAL
TOTAL NR OF DEPLOYED

39
Total Nr Of Personnel Deployed
PERSONNEL
B.1.7

TOTAL NR OF RSSF
TION OF

40
Nr Of RSSF Personnel
PERSONNEL
RECAPITULA

Nr Of Evacuation Center Established NR OF EVACUATION CENER

41
Established By LGU ESTABLISHED BY LGU
DISASTER RESPONSES STAGE (DURING THE TYPHOON)

NR OF EVACUATION

42
Nr Of Evacuation Centers Occupied
CENTERS OCCUPIED
CENTER

NR OF VACANT EVACUATION

43
Nr Of Vacant Evacuation Centers
CENTERS
NR OF EVACUATION
RELATED DATA

44
Nr Of Evacuess By Family BY FAMILY
B.2 EVACUATION CENTERS

NR OF

45
Nr Of Evacuess Individually PER INDIVIDUAL
EVACUESS

NUMBER OF RESCUE

46
Nr Of Rescue Operations Conducted
OPERATIONS CONDUCTED
RESCUE
OPERATIONS
C.1 RESPONSE OPERAT
NR OF RESCUED

RESCUE

47
Nr Of Rescued Individuals
INDIVIDUALS

NR OF RETRIEVAL

48
Nr Of Retrieval Operations Conducted
OPERATIONS CONDUCTED

NR OF RETRIEVED BODY OR

49
Nr Of Retrieved Body Or Cadaver
C.1 RESPONSE OPERATIONS

RETRIEVAL
CADAVER

NR OF RELIEF OPERATIONS OPERATIONS OPERATIONS

50
Nr Of Relief Operations Conducted
CONDUCTED
NR OF BENEFECIARIES
Nr Of Individuals As Relief Operations

51
(INDIVIDUALS) OF RELIEF
Beneficiaries
OPERATIONS
OPERATIONS
NR OF RELIEF

52
Total Estimated Amount TOTAL ESTIMATED AMOUNT

53
Nr Of Reported Looting Incidents NR OF REPORTED LOOTING INCIDENTS
C.2 RELIEF OPERATIONS (DURING)
ORDER

Nr Of Arrested Individuals Due To Looting NR OF ARRESTED INDIVIDUALS DUE TO

54
Incidents LOOTING INCIDENTS
C.3 LAW AND

NR OF ROAD CLEARING OPERATIONS

55
Nr Of Road Clearing Operations Conducted
CONDUCTED
C.4 ROAD
CLEARING
OPERATIONS

56
Nr Of Warehouse NR OF WAREHOUSES
S

Nr Of PNP Personnel Deployed As

57
Warehouse Security
C. RESPONSE OPERATIONS

WAREHOUSE

NR OF PNP PERSONNEL DEPLOYED


S
C.5 Security Operat
NR OF GROCERIES OR RATIONS

58
Nr Of Groceries Or Supermarket SUPERMARKETS

OR

ETS
Nr Of PNP Personnel Deployed As Groceries NR OF PNP PERSONNEL

59
DEPLOYED

GROCERIES
Or Supermarket Security

SUPERMARK

60
Nr Of Gas Station NR OF GAS STATIONS
Stations/Banks)

GAS
Nr Of PNP Personnel Deployed As Gas

61
Nr Of PNP Personnel Deployed
STATIONS
Station Security

62
Nr Of Banks NR OF BANKS
C.5 Security Operations(WarehouseS/Groceries/Gas

BANKS

63
Nr Of Personnel Deployed As Bank Security
NR OF PNP PERSONNEL DEPLOYED

64
Nr Of Donors NR OF DONORS

65
Nr Of Recipients Or Beneficiaries NR OF RECIPIENTS OR BENEFICIARIES
C.6 DONATIONS

66
Estimated Amount Of Donation ESTIMATED AMOUNT OF DONATION

67
Affected Personnel-PNP PNP
D.1

PNP/NUP

68
Affected Personnel -NUP NUP
AFFECTED
69
Nr Of Damaged PNP Building NR OF DAMAGED PNP BUILDING

URE
ESTIMATED COST OF DAMAGED PNP

70
Estimaged Cost Of Damaged PNP Building
BUILDING
D.2 DAMAGED
INFRASTRUCT

71
Nr Of Damaged PNP Equipment NR OF DAMAGED PNP EQUIPMENT
D.3

PNP

ESTIMATED COST OF DAMAGE TO PNP

72
Estimated Cost of Damaged PNP Equipment
DAMAGED

EQUIPMENT
EQUIPMENT

73
Casualties-PNP-Or-NUP-Dead DEAD

74
Casualties-PNP-Or-NUP-Injured INJURED
PNP OR NUP

75
Casualties-PNP-Or-NUP-Missing MISSING

76
Casualties-Civilian-Dead DEAD
D.4 CASUALTIES

77
Casualties-Civilian-Injured INJURED
CIVILIAN

78
Casualties-Civilian-Missing MISSING

79
Flooded Areas-Nr Of Affected Barangays NR OF AFFECTED BARANGAYS
D. POST DISASTER S

D.5 FLOODED AREAS


80
Flooded Areas-Nr Of Affected Families NR OF AFFECTED FAMILIES

81
Flooded Areas-Nr Of Affected Individuals NR OF AFFECTED INDIVIDUALS D.5 FLOODED AREAS

82
Landslide Incident-Nr Of Affected Barangays NR OF AFFECTED BARANGAYS

83
Landslide Incident-Nr Of Affected Families NR OF AFFECTED FAMILIES
INCENT

Landslide Incident-Nr Of Affected


D6. LANDSLIDE

84
NR OF AFFECTED INDIVIDUALS
Individuals

85
Nr Of Impassable Roads NR OF IMPASSABLE ROADS
D.7
D. POST DISASTER STAGE (AFTERMATH OR EFFECTS)

BRIDGES

86
Nr Of Impassable Bridges NR OF IMPASSABLE BRIDGES
AFFECTED
ROADS AND

NR OF BARANGAY WITHOUT

87
Nr Of Barangay Without Electricity
ELECTRICITY
Y
D.8.1

88
Nr Of Barangay Electricity Restored NR OF BARANGAY RESTORED

NR OF BARANGAY WITHOUT

89
Nr Of Barangay Without-Water
WATER

90
Nr Of Barangay Water Supply Restored NR OF BARANGAY RESTORED
ELECTRICIT D.8.2 WATER
COMMUNICATION LINES
D.8 AFFECTED POWER, WATER AND
NR OF BARANGAY WITHOUT

91
Nr Of Barangay Without Telco Signal

CATION LINES
TELCO (SIGNAL)

OWER, WATER AND

92
Nr of Barangay Telco Signal Restored NR OF BARANGAY RESTORED

D.8.3 TELCOM

93
Nr Of Cancelled Flights NR OF CANCELLED FLIGHTS

94
Nr Of Cancelled Ship Vogage NR OF CANCELLED SHIP VOGAGE
D.9

STATUS
SITUATION OR

95
Nr Of Cancelled Bus Voyage NR OF CANCELLED BUS VOYAGE/TRIP
TRANSPORTATION

96
Stranded Passengers-At Airport IN AIRPORTS

97
Stranded Passengers-At Seaport IN SEAPORTS
PASSENGERS
D.10 STRANDED

98
Stranded Passengers-At Terminal IN BUS TERMINALS
Date

Date

31-May-22
Time Of Report

Report
Time Of

9:00 AM PRO6
PRO/UNIT
PRO/UNIT

SUBUNIT/DPO/PPO/CPO
SUBUNIT/DPO/PPO/CPO

CPS/MPS
CPS/MPS

1
Total Strength TOTAL STRENGTH

2
Strength-Nr Of SRR Personnel NR OF SRR PERSONNEL
STRENGTH
A.1 PNP PERSONNEL
STRENGTH

3
Strength-Nr Of RSSF Personnel NR OF RSSF PERSONNEL

NP PERSONNEL

4
Social Media and Media Advisory-TV TV

5
Social Media and Media Advisory-Radio RADIO

6
Social Media and Media Advisory-Internet INTERNET
ADVISORY

7
Social Media and Media Advisory-Messages MESSAGES

8
Social Media and Media Advisory-Print PRINT
A.2 SOCIAL MEDIA AND SOCIAL

9
Directives and Meetings-Dispatched DIRECTIVE DISPATCHED
A.3

AND

Communication Or Other Activities COMMUNICATION/OTHER ACTIVITIES

10
MEETINGS

Conducted CONDUCTED
DIRECTIVES

11
SRR Equipment-Radios RADIOS

12
SRR Equipment-Satelite Phones SATELITE PHONES
A.4

EQUIPMENT

13
SRR Equipment-Others OTHERS
COMMUNICATION
14
SRR Equipment-PNP Blue Box PNP BLUE BOX

15
SRR Equipment-Life Vest LIFE VEST

16
SRR Equipment-Spine Board SPINE BOARD

17
SRR Equipment-Rescue Rope RESCUE ROPE

18
SRR Equipment-Rapelling Set RAPELLING SET

19
SRR Equipment-Floating Ring FLOATING RING

20
SRR Equipment-Megaphone MEGAPHONE

21
SRR Equipment-Chainsaw CHAINSAW
A.5 PNP OWNED SEARCH AND RESCUE ASSETS/EQUIPPAGE

22
SRR Equipment-Portable Generator PORTABLE GENERATOR

23
SRR Equipment-Utility Truck UTILITY TRUCK

24
SRR Equipment-Light Truck LIGHT TRUCK
PNP OWNED SEARCH, RESCUE, AND RETRIEVAL ASSETS/EQUIPPAGE

A.6 PNP OWNED MO


25
SRR Equipment-Ambulance AMBULANCE

TS/EQUIPPAGE

26
SRR Equipment-Motorized Banca MOTORIZED BANCA

SRR Equipment-Rubber boat withou RUBBER BOAT WITHOUT

27
Outboard Motor OUTBOARD MOTOR

28
SRR Equipment-Drum Boat DRUM BOAT
A.6 PNP OWNED MOBILITY ASSETS

29
SRR Equipment-Tactical Watercraft TACTICAL WATERCRAFT

RR Equipment-SAR Vehicle With Water SAR VEHICLE WITH WATER

30
Desalination Machine DESALINATION MACHINE

Nr Of PNP Personnel Deployed In NR OF DEPLOYED PNP PERSONNEL AT

31
Evacuation Center EVACUATON CENTERS

Nr Of PNP WCPD Personnel Deployed In NR OF DEPLOYED WCPD PERSONNEL

32
Evacuation Centers AT EVACUATION CENTER

Nr Of PNP Personnel Deployed In Vacated NR OF DEPLOYED PNP PERSONNEL AT

33
Areas VACATED AREAS

Nr Of PNP Personnel Deployed in Affected NR OF DEPLOYED PNP PERSONNEL AT

34
Areas AFFECTED AREAS

NR OF DEPLOYED PNP SRR PERSONNEL

35
Nr Of SRR Personnel Deployed
AT AFFECTED AREAS
B. DISASTER RESPONSES S

B.1 DEPLOYMENT OF PNP PERSONN


Nr Of PNP Personnel Deployed In Stranded NR OF DEPLOYED PNP

36
Areas-Airport PERSONNEL AT AIRPORT

Nr Of PNP Personnel Deployed In Stranded NR OF DEPLOYED PNP

37
Area-Seaport PERSONNEL AT SEAPORT

AREAS
NR OF DEPLOYED PNP
Nr Of PNP Personnel Deployed In Stranded

38
YMENT OF PNP PERSONNEL

PERSONNEL AT BUS
B.1.6 AT STRANDED
Area-Bus Terminal
TERMINAL
TOTAL NR OF DEPLOYED

39
Total Nr Of Personnel Deployed
PERSONNEL
B.1.7

TOTAL NR OF RSSF
TION OF

40
Nr Of RSSF Personnel
PERSONNEL
RECAPITULA

Nr Of Evacuation Center Established NR OF EVACUATION CENER

41
Established By LGU ESTABLISHED BY LGU
DISASTER RESPONSES STAGE (DURING THE TYPHOON)

NR OF EVACUATION

42
Nr Of Evacuation Centers Occupied
CENTERS OCCUPIED
CENTER

NR OF VACANT EVACUATION

43
Nr Of Vacant Evacuation Centers
CENTERS
NR OF EVACUATION
RELATED DATA

44
Nr Of Evacuess By Family BY FAMILY
B.2 EVACUATION CENTERS

NR OF

45
Nr Of Evacuess Individually PER INDIVIDUAL
EVACUESS

NUMBER OF RESCUE

46
Nr Of Rescue Operations Conducted
OPERATIONS CONDUCTED
RESCUE
OPERATIONS
C.1 RESPONSE OPERAT
NR OF RESCUED

RESCUE

47
Nr Of Rescued Individuals
INDIVIDUALS

NR OF RETRIEVAL

48
Nr Of Retrieval Operations Conducted
OPERATIONS CONDUCTED

NR OF RETRIEVED BODY OR

49
Nr Of Retrieved Body Or Cadaver
C.1 RESPONSE OPERATIONS

RETRIEVAL
CADAVER

NR OF RELIEF OPERATIONS OPERATIONS OPERATIONS

50
Nr Of Relief Operations Conducted
CONDUCTED
NR OF BENEFECIARIES
Nr Of Individuals As Relief Operations

51
(INDIVIDUALS) OF RELIEF
Beneficiaries
OPERATIONS
OPERATIONS
NR OF RELIEF

52
Total Estimated Amount TOTAL ESTIMATED AMOUNT

53
Nr Of Reported Looting Incidents NR OF REPORTED LOOTING INCIDENTS
C.2 RELIEF OPERATIONS (DURING)
ORDER

Nr Of Arrested Individuals Due To Looting NR OF ARRESTED INDIVIDUALS DUE TO

54
Incidents LOOTING INCIDENTS
C.3 LAW AND

NR OF ROAD CLEARING OPERATIONS

55
Nr Of Road Clearing Operations Conducted
CONDUCTED
C.4 ROAD
CLEARING
OPERATIONS

56
Nr Of Warehouse NR OF WAREHOUSES
S

Nr Of PNP Personnel Deployed As

57
Warehouse Security
C. RESPONSE OPERATIONS

WAREHOUSE

NR OF PNP PERSONNEL DEPLOYED


S
C.5 Security Operat
NR OF GROCERIES OR RATIONS

58
Nr Of Groceries Or Supermarket SUPERMARKETS

OR

ETS
Nr Of PNP Personnel Deployed As Groceries NR OF PNP PERSONNEL

59
DEPLOYED

GROCERIES
Or Supermarket Security

SUPERMARK

60
Nr Of Gas Station NR OF GAS STATIONS
Stations/Banks)

GAS
Nr Of PNP Personnel Deployed As Gas

61
Nr Of PNP Personnel Deployed
STATIONS
Station Security

62
Nr Of Banks NR OF BANKS
C.5 Security Operations(WarehouseS/Groceries/Gas

BANKS

63
Nr Of Personnel Deployed As Bank Security
NR OF PNP PERSONNEL DEPLOYED

64
Nr Of Donors NR OF DONORS

65
Nr Of Recipients Or Beneficiaries NR OF RECIPIENTS OR BENEFICIARIES
C.6 DONATIONS

66
Estimated Amount Of Donation ESTIMATED AMOUNT OF DONATION

67
Affected Personnel-PNP PNP
D.1

PNP/NUP

68
Affected Personnel -NUP NUP
AFFECTED
69
Nr Of Damaged PNP Building NR OF DAMAGED PNP BUILDING

URE
ESTIMATED COST OF DAMAGED PNP

70
Estimaged Cost Of Damaged PNP Building
BUILDING
D.2 DAMAGED
INFRASTRUCT

71
Nr Of Damaged PNP Equipment NR OF DAMAGED PNP EQUIPMENT
D.3

PNP

ESTIMATED COST OF DAMAGE TO PNP

72
Estimated Cost of Damaged PNP Equipment
DAMAGED

EQUIPMENT
EQUIPMENT

73
Casualties-PNP-Or-NUP-Dead DEAD

74
Casualties-PNP-Or-NUP-Injured INJURED
PNP OR NUP

75
Casualties-PNP-Or-NUP-Missing MISSING

76
Casualties-Civilian-Dead DEAD
D.4 CASUALTIES

77
Casualties-Civilian-Injured INJURED
CIVILIAN

78
Casualties-Civilian-Missing MISSING

79
Flooded Areas-Nr Of Affected Barangays NR OF AFFECTED BARANGAYS
D. POST DISASTER S

D.5 FLOODED AREAS


80
Flooded Areas-Nr Of Affected Families NR OF AFFECTED FAMILIES

81
Flooded Areas-Nr Of Affected Individuals NR OF AFFECTED INDIVIDUALS D.5 FLOODED AREAS

82
Landslide Incident-Nr Of Affected Barangays NR OF AFFECTED BARANGAYS

83
Landslide Incident-Nr Of Affected Families NR OF AFFECTED FAMILIES
INCENT

Landslide Incident-Nr Of Affected


D6. LANDSLIDE

84
NR OF AFFECTED INDIVIDUALS
Individuals

85
Nr Of Impassable Roads NR OF IMPASSABLE ROADS
D.7
D. POST DISASTER STAGE (AFTERMATH OR EFFECTS)

BRIDGES

86
Nr Of Impassable Bridges NR OF IMPASSABLE BRIDGES
AFFECTED
ROADS AND

NR OF BARANGAY WITHOUT

87
Nr Of Barangay Without Electricity
ELECTRICITY
Y
D.8.1

88
Nr Of Barangay Electricity Restored NR OF BARANGAY RESTORED

NR OF BARANGAY WITHOUT

89
Nr Of Barangay Without-Water
WATER

90
Nr Of Barangay Water Supply Restored NR OF BARANGAY RESTORED
ELECTRICIT D.8.2 WATER
COMMUNICATION LINES
D.8 AFFECTED POWER, WATER AND
NR OF BARANGAY WITHOUT

91
Nr Of Barangay Without Telco Signal

CATION LINES
TELCO (SIGNAL)

OWER, WATER AND

92
Nr of Barangay Telco Signal Restored NR OF BARANGAY RESTORED

D.8.3 TELCOM

93
Nr Of Cancelled Flights NR OF CANCELLED FLIGHTS

94
Nr Of Cancelled Ship Vogage NR OF CANCELLED SHIP VOGAGE
D.9

STATUS
SITUATION OR

95
Nr Of Cancelled Bus Voyage NR OF CANCELLED BUS VOYAGE/TRIP
TRANSPORTATION

96
Stranded Passengers-At Airport IN AIRPORTS

97
Stranded Passengers-At Seaport IN SEAPORTS
PASSENGERS
D.10 STRANDED

98
Stranded Passengers-At Terminal IN BUS TERMINALS
Date

Date

31-May-22
Time Of Report

Report
Time Of

9:00 AM PRO5
PRO/UNIT
PRO/UNIT

SUBUNIT/DPO/PPO/CPO
SUBUNIT/DPO/PPO/CPO

CPS/MPS
CPS/MPS

1
Total Strength TOTAL STRENGTH

2
Strength-Nr Of SRR Personnel NR OF SRR PERSONNEL
STRENGTH
A.1 PNP PERSONNEL
STRENGTH

3
Strength-Nr Of RSSF Personnel NR OF RSSF PERSONNEL

NP PERSONNEL

4
Social Media and Media Advisory-TV TV

5
Social Media and Media Advisory-Radio RADIO

6
Social Media and Media Advisory-Internet INTERNET
ADVISORY

7
Social Media and Media Advisory-Messages MESSAGES

8
Social Media and Media Advisory-Print PRINT
A.2 SOCIAL MEDIA AND SOCIAL

9
Directives and Meetings-Dispatched DIRECTIVE DISPATCHED
A.3

AND

Communication Or Other Activities COMMUNICATION/OTHER ACTIVITIES

10
MEETINGS

Conducted CONDUCTED
DIRECTIVES

11
SRR Equipment-Radios RADIOS

12
SRR Equipment-Satelite Phones SATELITE PHONES
A.4

EQUIPMENT

13
SRR Equipment-Others OTHERS
COMMUNICATION
14
SRR Equipment-PNP Blue Box PNP BLUE BOX

15
SRR Equipment-Life Vest LIFE VEST

16
SRR Equipment-Spine Board SPINE BOARD

17
SRR Equipment-Rescue Rope RESCUE ROPE

18
SRR Equipment-Rapelling Set RAPELLING SET

19
SRR Equipment-Floating Ring FLOATING RING

20
SRR Equipment-Megaphone MEGAPHONE

21
SRR Equipment-Chainsaw CHAINSAW
A.5 PNP OWNED SEARCH AND RESCUE ASSETS/EQUIPPAGE

22
SRR Equipment-Portable Generator PORTABLE GENERATOR

23
SRR Equipment-Utility Truck UTILITY TRUCK

24
SRR Equipment-Light Truck LIGHT TRUCK
PNP OWNED SEARCH, RESCUE, AND RETRIEVAL ASSETS/EQUIPPAGE

A.6 PNP OWNED MO


25
SRR Equipment-Ambulance AMBULANCE

TS/EQUIPPAGE

26
SRR Equipment-Motorized Banca MOTORIZED BANCA

SRR Equipment-Rubber boat withou RUBBER BOAT WITHOUT

27
Outboard Motor OUTBOARD MOTOR

28
SRR Equipment-Drum Boat DRUM BOAT
A.6 PNP OWNED MOBILITY ASSETS

29
SRR Equipment-Tactical Watercraft TACTICAL WATERCRAFT

RR Equipment-SAR Vehicle With Water SAR VEHICLE WITH WATER

30
Desalination Machine DESALINATION MACHINE

Nr Of PNP Personnel Deployed In NR OF DEPLOYED PNP PERSONNEL AT

31
Evacuation Center EVACUATON CENTERS

Nr Of PNP WCPD Personnel Deployed In NR OF DEPLOYED WCPD PERSONNEL

32
Evacuation Centers AT EVACUATION CENTER

Nr Of PNP Personnel Deployed In Vacated NR OF DEPLOYED PNP PERSONNEL AT

33
Areas VACATED AREAS

Nr Of PNP Personnel Deployed in Affected NR OF DEPLOYED PNP PERSONNEL AT

34
Areas AFFECTED AREAS

NR OF DEPLOYED PNP SRR PERSONNEL

35
Nr Of SRR Personnel Deployed
AT AFFECTED AREAS
B. DISASTER RESPONSES S

B.1 DEPLOYMENT OF PNP PERSONN


Nr Of PNP Personnel Deployed In Stranded NR OF DEPLOYED PNP

36
Areas-Airport PERSONNEL AT AIRPORT

Nr Of PNP Personnel Deployed In Stranded NR OF DEPLOYED PNP

37
Area-Seaport PERSONNEL AT SEAPORT

AREAS
NR OF DEPLOYED PNP
Nr Of PNP Personnel Deployed In Stranded

38
YMENT OF PNP PERSONNEL

PERSONNEL AT BUS
B.1.6 AT STRANDED
Area-Bus Terminal
TERMINAL
TOTAL NR OF DEPLOYED

39
Total Nr Of Personnel Deployed
PERSONNEL
B.1.7

TOTAL NR OF RSSF
TION OF

40
Nr Of RSSF Personnel
PERSONNEL
RECAPITULA

Nr Of Evacuation Center Established NR OF EVACUATION CENER

41
Established By LGU ESTABLISHED BY LGU
DISASTER RESPONSES STAGE (DURING THE TYPHOON)

NR OF EVACUATION

42
Nr Of Evacuation Centers Occupied
CENTERS OCCUPIED
CENTER

NR OF VACANT EVACUATION

43
Nr Of Vacant Evacuation Centers
CENTERS
NR OF EVACUATION
RELATED DATA

44
Nr Of Evacuess By Family BY FAMILY
B.2 EVACUATION CENTERS

NR OF

45
Nr Of Evacuess Individually PER INDIVIDUAL
EVACUESS

NUMBER OF RESCUE

46
Nr Of Rescue Operations Conducted
OPERATIONS CONDUCTED
RESCUE
OPERATIONS
C.1 RESPONSE OPERAT
NR OF RESCUED

RESCUE

47
Nr Of Rescued Individuals
INDIVIDUALS

NR OF RETRIEVAL

48
Nr Of Retrieval Operations Conducted
OPERATIONS CONDUCTED

NR OF RETRIEVED BODY OR

49
Nr Of Retrieved Body Or Cadaver
C.1 RESPONSE OPERATIONS

RETRIEVAL
CADAVER

NR OF RELIEF OPERATIONS OPERATIONS OPERATIONS

50
Nr Of Relief Operations Conducted
CONDUCTED
NR OF BENEFECIARIES
Nr Of Individuals As Relief Operations

51
(INDIVIDUALS) OF RELIEF
Beneficiaries
OPERATIONS
OPERATIONS
NR OF RELIEF

52
Total Estimated Amount TOTAL ESTIMATED AMOUNT

53
Nr Of Reported Looting Incidents NR OF REPORTED LOOTING INCIDENTS
C.2 RELIEF OPERATIONS (DURING)
ORDER

Nr Of Arrested Individuals Due To Looting NR OF ARRESTED INDIVIDUALS DUE TO

54
Incidents LOOTING INCIDENTS
C.3 LAW AND

NR OF ROAD CLEARING OPERATIONS

55
Nr Of Road Clearing Operations Conducted
CONDUCTED
C.4 ROAD
CLEARING
OPERATIONS

56
Nr Of Warehouse NR OF WAREHOUSES
S

Nr Of PNP Personnel Deployed As

57
Warehouse Security
C. RESPONSE OPERATIONS

WAREHOUSE

NR OF PNP PERSONNEL DEPLOYED


S
C.5 Security Operat
NR OF GROCERIES OR RATIONS

58
Nr Of Groceries Or Supermarket SUPERMARKETS

OR

ETS
Nr Of PNP Personnel Deployed As Groceries NR OF PNP PERSONNEL

59
DEPLOYED

GROCERIES
Or Supermarket Security

SUPERMARK

60
Nr Of Gas Station NR OF GAS STATIONS
Stations/Banks)

GAS
Nr Of PNP Personnel Deployed As Gas

61
Nr Of PNP Personnel Deployed
STATIONS
Station Security

62
Nr Of Banks NR OF BANKS
C.5 Security Operations(WarehouseS/Groceries/Gas

BANKS

63
Nr Of Personnel Deployed As Bank Security
NR OF PNP PERSONNEL DEPLOYED

64
Nr Of Donors NR OF DONORS

65
Nr Of Recipients Or Beneficiaries NR OF RECIPIENTS OR BENEFICIARIES
C.6 DONATIONS

66
Estimated Amount Of Donation ESTIMATED AMOUNT OF DONATION

67
Affected Personnel-PNP PNP
D.1

PNP/NUP

68
Affected Personnel -NUP NUP
AFFECTED
69
Nr Of Damaged PNP Building NR OF DAMAGED PNP BUILDING

URE
ESTIMATED COST OF DAMAGED PNP

70
Estimaged Cost Of Damaged PNP Building
BUILDING
D.2 DAMAGED
INFRASTRUCT

71
Nr Of Damaged PNP Equipment NR OF DAMAGED PNP EQUIPMENT
D.3

PNP

ESTIMATED COST OF DAMAGE TO PNP

72
Estimated Cost of Damaged PNP Equipment
DAMAGED

EQUIPMENT
EQUIPMENT

73
Casualties-PNP-Or-NUP-Dead DEAD

74
Casualties-PNP-Or-NUP-Injured INJURED
PNP OR NUP

75
Casualties-PNP-Or-NUP-Missing MISSING

76
Casualties-Civilian-Dead DEAD
D.4 CASUALTIES

77
Casualties-Civilian-Injured INJURED
CIVILIAN

78
Casualties-Civilian-Missing MISSING

79
Flooded Areas-Nr Of Affected Barangays NR OF AFFECTED BARANGAYS
D. POST DISASTER S

D.5 FLOODED AREAS


80
Flooded Areas-Nr Of Affected Families NR OF AFFECTED FAMILIES

81
Flooded Areas-Nr Of Affected Individuals NR OF AFFECTED INDIVIDUALS D.5 FLOODED AREAS

82
Landslide Incident-Nr Of Affected Barangays NR OF AFFECTED BARANGAYS

83
Landslide Incident-Nr Of Affected Families NR OF AFFECTED FAMILIES
INCENT

Landslide Incident-Nr Of Affected


D6. LANDSLIDE

84
NR OF AFFECTED INDIVIDUALS
Individuals

85
Nr Of Impassable Roads NR OF IMPASSABLE ROADS
D.7
D. POST DISASTER STAGE (AFTERMATH OR EFFECTS)

BRIDGES

86
Nr Of Impassable Bridges NR OF IMPASSABLE BRIDGES
AFFECTED
ROADS AND

NR OF BARANGAY WITHOUT

87
Nr Of Barangay Without Electricity
ELECTRICITY
Y
D.8.1

88
Nr Of Barangay Electricity Restored NR OF BARANGAY RESTORED

NR OF BARANGAY WITHOUT

89
Nr Of Barangay Without-Water
WATER

90
Nr Of Barangay Water Supply Restored NR OF BARANGAY RESTORED
ELECTRICIT D.8.2 WATER
COMMUNICATION LINES
D.8 AFFECTED POWER, WATER AND
NR OF BARANGAY WITHOUT

91
Nr Of Barangay Without Telco Signal

CATION LINES
TELCO (SIGNAL)

OWER, WATER AND

92
Nr of Barangay Telco Signal Restored NR OF BARANGAY RESTORED

D.8.3 TELCOM

93
Nr Of Cancelled Flights NR OF CANCELLED FLIGHTS

94
Nr Of Cancelled Ship Vogage NR OF CANCELLED SHIP VOGAGE
D.9

STATUS
SITUATION OR

95
Nr Of Cancelled Bus Voyage NR OF CANCELLED BUS VOYAGE/TRIP
TRANSPORTATION

96
Stranded Passengers-At Airport IN AIRPORTS

97
Stranded Passengers-At Seaport IN SEAPORTS
PASSENGERS
D.10 STRANDED

98
Stranded Passengers-At Terminal IN BUS TERMINALS
Date

Date

31-May-22
Time Of Report

Report
Time Of

9:00 AM PRO4B
PRO/UNIT
PRO/UNIT

SUBUNIT/DPO/PPO/CPO
SUBUNIT/DPO/PPO/CPO

CPS/MPS
CPS/MPS

1
Total Strength TOTAL STRENGTH

2
Strength-Nr Of SRR Personnel NR OF SRR PERSONNEL
STRENGTH
A.1 PNP PERSONNEL
STRENGTH

3
Strength-Nr Of RSSF Personnel NR OF RSSF PERSONNEL

NP PERSONNEL

4
Social Media and Media Advisory-TV TV

5
Social Media and Media Advisory-Radio RADIO

6
Social Media and Media Advisory-Internet INTERNET
ADVISORY

7
Social Media and Media Advisory-Messages MESSAGES

8
Social Media and Media Advisory-Print PRINT
A.2 SOCIAL MEDIA AND SOCIAL

9
Directives and Meetings-Dispatched DIRECTIVE DISPATCHED
A.3

AND

Communication Or Other Activities COMMUNICATION/OTHER ACTIVITIES

10
MEETINGS

Conducted CONDUCTED
DIRECTIVES

11
SRR Equipment-Radios RADIOS

12
SRR Equipment-Satelite Phones SATELITE PHONES
A.4

EQUIPMENT

13
SRR Equipment-Others OTHERS
COMMUNICATION
14
SRR Equipment-PNP Blue Box PNP BLUE BOX

15
SRR Equipment-Life Vest LIFE VEST

16
SRR Equipment-Spine Board SPINE BOARD

17
SRR Equipment-Rescue Rope RESCUE ROPE

18
SRR Equipment-Rapelling Set RAPELLING SET

19
SRR Equipment-Floating Ring FLOATING RING

20
SRR Equipment-Megaphone MEGAPHONE

21
SRR Equipment-Chainsaw CHAINSAW
A.5 PNP OWNED SEARCH AND RESCUE ASSETS/EQUIPPAGE

22
SRR Equipment-Portable Generator PORTABLE GENERATOR

23
SRR Equipment-Utility Truck UTILITY TRUCK

24
SRR Equipment-Light Truck LIGHT TRUCK
PNP OWNED SEARCH, RESCUE, AND RETRIEVAL ASSETS/EQUIPPAGE

A.6 PNP OWNED MO


25
SRR Equipment-Ambulance AMBULANCE

TS/EQUIPPAGE

26
SRR Equipment-Motorized Banca MOTORIZED BANCA

SRR Equipment-Rubber boat withou RUBBER BOAT WITHOUT

27
Outboard Motor OUTBOARD MOTOR

28
SRR Equipment-Drum Boat DRUM BOAT
A.6 PNP OWNED MOBILITY ASSETS

29
SRR Equipment-Tactical Watercraft TACTICAL WATERCRAFT

RR Equipment-SAR Vehicle With Water SAR VEHICLE WITH WATER

30
Desalination Machine DESALINATION MACHINE

Nr Of PNP Personnel Deployed In NR OF DEPLOYED PNP PERSONNEL AT

31
Evacuation Center EVACUATON CENTERS

Nr Of PNP WCPD Personnel Deployed In NR OF DEPLOYED WCPD PERSONNEL

32
Evacuation Centers AT EVACUATION CENTER

Nr Of PNP Personnel Deployed In Vacated NR OF DEPLOYED PNP PERSONNEL AT

33
Areas VACATED AREAS

Nr Of PNP Personnel Deployed in Affected NR OF DEPLOYED PNP PERSONNEL AT

34
Areas AFFECTED AREAS

NR OF DEPLOYED PNP SRR PERSONNEL

35
Nr Of SRR Personnel Deployed
AT AFFECTED AREAS
B. DISASTER RESPONSES S

B.1 DEPLOYMENT OF PNP PERSONN


Nr Of PNP Personnel Deployed In Stranded NR OF DEPLOYED PNP

36
Areas-Airport PERSONNEL AT AIRPORT

Nr Of PNP Personnel Deployed In Stranded NR OF DEPLOYED PNP

37
Area-Seaport PERSONNEL AT SEAPORT

AREAS
NR OF DEPLOYED PNP
Nr Of PNP Personnel Deployed In Stranded

38
YMENT OF PNP PERSONNEL

PERSONNEL AT BUS
B.1.6 AT STRANDED
Area-Bus Terminal
TERMINAL
TOTAL NR OF DEPLOYED

39
Total Nr Of Personnel Deployed
PERSONNEL
B.1.7

TOTAL NR OF RSSF
TION OF

40
Nr Of RSSF Personnel
PERSONNEL
RECAPITULA

Nr Of Evacuation Center Established NR OF EVACUATION CENER

41
Established By LGU ESTABLISHED BY LGU
DISASTER RESPONSES STAGE (DURING THE TYPHOON)

NR OF EVACUATION

42
Nr Of Evacuation Centers Occupied
CENTERS OCCUPIED
CENTER

NR OF VACANT EVACUATION

43
Nr Of Vacant Evacuation Centers
CENTERS
NR OF EVACUATION
RELATED DATA

44
Nr Of Evacuess By Family BY FAMILY
B.2 EVACUATION CENTERS

NR OF

45
Nr Of Evacuess Individually PER INDIVIDUAL
EVACUESS

NUMBER OF RESCUE

46
Nr Of Rescue Operations Conducted
OPERATIONS CONDUCTED
RESCUE
OPERATIONS
C.1 RESPONSE OPERAT
NR OF RESCUED

RESCUE

47
Nr Of Rescued Individuals
INDIVIDUALS

NR OF RETRIEVAL

48
Nr Of Retrieval Operations Conducted
OPERATIONS CONDUCTED

NR OF RETRIEVED BODY OR

49
Nr Of Retrieved Body Or Cadaver
C.1 RESPONSE OPERATIONS

RETRIEVAL
CADAVER

NR OF RELIEF OPERATIONS OPERATIONS OPERATIONS

50
Nr Of Relief Operations Conducted
CONDUCTED
NR OF BENEFECIARIES
Nr Of Individuals As Relief Operations

51
(INDIVIDUALS) OF RELIEF
Beneficiaries
OPERATIONS
OPERATIONS
NR OF RELIEF

52
Total Estimated Amount TOTAL ESTIMATED AMOUNT

53
Nr Of Reported Looting Incidents NR OF REPORTED LOOTING INCIDENTS
C.2 RELIEF OPERATIONS (DURING)
ORDER

Nr Of Arrested Individuals Due To Looting NR OF ARRESTED INDIVIDUALS DUE TO

54
Incidents LOOTING INCIDENTS
C.3 LAW AND

NR OF ROAD CLEARING OPERATIONS

55
Nr Of Road Clearing Operations Conducted
CONDUCTED
C.4 ROAD
CLEARING
OPERATIONS

56
Nr Of Warehouse NR OF WAREHOUSES
S

Nr Of PNP Personnel Deployed As

57
Warehouse Security
C. RESPONSE OPERATIONS

WAREHOUSE

NR OF PNP PERSONNEL DEPLOYED


S
C.5 Security Operat
NR OF GROCERIES OR RATIONS

58
Nr Of Groceries Or Supermarket SUPERMARKETS

OR

ETS
Nr Of PNP Personnel Deployed As Groceries NR OF PNP PERSONNEL

59
DEPLOYED

GROCERIES
Or Supermarket Security

SUPERMARK

60
Nr Of Gas Station NR OF GAS STATIONS
Stations/Banks)

GAS
Nr Of PNP Personnel Deployed As Gas

61
Nr Of PNP Personnel Deployed
STATIONS
Station Security

62
Nr Of Banks NR OF BANKS
C.5 Security Operations(WarehouseS/Groceries/Gas

BANKS

63
Nr Of Personnel Deployed As Bank Security
NR OF PNP PERSONNEL DEPLOYED

64
Nr Of Donors NR OF DONORS

65
Nr Of Recipients Or Beneficiaries NR OF RECIPIENTS OR BENEFICIARIES
C.6 DONATIONS

66
Estimated Amount Of Donation ESTIMATED AMOUNT OF DONATION

67
Affected Personnel-PNP PNP
D.1

PNP/NUP

68
Affected Personnel -NUP NUP
AFFECTED
69
Nr Of Damaged PNP Building NR OF DAMAGED PNP BUILDING

URE
ESTIMATED COST OF DAMAGED PNP

70
Estimaged Cost Of Damaged PNP Building
BUILDING
D.2 DAMAGED
INFRASTRUCT

71
Nr Of Damaged PNP Equipment NR OF DAMAGED PNP EQUIPMENT
D.3

PNP

ESTIMATED COST OF DAMAGE TO PNP

72
Estimated Cost of Damaged PNP Equipment
DAMAGED

EQUIPMENT
EQUIPMENT

73
Casualties-PNP-Or-NUP-Dead DEAD

74
Casualties-PNP-Or-NUP-Injured INJURED
PNP OR NUP

75
Casualties-PNP-Or-NUP-Missing MISSING

76
Casualties-Civilian-Dead DEAD
D.4 CASUALTIES

77
Casualties-Civilian-Injured INJURED
CIVILIAN

78
Casualties-Civilian-Missing MISSING

79
Flooded Areas-Nr Of Affected Barangays NR OF AFFECTED BARANGAYS
D. POST DISASTER S

D.5 FLOODED AREAS


80
Flooded Areas-Nr Of Affected Families NR OF AFFECTED FAMILIES

81
Flooded Areas-Nr Of Affected Individuals NR OF AFFECTED INDIVIDUALS D.5 FLOODED AREAS

82
Landslide Incident-Nr Of Affected Barangays NR OF AFFECTED BARANGAYS

83
Landslide Incident-Nr Of Affected Families NR OF AFFECTED FAMILIES
INCENT

Landslide Incident-Nr Of Affected


D6. LANDSLIDE

84
NR OF AFFECTED INDIVIDUALS
Individuals

85
Nr Of Impassable Roads NR OF IMPASSABLE ROADS
D.7
D. POST DISASTER STAGE (AFTERMATH OR EFFECTS)

BRIDGES

86
Nr Of Impassable Bridges NR OF IMPASSABLE BRIDGES
AFFECTED
ROADS AND

NR OF BARANGAY WITHOUT

87
Nr Of Barangay Without Electricity
ELECTRICITY
Y
D.8.1

88
Nr Of Barangay Electricity Restored NR OF BARANGAY RESTORED

NR OF BARANGAY WITHOUT

89
Nr Of Barangay Without-Water
WATER

90
Nr Of Barangay Water Supply Restored NR OF BARANGAY RESTORED
ELECTRICIT D.8.2 WATER
COMMUNICATION LINES
D.8 AFFECTED POWER, WATER AND
NR OF BARANGAY WITHOUT

91
Nr Of Barangay Without Telco Signal

CATION LINES
TELCO (SIGNAL)

OWER, WATER AND

92
Nr of Barangay Telco Signal Restored NR OF BARANGAY RESTORED

D.8.3 TELCOM

93
Nr Of Cancelled Flights NR OF CANCELLED FLIGHTS

94
Nr Of Cancelled Ship Vogage NR OF CANCELLED SHIP VOGAGE
D.9

STATUS
SITUATION OR

95
Nr Of Cancelled Bus Voyage NR OF CANCELLED BUS VOYAGE/TRIP
TRANSPORTATION

96
Stranded Passengers-At Airport IN AIRPORTS

97
Stranded Passengers-At Seaport IN SEAPORTS
PASSENGERS
D.10 STRANDED

98
Stranded Passengers-At Terminal IN BUS TERMINALS
Date

Date

31-May-22
Time Of Report

Report
Time Of

9:00 AM PRO4A
PRO/UNIT
PRO/UNIT

SUBUNIT/DPO/PPO/CPO
SUBUNIT/DPO/PPO/CPO

CPS/MPS
CPS/MPS

1
Total Strength TOTAL STRENGTH

2
Strength-Nr Of SRR Personnel NR OF SRR PERSONNEL
STRENGTH
A.1 PNP PERSONNEL
STRENGTH

3
Strength-Nr Of RSSF Personnel NR OF RSSF PERSONNEL

NP PERSONNEL

4
Social Media and Media Advisory-TV TV

5
Social Media and Media Advisory-Radio RADIO

6
Social Media and Media Advisory-Internet INTERNET
ADVISORY

7
Social Media and Media Advisory-Messages MESSAGES

8
Social Media and Media Advisory-Print PRINT
A.2 SOCIAL MEDIA AND SOCIAL

9
Directives and Meetings-Dispatched DIRECTIVE DISPATCHED
A.3

AND

Communication Or Other Activities COMMUNICATION/OTHER ACTIVITIES

10
MEETINGS

Conducted CONDUCTED
DIRECTIVES

11
SRR Equipment-Radios RADIOS

12
SRR Equipment-Satelite Phones SATELITE PHONES
A.4

EQUIPMENT

13
SRR Equipment-Others OTHERS
COMMUNICATION
14
SRR Equipment-PNP Blue Box PNP BLUE BOX

15
SRR Equipment-Life Vest LIFE VEST

16
SRR Equipment-Spine Board SPINE BOARD

17
SRR Equipment-Rescue Rope RESCUE ROPE

18
SRR Equipment-Rapelling Set RAPELLING SET

19
SRR Equipment-Floating Ring FLOATING RING

20
SRR Equipment-Megaphone MEGAPHONE

21
SRR Equipment-Chainsaw CHAINSAW
A.5 PNP OWNED SEARCH AND RESCUE ASSETS/EQUIPPAGE

22
SRR Equipment-Portable Generator PORTABLE GENERATOR

23
SRR Equipment-Utility Truck UTILITY TRUCK

24
SRR Equipment-Light Truck LIGHT TRUCK
PNP OWNED SEARCH, RESCUE, AND RETRIEVAL ASSETS/EQUIPPAGE

A.6 PNP OWNED MO


25
SRR Equipment-Ambulance AMBULANCE

TS/EQUIPPAGE

26
SRR Equipment-Motorized Banca MOTORIZED BANCA

SRR Equipment-Rubber boat withou RUBBER BOAT WITHOUT

27
Outboard Motor OUTBOARD MOTOR

28
SRR Equipment-Drum Boat DRUM BOAT
A.6 PNP OWNED MOBILITY ASSETS

29
SRR Equipment-Tactical Watercraft TACTICAL WATERCRAFT

RR Equipment-SAR Vehicle With Water SAR VEHICLE WITH WATER

30
Desalination Machine DESALINATION MACHINE

Nr Of PNP Personnel Deployed In NR OF DEPLOYED PNP PERSONNEL AT

31
Evacuation Center EVACUATON CENTERS

Nr Of PNP WCPD Personnel Deployed In NR OF DEPLOYED WCPD PERSONNEL

32
Evacuation Centers AT EVACUATION CENTER

Nr Of PNP Personnel Deployed In Vacated NR OF DEPLOYED PNP PERSONNEL AT

33
Areas VACATED AREAS

Nr Of PNP Personnel Deployed in Affected NR OF DEPLOYED PNP PERSONNEL AT

34
Areas AFFECTED AREAS

NR OF DEPLOYED PNP SRR PERSONNEL

35
Nr Of SRR Personnel Deployed
AT AFFECTED AREAS
B. DISASTER RESPONSES S

B.1 DEPLOYMENT OF PNP PERSONN


Nr Of PNP Personnel Deployed In Stranded NR OF DEPLOYED PNP

36
Areas-Airport PERSONNEL AT AIRPORT

Nr Of PNP Personnel Deployed In Stranded NR OF DEPLOYED PNP

37
Area-Seaport PERSONNEL AT SEAPORT

AREAS
NR OF DEPLOYED PNP
Nr Of PNP Personnel Deployed In Stranded

38
YMENT OF PNP PERSONNEL

PERSONNEL AT BUS
B.1.6 AT STRANDED
Area-Bus Terminal
TERMINAL
TOTAL NR OF DEPLOYED

39
Total Nr Of Personnel Deployed
PERSONNEL
B.1.7

TOTAL NR OF RSSF
TION OF

40
Nr Of RSSF Personnel
PERSONNEL
RECAPITULA

Nr Of Evacuation Center Established NR OF EVACUATION CENER

41
Established By LGU ESTABLISHED BY LGU
DISASTER RESPONSES STAGE (DURING THE TYPHOON)

NR OF EVACUATION

42
Nr Of Evacuation Centers Occupied
CENTERS OCCUPIED
CENTER

NR OF VACANT EVACUATION

43
Nr Of Vacant Evacuation Centers
CENTERS
NR OF EVACUATION
RELATED DATA

44
Nr Of Evacuess By Family BY FAMILY
B.2 EVACUATION CENTERS

NR OF

45
Nr Of Evacuess Individually PER INDIVIDUAL
EVACUESS

NUMBER OF RESCUE

46
Nr Of Rescue Operations Conducted
OPERATIONS CONDUCTED
RESCUE
OPERATIONS
C.1 RESPONSE OPERAT
NR OF RESCUED

RESCUE

47
Nr Of Rescued Individuals
INDIVIDUALS

NR OF RETRIEVAL

48
Nr Of Retrieval Operations Conducted
OPERATIONS CONDUCTED

NR OF RETRIEVED BODY OR

49
Nr Of Retrieved Body Or Cadaver
C.1 RESPONSE OPERATIONS

RETRIEVAL
CADAVER

NR OF RELIEF OPERATIONS OPERATIONS OPERATIONS

50
Nr Of Relief Operations Conducted
CONDUCTED
NR OF BENEFECIARIES
Nr Of Individuals As Relief Operations

51
(INDIVIDUALS) OF RELIEF
Beneficiaries
OPERATIONS
OPERATIONS
NR OF RELIEF

52
Total Estimated Amount TOTAL ESTIMATED AMOUNT

53
Nr Of Reported Looting Incidents NR OF REPORTED LOOTING INCIDENTS
C.2 RELIEF OPERATIONS (DURING)
ORDER

Nr Of Arrested Individuals Due To Looting NR OF ARRESTED INDIVIDUALS DUE TO

54
Incidents LOOTING INCIDENTS
C.3 LAW AND

NR OF ROAD CLEARING OPERATIONS

55
Nr Of Road Clearing Operations Conducted
CONDUCTED
C.4 ROAD
CLEARING
OPERATIONS

56
Nr Of Warehouse NR OF WAREHOUSES
S

Nr Of PNP Personnel Deployed As

57
Warehouse Security
C. RESPONSE OPERATIONS

WAREHOUSE

NR OF PNP PERSONNEL DEPLOYED


S
C.5 Security Operat
NR OF GROCERIES OR RATIONS

58
Nr Of Groceries Or Supermarket SUPERMARKETS

OR

ETS
Nr Of PNP Personnel Deployed As Groceries NR OF PNP PERSONNEL

59
DEPLOYED

GROCERIES
Or Supermarket Security

SUPERMARK

60
Nr Of Gas Station NR OF GAS STATIONS
Stations/Banks)

GAS
Nr Of PNP Personnel Deployed As Gas

61
Nr Of PNP Personnel Deployed
STATIONS
Station Security

62
Nr Of Banks NR OF BANKS
C.5 Security Operations(WarehouseS/Groceries/Gas

BANKS

63
Nr Of Personnel Deployed As Bank Security
NR OF PNP PERSONNEL DEPLOYED

64
Nr Of Donors NR OF DONORS

65
Nr Of Recipients Or Beneficiaries NR OF RECIPIENTS OR BENEFICIARIES
C.6 DONATIONS

66
Estimated Amount Of Donation ESTIMATED AMOUNT OF DONATION

67
Affected Personnel-PNP PNP
D.1

PNP/NUP

68
Affected Personnel -NUP NUP
AFFECTED
69
Nr Of Damaged PNP Building NR OF DAMAGED PNP BUILDING

URE
ESTIMATED COST OF DAMAGED PNP

70
Estimaged Cost Of Damaged PNP Building
BUILDING
D.2 DAMAGED
INFRASTRUCT

71
Nr Of Damaged PNP Equipment NR OF DAMAGED PNP EQUIPMENT
D.3

PNP

ESTIMATED COST OF DAMAGE TO PNP

72
Estimated Cost of Damaged PNP Equipment
DAMAGED

EQUIPMENT
EQUIPMENT

73
Casualties-PNP-Or-NUP-Dead DEAD

74
Casualties-PNP-Or-NUP-Injured INJURED
PNP OR NUP

75
Casualties-PNP-Or-NUP-Missing MISSING

76
Casualties-Civilian-Dead DEAD
D.4 CASUALTIES

77
Casualties-Civilian-Injured INJURED
CIVILIAN

78
Casualties-Civilian-Missing MISSING

79
Flooded Areas-Nr Of Affected Barangays NR OF AFFECTED BARANGAYS
D. POST DISASTER S

D.5 FLOODED AREAS


80
Flooded Areas-Nr Of Affected Families NR OF AFFECTED FAMILIES

81
Flooded Areas-Nr Of Affected Individuals NR OF AFFECTED INDIVIDUALS D.5 FLOODED AREAS

82
Landslide Incident-Nr Of Affected Barangays NR OF AFFECTED BARANGAYS

83
Landslide Incident-Nr Of Affected Families NR OF AFFECTED FAMILIES
INCENT

Landslide Incident-Nr Of Affected


D6. LANDSLIDE

84
NR OF AFFECTED INDIVIDUALS
Individuals

85
Nr Of Impassable Roads NR OF IMPASSABLE ROADS
D.7
D. POST DISASTER STAGE (AFTERMATH OR EFFECTS)

BRIDGES

86
Nr Of Impassable Bridges NR OF IMPASSABLE BRIDGES
AFFECTED
ROADS AND

NR OF BARANGAY WITHOUT

87
Nr Of Barangay Without Electricity
ELECTRICITY
Y
D.8.1

88
Nr Of Barangay Electricity Restored NR OF BARANGAY RESTORED

NR OF BARANGAY WITHOUT

89
Nr Of Barangay Without-Water
WATER

90
Nr Of Barangay Water Supply Restored NR OF BARANGAY RESTORED
ELECTRICIT D.8.2 WATER
COMMUNICATION LINES
D.8 AFFECTED POWER, WATER AND
NR OF BARANGAY WITHOUT

91
Nr Of Barangay Without Telco Signal

CATION LINES
TELCO (SIGNAL)

OWER, WATER AND

92
Nr of Barangay Telco Signal Restored NR OF BARANGAY RESTORED

D.8.3 TELCOM

93
Nr Of Cancelled Flights NR OF CANCELLED FLIGHTS

94
Nr Of Cancelled Ship Vogage NR OF CANCELLED SHIP VOGAGE
D.9

STATUS
SITUATION OR

95
Nr Of Cancelled Bus Voyage NR OF CANCELLED BUS VOYAGE/TRIP
TRANSPORTATION

96
Stranded Passengers-At Airport IN AIRPORTS

97
Stranded Passengers-At Seaport IN SEAPORTS
PASSENGERS
D.10 STRANDED

98
Stranded Passengers-At Terminal IN BUS TERMINALS
Date

Date

31-May-22
Time Of Report

Report
Time Of

9:00 AM PRO3
PRO/UNIT
PRO/UNIT

SUBUNIT/DPO/PPO/CPO
SUBUNIT/DPO/PPO/CPO

CPS/MPS
CPS/MPS

1
Total Strength TOTAL STRENGTH

2
Strength-Nr Of SRR Personnel NR OF SRR PERSONNEL
STRENGTH
A.1 PNP PERSONNEL
STRENGTH

3
Strength-Nr Of RSSF Personnel NR OF RSSF PERSONNEL

NP PERSONNEL

4
Social Media and Media Advisory-TV TV

5
Social Media and Media Advisory-Radio RADIO

6
Social Media and Media Advisory-Internet INTERNET
ADVISORY

7
Social Media and Media Advisory-Messages MESSAGES

8
Social Media and Media Advisory-Print PRINT
A.2 SOCIAL MEDIA AND SOCIAL

9
Directives and Meetings-Dispatched DIRECTIVE DISPATCHED
A.3

AND

Communication Or Other Activities COMMUNICATION/OTHER ACTIVITIES

10
MEETINGS

Conducted CONDUCTED
DIRECTIVES

11
SRR Equipment-Radios RADIOS

12
SRR Equipment-Satelite Phones SATELITE PHONES
A.4

EQUIPMENT

13
SRR Equipment-Others OTHERS
COMMUNICATION
14
SRR Equipment-PNP Blue Box PNP BLUE BOX

15
SRR Equipment-Life Vest LIFE VEST

16
SRR Equipment-Spine Board SPINE BOARD

17
SRR Equipment-Rescue Rope RESCUE ROPE

18
SRR Equipment-Rapelling Set RAPELLING SET

19
SRR Equipment-Floating Ring FLOATING RING

20
SRR Equipment-Megaphone MEGAPHONE

21
SRR Equipment-Chainsaw CHAINSAW
A.5 PNP OWNED SEARCH AND RESCUE ASSETS/EQUIPPAGE

22
SRR Equipment-Portable Generator PORTABLE GENERATOR

23
SRR Equipment-Utility Truck UTILITY TRUCK

24
SRR Equipment-Light Truck LIGHT TRUCK
PNP OWNED SEARCH, RESCUE, AND RETRIEVAL ASSETS/EQUIPPAGE

A.6 PNP OWNED MO


25
SRR Equipment-Ambulance AMBULANCE

TS/EQUIPPAGE

26
SRR Equipment-Motorized Banca MOTORIZED BANCA

SRR Equipment-Rubber boat withou RUBBER BOAT WITHOUT

27
Outboard Motor OUTBOARD MOTOR

28
SRR Equipment-Drum Boat DRUM BOAT
A.6 PNP OWNED MOBILITY ASSETS

29
SRR Equipment-Tactical Watercraft TACTICAL WATERCRAFT

RR Equipment-SAR Vehicle With Water SAR VEHICLE WITH WATER

30
Desalination Machine DESALINATION MACHINE

Nr Of PNP Personnel Deployed In NR OF DEPLOYED PNP PERSONNEL AT

31
Evacuation Center EVACUATON CENTERS

Nr Of PNP WCPD Personnel Deployed In NR OF DEPLOYED WCPD PERSONNEL

32
Evacuation Centers AT EVACUATION CENTER

Nr Of PNP Personnel Deployed In Vacated NR OF DEPLOYED PNP PERSONNEL AT

33
Areas VACATED AREAS

Nr Of PNP Personnel Deployed in Affected NR OF DEPLOYED PNP PERSONNEL AT

34
Areas AFFECTED AREAS

NR OF DEPLOYED PNP SRR PERSONNEL

35
Nr Of SRR Personnel Deployed
AT AFFECTED AREAS
B. DISASTER RESPONSES S

B.1 DEPLOYMENT OF PNP PERSONN


Nr Of PNP Personnel Deployed In Stranded NR OF DEPLOYED PNP

36
Areas-Airport PERSONNEL AT AIRPORT

Nr Of PNP Personnel Deployed In Stranded NR OF DEPLOYED PNP

37
Area-Seaport PERSONNEL AT SEAPORT

AREAS
NR OF DEPLOYED PNP
Nr Of PNP Personnel Deployed In Stranded

38
YMENT OF PNP PERSONNEL

PERSONNEL AT BUS
B.1.6 AT STRANDED
Area-Bus Terminal
TERMINAL
TOTAL NR OF DEPLOYED

39
Total Nr Of Personnel Deployed
PERSONNEL
B.1.7

TOTAL NR OF RSSF
TION OF

40
Nr Of RSSF Personnel
PERSONNEL
RECAPITULA

Nr Of Evacuation Center Established NR OF EVACUATION CENER

41
Established By LGU ESTABLISHED BY LGU
DISASTER RESPONSES STAGE (DURING THE TYPHOON)

NR OF EVACUATION

42
Nr Of Evacuation Centers Occupied
CENTERS OCCUPIED
CENTER

NR OF VACANT EVACUATION

43
Nr Of Vacant Evacuation Centers
CENTERS
NR OF EVACUATION
RELATED DATA

44
Nr Of Evacuess By Family BY FAMILY
B.2 EVACUATION CENTERS

NR OF

45
Nr Of Evacuess Individually PER INDIVIDUAL
EVACUESS

NUMBER OF RESCUE

46
Nr Of Rescue Operations Conducted
OPERATIONS CONDUCTED
RESCUE
OPERATIONS
C.1 RESPONSE OPERAT
NR OF RESCUED

RESCUE

47
Nr Of Rescued Individuals
INDIVIDUALS

NR OF RETRIEVAL

48
Nr Of Retrieval Operations Conducted
OPERATIONS CONDUCTED

NR OF RETRIEVED BODY OR

49
Nr Of Retrieved Body Or Cadaver
C.1 RESPONSE OPERATIONS

RETRIEVAL
CADAVER

NR OF RELIEF OPERATIONS OPERATIONS OPERATIONS

50
Nr Of Relief Operations Conducted
CONDUCTED
NR OF BENEFECIARIES
Nr Of Individuals As Relief Operations

51
(INDIVIDUALS) OF RELIEF
Beneficiaries
OPERATIONS
OPERATIONS
NR OF RELIEF

52
Total Estimated Amount TOTAL ESTIMATED AMOUNT

53
Nr Of Reported Looting Incidents NR OF REPORTED LOOTING INCIDENTS
C.2 RELIEF OPERATIONS (DURING)
ORDER

Nr Of Arrested Individuals Due To Looting NR OF ARRESTED INDIVIDUALS DUE TO

54
Incidents LOOTING INCIDENTS
C.3 LAW AND

NR OF ROAD CLEARING OPERATIONS

55
Nr Of Road Clearing Operations Conducted
CONDUCTED
C.4 ROAD
CLEARING
OPERATIONS

56
Nr Of Warehouse NR OF WAREHOUSES
S

Nr Of PNP Personnel Deployed As

57
Warehouse Security
C. RESPONSE OPERATIONS

WAREHOUSE

NR OF PNP PERSONNEL DEPLOYED


S
C.5 Security Operat
NR OF GROCERIES OR RATIONS

58
Nr Of Groceries Or Supermarket SUPERMARKETS

OR

ETS
Nr Of PNP Personnel Deployed As Groceries NR OF PNP PERSONNEL

59
DEPLOYED

GROCERIES
Or Supermarket Security

SUPERMARK

60
Nr Of Gas Station NR OF GAS STATIONS
Stations/Banks)

GAS
Nr Of PNP Personnel Deployed As Gas

61
Nr Of PNP Personnel Deployed
STATIONS
Station Security

62
Nr Of Banks NR OF BANKS
C.5 Security Operations(WarehouseS/Groceries/Gas

BANKS

63
Nr Of Personnel Deployed As Bank Security
NR OF PNP PERSONNEL DEPLOYED

64
Nr Of Donors NR OF DONORS

65
Nr Of Recipients Or Beneficiaries NR OF RECIPIENTS OR BENEFICIARIES
C.6 DONATIONS

66
Estimated Amount Of Donation ESTIMATED AMOUNT OF DONATION

67
Affected Personnel-PNP PNP
D.1

PNP/NUP

68
Affected Personnel -NUP NUP
AFFECTED
69
Nr Of Damaged PNP Building NR OF DAMAGED PNP BUILDING

URE
ESTIMATED COST OF DAMAGED PNP

70
Estimaged Cost Of Damaged PNP Building
BUILDING
D.2 DAMAGED
INFRASTRUCT

71
Nr Of Damaged PNP Equipment NR OF DAMAGED PNP EQUIPMENT
D.3

PNP

ESTIMATED COST OF DAMAGE TO PNP

72
Estimated Cost of Damaged PNP Equipment
DAMAGED

EQUIPMENT
EQUIPMENT

73
Casualties-PNP-Or-NUP-Dead DEAD

74
Casualties-PNP-Or-NUP-Injured INJURED
PNP OR NUP

75
Casualties-PNP-Or-NUP-Missing MISSING

76
Casualties-Civilian-Dead DEAD
D.4 CASUALTIES

77
Casualties-Civilian-Injured INJURED
CIVILIAN

78
Casualties-Civilian-Missing MISSING

79
Flooded Areas-Nr Of Affected Barangays NR OF AFFECTED BARANGAYS
D. POST DISASTER S

D.5 FLOODED AREAS


80
Flooded Areas-Nr Of Affected Families NR OF AFFECTED FAMILIES

81
Flooded Areas-Nr Of Affected Individuals NR OF AFFECTED INDIVIDUALS D.5 FLOODED AREAS

82
Landslide Incident-Nr Of Affected Barangays NR OF AFFECTED BARANGAYS

83
Landslide Incident-Nr Of Affected Families NR OF AFFECTED FAMILIES
INCENT

Landslide Incident-Nr Of Affected


D6. LANDSLIDE

84
NR OF AFFECTED INDIVIDUALS
Individuals

85
Nr Of Impassable Roads NR OF IMPASSABLE ROADS
D.7
D. POST DISASTER STAGE (AFTERMATH OR EFFECTS)

BRIDGES

86
Nr Of Impassable Bridges NR OF IMPASSABLE BRIDGES
AFFECTED
ROADS AND

NR OF BARANGAY WITHOUT

87
Nr Of Barangay Without Electricity
ELECTRICITY
Y
D.8.1

88
Nr Of Barangay Electricity Restored NR OF BARANGAY RESTORED

NR OF BARANGAY WITHOUT

89
Nr Of Barangay Without-Water
WATER

90
Nr Of Barangay Water Supply Restored NR OF BARANGAY RESTORED
ELECTRICIT D.8.2 WATER
COMMUNICATION LINES
D.8 AFFECTED POWER, WATER AND
NR OF BARANGAY WITHOUT

91
Nr Of Barangay Without Telco Signal

CATION LINES
TELCO (SIGNAL)

OWER, WATER AND

92
Nr of Barangay Telco Signal Restored NR OF BARANGAY RESTORED

D.8.3 TELCOM

93
Nr Of Cancelled Flights NR OF CANCELLED FLIGHTS

94
Nr Of Cancelled Ship Vogage NR OF CANCELLED SHIP VOGAGE
D.9

STATUS
SITUATION OR

95
Nr Of Cancelled Bus Voyage NR OF CANCELLED BUS VOYAGE/TRIP
TRANSPORTATION

96
Stranded Passengers-At Airport IN AIRPORTS

97
Stranded Passengers-At Seaport IN SEAPORTS
PASSENGERS
D.10 STRANDED

98
Stranded Passengers-At Terminal IN BUS TERMINALS
Date

Date

31-May-22
Time Of Report

Report
Time Of

9:00 AM PRO2
PRO/UNIT
PRO/UNIT

SUBUNIT/DPO/PPO/CPO
SUBUNIT/DPO/PPO/CPO

CPS/MPS
CPS/MPS

1
Total Strength TOTAL STRENGTH

2
Strength-Nr Of SRR Personnel NR OF SRR PERSONNEL
STRENGTH
A.1 PNP PERSONNEL
STRENGTH

3
Strength-Nr Of RSSF Personnel NR OF RSSF PERSONNEL

NP PERSONNEL

4
Social Media and Media Advisory-TV TV

5
Social Media and Media Advisory-Radio RADIO

6
Social Media and Media Advisory-Internet INTERNET
ADVISORY

7
Social Media and Media Advisory-Messages MESSAGES

8
Social Media and Media Advisory-Print PRINT
A.2 SOCIAL MEDIA AND SOCIAL

9
Directives and Meetings-Dispatched DIRECTIVE DISPATCHED
A.3

AND

Communication Or Other Activities COMMUNICATION/OTHER ACTIVITIES

10
MEETINGS

Conducted CONDUCTED
DIRECTIVES

11
SRR Equipment-Radios RADIOS

12
SRR Equipment-Satelite Phones SATELITE PHONES
A.4

EQUIPMENT

13
SRR Equipment-Others OTHERS
COMMUNICATION
14
SRR Equipment-PNP Blue Box PNP BLUE BOX

15
SRR Equipment-Life Vest LIFE VEST

16
SRR Equipment-Spine Board SPINE BOARD

17
SRR Equipment-Rescue Rope RESCUE ROPE

18
SRR Equipment-Rapelling Set RAPELLING SET

19
SRR Equipment-Floating Ring FLOATING RING

20
SRR Equipment-Megaphone MEGAPHONE

21
SRR Equipment-Chainsaw CHAINSAW
A.5 PNP OWNED SEARCH AND RESCUE ASSETS/EQUIPPAGE

22
SRR Equipment-Portable Generator PORTABLE GENERATOR

23
SRR Equipment-Utility Truck UTILITY TRUCK

24
SRR Equipment-Light Truck LIGHT TRUCK
PNP OWNED SEARCH, RESCUE, AND RETRIEVAL ASSETS/EQUIPPAGE

A.6 PNP OWNED MO


25
SRR Equipment-Ambulance AMBULANCE

TS/EQUIPPAGE

26
SRR Equipment-Motorized Banca MOTORIZED BANCA

SRR Equipment-Rubber boat withou RUBBER BOAT WITHOUT

27
Outboard Motor OUTBOARD MOTOR

28
SRR Equipment-Drum Boat DRUM BOAT
A.6 PNP OWNED MOBILITY ASSETS

29
SRR Equipment-Tactical Watercraft TACTICAL WATERCRAFT

RR Equipment-SAR Vehicle With Water SAR VEHICLE WITH WATER

30
Desalination Machine DESALINATION MACHINE

Nr Of PNP Personnel Deployed In NR OF DEPLOYED PNP PERSONNEL AT

31
Evacuation Center EVACUATON CENTERS

Nr Of PNP WCPD Personnel Deployed In NR OF DEPLOYED WCPD PERSONNEL

32
Evacuation Centers AT EVACUATION CENTER

Nr Of PNP Personnel Deployed In Vacated NR OF DEPLOYED PNP PERSONNEL AT

33
Areas VACATED AREAS

Nr Of PNP Personnel Deployed in Affected NR OF DEPLOYED PNP PERSONNEL AT

34
Areas AFFECTED AREAS

NR OF DEPLOYED PNP SRR PERSONNEL

35
Nr Of SRR Personnel Deployed
AT AFFECTED AREAS
B. DISASTER RESPONSES S

B.1 DEPLOYMENT OF PNP PERSONN


Nr Of PNP Personnel Deployed In Stranded NR OF DEPLOYED PNP

36
Areas-Airport PERSONNEL AT AIRPORT

Nr Of PNP Personnel Deployed In Stranded NR OF DEPLOYED PNP

37
Area-Seaport PERSONNEL AT SEAPORT

AREAS
NR OF DEPLOYED PNP
Nr Of PNP Personnel Deployed In Stranded

38
YMENT OF PNP PERSONNEL

PERSONNEL AT BUS
B.1.6 AT STRANDED
Area-Bus Terminal
TERMINAL
TOTAL NR OF DEPLOYED

39
Total Nr Of Personnel Deployed
PERSONNEL
B.1.7

TOTAL NR OF RSSF
TION OF

40
Nr Of RSSF Personnel
PERSONNEL
RECAPITULA

Nr Of Evacuation Center Established NR OF EVACUATION CENER

41
Established By LGU ESTABLISHED BY LGU
DISASTER RESPONSES STAGE (DURING THE TYPHOON)

NR OF EVACUATION

42
Nr Of Evacuation Centers Occupied
CENTERS OCCUPIED
CENTER

NR OF VACANT EVACUATION

43
Nr Of Vacant Evacuation Centers
CENTERS
NR OF EVACUATION
RELATED DATA

44
Nr Of Evacuess By Family BY FAMILY
B.2 EVACUATION CENTERS

NR OF

45
Nr Of Evacuess Individually PER INDIVIDUAL
EVACUESS

NUMBER OF RESCUE

46
Nr Of Rescue Operations Conducted
OPERATIONS CONDUCTED
RESCUE
OPERATIONS
C.1 RESPONSE OPERAT
NR OF RESCUED

RESCUE

47
Nr Of Rescued Individuals
INDIVIDUALS

NR OF RETRIEVAL

48
Nr Of Retrieval Operations Conducted
OPERATIONS CONDUCTED

NR OF RETRIEVED BODY OR

49
Nr Of Retrieved Body Or Cadaver
C.1 RESPONSE OPERATIONS

RETRIEVAL
CADAVER

NR OF RELIEF OPERATIONS OPERATIONS OPERATIONS

50
Nr Of Relief Operations Conducted
CONDUCTED
NR OF BENEFECIARIES
Nr Of Individuals As Relief Operations

51
(INDIVIDUALS) OF RELIEF
Beneficiaries
OPERATIONS
OPERATIONS
NR OF RELIEF

52
Total Estimated Amount TOTAL ESTIMATED AMOUNT

53
Nr Of Reported Looting Incidents NR OF REPORTED LOOTING INCIDENTS
C.2 RELIEF OPERATIONS (DURING)
ORDER

Nr Of Arrested Individuals Due To Looting NR OF ARRESTED INDIVIDUALS DUE TO

54
Incidents LOOTING INCIDENTS
C.3 LAW AND

NR OF ROAD CLEARING OPERATIONS

55
Nr Of Road Clearing Operations Conducted
CONDUCTED
C.4 ROAD
CLEARING
OPERATIONS

56
Nr Of Warehouse NR OF WAREHOUSES
S

Nr Of PNP Personnel Deployed As

57
Warehouse Security
C. RESPONSE OPERATIONS

WAREHOUSE

NR OF PNP PERSONNEL DEPLOYED


S
C.5 Security Operat
NR OF GROCERIES OR RATIONS

58
Nr Of Groceries Or Supermarket SUPERMARKETS

OR

ETS
Nr Of PNP Personnel Deployed As Groceries NR OF PNP PERSONNEL

59
DEPLOYED

GROCERIES
Or Supermarket Security

SUPERMARK

60
Nr Of Gas Station NR OF GAS STATIONS
Stations/Banks)

GAS
Nr Of PNP Personnel Deployed As Gas

61
Nr Of PNP Personnel Deployed
STATIONS
Station Security

62
Nr Of Banks NR OF BANKS
C.5 Security Operations(WarehouseS/Groceries/Gas

BANKS

63
Nr Of Personnel Deployed As Bank Security
NR OF PNP PERSONNEL DEPLOYED

64
Nr Of Donors NR OF DONORS

65
Nr Of Recipients Or Beneficiaries NR OF RECIPIENTS OR BENEFICIARIES
C.6 DONATIONS

66
Estimated Amount Of Donation ESTIMATED AMOUNT OF DONATION

67
Affected Personnel-PNP PNP
D.1

PNP/NUP

68
Affected Personnel -NUP NUP
AFFECTED
69
Nr Of Damaged PNP Building NR OF DAMAGED PNP BUILDING

URE
ESTIMATED COST OF DAMAGED PNP

70
Estimaged Cost Of Damaged PNP Building
BUILDING
D.2 DAMAGED
INFRASTRUCT

71
Nr Of Damaged PNP Equipment NR OF DAMAGED PNP EQUIPMENT
D.3

PNP

ESTIMATED COST OF DAMAGE TO PNP

72
Estimated Cost of Damaged PNP Equipment
DAMAGED

EQUIPMENT
EQUIPMENT

73
Casualties-PNP-Or-NUP-Dead DEAD

74
Casualties-PNP-Or-NUP-Injured INJURED
PNP OR NUP

75
Casualties-PNP-Or-NUP-Missing MISSING

76
Casualties-Civilian-Dead DEAD
D.4 CASUALTIES

77
Casualties-Civilian-Injured INJURED
CIVILIAN

78
Casualties-Civilian-Missing MISSING

79
Flooded Areas-Nr Of Affected Barangays NR OF AFFECTED BARANGAYS
D. POST DISASTER S

D.5 FLOODED AREAS


80
Flooded Areas-Nr Of Affected Families NR OF AFFECTED FAMILIES

81
Flooded Areas-Nr Of Affected Individuals NR OF AFFECTED INDIVIDUALS D.5 FLOODED AREAS

82
Landslide Incident-Nr Of Affected Barangays NR OF AFFECTED BARANGAYS

83
Landslide Incident-Nr Of Affected Families NR OF AFFECTED FAMILIES
INCENT

Landslide Incident-Nr Of Affected


D6. LANDSLIDE

84
NR OF AFFECTED INDIVIDUALS
Individuals

85
Nr Of Impassable Roads NR OF IMPASSABLE ROADS
D.7
D. POST DISASTER STAGE (AFTERMATH OR EFFECTS)

BRIDGES

86
Nr Of Impassable Bridges NR OF IMPASSABLE BRIDGES
AFFECTED
ROADS AND

NR OF BARANGAY WITHOUT

87
Nr Of Barangay Without Electricity
ELECTRICITY
Y
D.8.1

88
Nr Of Barangay Electricity Restored NR OF BARANGAY RESTORED

NR OF BARANGAY WITHOUT

89
Nr Of Barangay Without-Water
WATER

90
Nr Of Barangay Water Supply Restored NR OF BARANGAY RESTORED
ELECTRICIT D.8.2 WATER
COMMUNICATION LINES
D.8 AFFECTED POWER, WATER AND
NR OF BARANGAY WITHOUT

91
Nr Of Barangay Without Telco Signal

CATION LINES
TELCO (SIGNAL)

OWER, WATER AND

92
Nr of Barangay Telco Signal Restored NR OF BARANGAY RESTORED

D.8.3 TELCOM

93
Nr Of Cancelled Flights NR OF CANCELLED FLIGHTS

94
Nr Of Cancelled Ship Vogage NR OF CANCELLED SHIP VOGAGE
D.9

STATUS
SITUATION OR

95
Nr Of Cancelled Bus Voyage NR OF CANCELLED BUS VOYAGE/TRIP
TRANSPORTATION

96
Stranded Passengers-At Airport IN AIRPORTS

97
Stranded Passengers-At Seaport IN SEAPORTS
PASSENGERS
D.10 STRANDED

98
Stranded Passengers-At Terminal IN BUS TERMINALS
Date

Date

31-May-22
Time Of Report

Report
Time Of

9:00 AM PRO1
PRO/UNIT
PRO/UNIT

SUBUNIT/DPO/PPO/CPO
SUBUNIT/DPO/PPO/CPO

CPS/MPS
CPS/MPS

1
Total Strength TOTAL STRENGTH

2
Strength-Nr Of SRR Personnel NR OF SRR PERSONNEL
STRENGTH
A.1 PNP PERSONNEL
STRENGTH

3
Strength-Nr Of RSSF Personnel NR OF RSSF PERSONNEL

NP PERSONNEL

4
Social Media and Media Advisory-TV TV

5
Social Media and Media Advisory-Radio RADIO

6
Social Media and Media Advisory-Internet INTERNET
ADVISORY

7
Social Media and Media Advisory-Messages MESSAGES

8
Social Media and Media Advisory-Print PRINT
A.2 SOCIAL MEDIA AND SOCIAL

9
Directives and Meetings-Dispatched DIRECTIVE DISPATCHED
A.3

AND

Communication Or Other Activities COMMUNICATION/OTHER ACTIVITIES

10
MEETINGS

Conducted CONDUCTED
DIRECTIVES

11
SRR Equipment-Radios RADIOS

12
SRR Equipment-Satelite Phones SATELITE PHONES
A.4

EQUIPMENT

13
SRR Equipment-Others OTHERS
COMMUNICATION
14
SRR Equipment-PNP Blue Box PNP BLUE BOX

15
SRR Equipment-Life Vest LIFE VEST

16
SRR Equipment-Spine Board SPINE BOARD

17
SRR Equipment-Rescue Rope RESCUE ROPE

18
SRR Equipment-Rapelling Set RAPELLING SET

19
SRR Equipment-Floating Ring FLOATING RING

20
SRR Equipment-Megaphone MEGAPHONE

21
SRR Equipment-Chainsaw CHAINSAW
A.5 PNP OWNED SEARCH AND RESCUE ASSETS/EQUIPPAGE

22
SRR Equipment-Portable Generator PORTABLE GENERATOR

23
SRR Equipment-Utility Truck UTILITY TRUCK

24
SRR Equipment-Light Truck LIGHT TRUCK
PNP OWNED SEARCH, RESCUE, AND RETRIEVAL ASSETS/EQUIPPAGE

A.6 PNP OWNED MO


25
SRR Equipment-Ambulance AMBULANCE

TS/EQUIPPAGE

26
SRR Equipment-Motorized Banca MOTORIZED BANCA

SRR Equipment-Rubber boat withou RUBBER BOAT WITHOUT

27
Outboard Motor OUTBOARD MOTOR

28
SRR Equipment-Drum Boat DRUM BOAT
A.6 PNP OWNED MOBILITY ASSETS

29
SRR Equipment-Tactical Watercraft TACTICAL WATERCRAFT

RR Equipment-SAR Vehicle With Water SAR VEHICLE WITH WATER

30
Desalination Machine DESALINATION MACHINE

Nr Of PNP Personnel Deployed In NR OF DEPLOYED PNP PERSONNEL AT

31
Evacuation Center EVACUATON CENTERS

Nr Of PNP WCPD Personnel Deployed In NR OF DEPLOYED WCPD PERSONNEL

32
Evacuation Centers AT EVACUATION CENTER

Nr Of PNP Personnel Deployed In Vacated NR OF DEPLOYED PNP PERSONNEL AT

33
Areas VACATED AREAS

Nr Of PNP Personnel Deployed in Affected NR OF DEPLOYED PNP PERSONNEL AT

34
Areas AFFECTED AREAS

NR OF DEPLOYED PNP SRR PERSONNEL

35
Nr Of SRR Personnel Deployed
AT AFFECTED AREAS
B. DISASTER RESPONSES S

B.1 DEPLOYMENT OF PNP PERSONN


Nr Of PNP Personnel Deployed In Stranded NR OF DEPLOYED PNP

36
Areas-Airport PERSONNEL AT AIRPORT

Nr Of PNP Personnel Deployed In Stranded NR OF DEPLOYED PNP

37
Area-Seaport PERSONNEL AT SEAPORT

AREAS
NR OF DEPLOYED PNP
Nr Of PNP Personnel Deployed In Stranded

38
YMENT OF PNP PERSONNEL

PERSONNEL AT BUS
B.1.6 AT STRANDED
Area-Bus Terminal
TERMINAL
TOTAL NR OF DEPLOYED

39
Total Nr Of Personnel Deployed
PERSONNEL
B.1.7

TOTAL NR OF RSSF
TION OF

40
Nr Of RSSF Personnel
PERSONNEL
RECAPITULA

Nr Of Evacuation Center Established NR OF EVACUATION CENER

41
Established By LGU ESTABLISHED BY LGU
DISASTER RESPONSES STAGE (DURING THE TYPHOON)

NR OF EVACUATION

42
Nr Of Evacuation Centers Occupied
CENTERS OCCUPIED
CENTER

NR OF VACANT EVACUATION

43
Nr Of Vacant Evacuation Centers
CENTERS
NR OF EVACUATION
RELATED DATA

44
Nr Of Evacuess By Family BY FAMILY
B.2 EVACUATION CENTERS

NR OF

45
Nr Of Evacuess Individually PER INDIVIDUAL
EVACUESS

NUMBER OF RESCUE

46
Nr Of Rescue Operations Conducted
OPERATIONS CONDUCTED
RESCUE
OPERATIONS
C.1 RESPONSE OPERAT
NR OF RESCUED

RESCUE

47
Nr Of Rescued Individuals
INDIVIDUALS

NR OF RETRIEVAL

48
Nr Of Retrieval Operations Conducted
OPERATIONS CONDUCTED

NR OF RETRIEVED BODY OR

49
Nr Of Retrieved Body Or Cadaver
C.1 RESPONSE OPERATIONS

RETRIEVAL
CADAVER

NR OF RELIEF OPERATIONS OPERATIONS OPERATIONS

50
Nr Of Relief Operations Conducted
CONDUCTED
NR OF BENEFECIARIES
Nr Of Individuals As Relief Operations

51
(INDIVIDUALS) OF RELIEF
Beneficiaries
OPERATIONS
OPERATIONS
NR OF RELIEF

52
Total Estimated Amount TOTAL ESTIMATED AMOUNT

53
Nr Of Reported Looting Incidents NR OF REPORTED LOOTING INCIDENTS
C.2 RELIEF OPERATIONS (DURING)
ORDER

Nr Of Arrested Individuals Due To Looting NR OF ARRESTED INDIVIDUALS DUE TO

54
Incidents LOOTING INCIDENTS
C.3 LAW AND

NR OF ROAD CLEARING OPERATIONS

55
Nr Of Road Clearing Operations Conducted
CONDUCTED
C.4 ROAD
CLEARING
OPERATIONS

56
Nr Of Warehouse NR OF WAREHOUSES
S

Nr Of PNP Personnel Deployed As

57
Warehouse Security
C. RESPONSE OPERATIONS

WAREHOUSE

NR OF PNP PERSONNEL DEPLOYED


S
C.5 Security Operat
NR OF GROCERIES OR RATIONS

58
Nr Of Groceries Or Supermarket SUPERMARKETS

OR

ETS
Nr Of PNP Personnel Deployed As Groceries NR OF PNP PERSONNEL

59
DEPLOYED

GROCERIES
Or Supermarket Security

SUPERMARK

60
Nr Of Gas Station NR OF GAS STATIONS
Stations/Banks)

GAS
Nr Of PNP Personnel Deployed As Gas

61
Nr Of PNP Personnel Deployed
STATIONS
Station Security

62
Nr Of Banks NR OF BANKS
C.5 Security Operations(WarehouseS/Groceries/Gas

BANKS

63
Nr Of Personnel Deployed As Bank Security
NR OF PNP PERSONNEL DEPLOYED

64
Nr Of Donors NR OF DONORS

65
Nr Of Recipients Or Beneficiaries NR OF RECIPIENTS OR BENEFICIARIES
C.6 DONATIONS

66
Estimated Amount Of Donation ESTIMATED AMOUNT OF DONATION

67
Affected Personnel-PNP PNP
D.1

PNP/NUP

68
Affected Personnel -NUP NUP
AFFECTED
69
Nr Of Damaged PNP Building NR OF DAMAGED PNP BUILDING

URE
ESTIMATED COST OF DAMAGED PNP

70
Estimaged Cost Of Damaged PNP Building
BUILDING
D.2 DAMAGED
INFRASTRUCT

71
Nr Of Damaged PNP Equipment NR OF DAMAGED PNP EQUIPMENT
D.3

PNP

ESTIMATED COST OF DAMAGE TO PNP

72
Estimated Cost of Damaged PNP Equipment
DAMAGED

EQUIPMENT
EQUIPMENT

73
Casualties-PNP-Or-NUP-Dead DEAD

74
Casualties-PNP-Or-NUP-Injured INJURED
PNP OR NUP

75
Casualties-PNP-Or-NUP-Missing MISSING

76
Casualties-Civilian-Dead DEAD
D.4 CASUALTIES

77
Casualties-Civilian-Injured INJURED
CIVILIAN

78
Casualties-Civilian-Missing MISSING

79
Flooded Areas-Nr Of Affected Barangays NR OF AFFECTED BARANGAYS
D. POST DISASTER S

D.5 FLOODED AREAS


80
Flooded Areas-Nr Of Affected Families NR OF AFFECTED FAMILIES

81
Flooded Areas-Nr Of Affected Individuals NR OF AFFECTED INDIVIDUALS D.5 FLOODED AREAS

82
Landslide Incident-Nr Of Affected Barangays NR OF AFFECTED BARANGAYS

83
Landslide Incident-Nr Of Affected Families NR OF AFFECTED FAMILIES
INCENT

Landslide Incident-Nr Of Affected


D6. LANDSLIDE

84
NR OF AFFECTED INDIVIDUALS
Individuals

85
Nr Of Impassable Roads NR OF IMPASSABLE ROADS
D.7
D. POST DISASTER STAGE (AFTERMATH OR EFFECTS)

BRIDGES

86
Nr Of Impassable Bridges NR OF IMPASSABLE BRIDGES
AFFECTED
ROADS AND

NR OF BARANGAY WITHOUT

87
Nr Of Barangay Without Electricity
ELECTRICITY
Y
D.8.1

88
Nr Of Barangay Electricity Restored NR OF BARANGAY RESTORED

NR OF BARANGAY WITHOUT

89
Nr Of Barangay Without-Water
WATER

90
Nr Of Barangay Water Supply Restored NR OF BARANGAY RESTORED
ELECTRICIT D.8.2 WATER
COMMUNICATION LINES
D.8 AFFECTED POWER, WATER AND
NR OF BARANGAY WITHOUT

91
Nr Of Barangay Without Telco Signal

CATION LINES
TELCO (SIGNAL)

OWER, WATER AND

92
Nr of Barangay Telco Signal Restored NR OF BARANGAY RESTORED

D.8.3 TELCOM

93
Nr Of Cancelled Flights NR OF CANCELLED FLIGHTS

94
Nr Of Cancelled Ship Vogage NR OF CANCELLED SHIP VOGAGE
D.9

STATUS
SITUATION OR

95
Nr Of Cancelled Bus Voyage NR OF CANCELLED BUS VOYAGE/TRIP
TRANSPORTATION

96
Stranded Passengers-At Airport IN AIRPORTS

97
Stranded Passengers-At Seaport IN SEAPORTS
PASSENGERS
D.10 STRANDED

98
Stranded Passengers-At Terminal IN BUS TERMINALS
Date

Date

31-May-22
Time Of Report

Report
Time Of

9:00 AM NCRPO
PRO/UNIT
PRO/UNIT

SUBUNIT/DPO/PPO/CPO
SUBUNIT/DPO/PPO/CPO

CPS/MPS
CPS/MPS

1
Total Strength TOTAL STRENGTH

2
Strength-Nr Of SRR Personnel NR OF SRR PERSONNEL
STRENGTH
A.1 PNP PERSONNEL
STRENGTH

3
Strength-Nr Of RSSF Personnel NR OF RSSF PERSONNEL

NP PERSONNEL

4
Social Media and Media Advisory-TV TV

5
Social Media and Media Advisory-Radio RADIO

6
Social Media and Media Advisory-Internet INTERNET
ADVISORY

7
Social Media and Media Advisory-Messages MESSAGES

8
Social Media and Media Advisory-Print PRINT
A.2 SOCIAL MEDIA AND SOCIAL

9
Directives and Meetings-Dispatched DIRECTIVE DISPATCHED
A.3

AND

Communication Or Other Activities COMMUNICATION/OTHER ACTIVITIES

10
MEETINGS

Conducted CONDUCTED
DIRECTIVES

11
SRR Equipment-Radios RADIOS

12
SRR Equipment-Satelite Phones SATELITE PHONES
A.4

EQUIPMENT

13
SRR Equipment-Others OTHERS
COMMUNICATION
14
SRR Equipment-PNP Blue Box PNP BLUE BOX

15
SRR Equipment-Life Vest LIFE VEST

16
SRR Equipment-Spine Board SPINE BOARD

17
SRR Equipment-Rescue Rope RESCUE ROPE

18
SRR Equipment-Rapelling Set RAPELLING SET

19
SRR Equipment-Floating Ring FLOATING RING

20
SRR Equipment-Megaphone MEGAPHONE

21
SRR Equipment-Chainsaw CHAINSAW
A.5 PNP OWNED SEARCH AND RESCUE ASSETS/EQUIPPAGE

22
SRR Equipment-Portable Generator PORTABLE GENERATOR

23
SRR Equipment-Utility Truck UTILITY TRUCK

24
SRR Equipment-Light Truck LIGHT TRUCK
PNP OWNED SEARCH, RESCUE, AND RETRIEVAL ASSETS/EQUIPPAGE

A.6 PNP OWNED MO


25
SRR Equipment-Ambulance AMBULANCE

TS/EQUIPPAGE

26
SRR Equipment-Motorized Banca MOTORIZED BANCA

SRR Equipment-Rubber boat withou RUBBER BOAT WITHOUT

27
Outboard Motor OUTBOARD MOTOR

28
SRR Equipment-Drum Boat DRUM BOAT
A.6 PNP OWNED MOBILITY ASSETS

29
SRR Equipment-Tactical Watercraft TACTICAL WATERCRAFT

RR Equipment-SAR Vehicle With Water SAR VEHICLE WITH WATER

30
Desalination Machine DESALINATION MACHINE

Nr Of PNP Personnel Deployed In NR OF DEPLOYED PNP PERSONNEL AT

31
Evacuation Center EVACUATON CENTERS

Nr Of PNP WCPD Personnel Deployed In NR OF DEPLOYED WCPD PERSONNEL

32
Evacuation Centers AT EVACUATION CENTER

Nr Of PNP Personnel Deployed In Vacated NR OF DEPLOYED PNP PERSONNEL AT

33
Areas VACATED AREAS

Nr Of PNP Personnel Deployed in Affected NR OF DEPLOYED PNP PERSONNEL AT

34
Areas AFFECTED AREAS

NR OF DEPLOYED PNP SRR PERSONNEL

35
Nr Of SRR Personnel Deployed
AT AFFECTED AREAS
B. DISASTER RESPONSES S

B.1 DEPLOYMENT OF PNP PERSONN


Nr Of PNP Personnel Deployed In Stranded NR OF DEPLOYED PNP

36
Areas-Airport PERSONNEL AT AIRPORT

Nr Of PNP Personnel Deployed In Stranded NR OF DEPLOYED PNP

37
Area-Seaport PERSONNEL AT SEAPORT

AREAS
NR OF DEPLOYED PNP
Nr Of PNP Personnel Deployed In Stranded

38
YMENT OF PNP PERSONNEL

PERSONNEL AT BUS
B.1.6 AT STRANDED
Area-Bus Terminal
TERMINAL
TOTAL NR OF DEPLOYED

39
Total Nr Of Personnel Deployed
PERSONNEL
B.1.7

TOTAL NR OF RSSF
TION OF

40
Nr Of RSSF Personnel
PERSONNEL
RECAPITULA

Nr Of Evacuation Center Established NR OF EVACUATION CENER

41
Established By LGU ESTABLISHED BY LGU
DISASTER RESPONSES STAGE (DURING THE TYPHOON)

NR OF EVACUATION

42
Nr Of Evacuation Centers Occupied
CENTERS OCCUPIED
CENTER

NR OF VACANT EVACUATION

43
Nr Of Vacant Evacuation Centers
CENTERS
NR OF EVACUATION
RELATED DATA

44
Nr Of Evacuess By Family BY FAMILY
B.2 EVACUATION CENTERS

NR OF

45
Nr Of Evacuess Individually PER INDIVIDUAL
EVACUESS

NUMBER OF RESCUE

46
Nr Of Rescue Operations Conducted
OPERATIONS CONDUCTED
RESCUE
OPERATIONS
C.1 RESPONSE OPERAT
NR OF RESCUED

RESCUE

47
Nr Of Rescued Individuals
INDIVIDUALS

NR OF RETRIEVAL

48
Nr Of Retrieval Operations Conducted
OPERATIONS CONDUCTED

NR OF RETRIEVED BODY OR

49
Nr Of Retrieved Body Or Cadaver
C.1 RESPONSE OPERATIONS

RETRIEVAL
CADAVER

NR OF RELIEF OPERATIONS OPERATIONS OPERATIONS

50
Nr Of Relief Operations Conducted
CONDUCTED
NR OF BENEFECIARIES
Nr Of Individuals As Relief Operations

51
(INDIVIDUALS) OF RELIEF
Beneficiaries
OPERATIONS
OPERATIONS
NR OF RELIEF

52
Total Estimated Amount TOTAL ESTIMATED AMOUNT

53
Nr Of Reported Looting Incidents NR OF REPORTED LOOTING INCIDENTS
C.2 RELIEF OPERATIONS (DURING)
ORDER

Nr Of Arrested Individuals Due To Looting NR OF ARRESTED INDIVIDUALS DUE TO

54
Incidents LOOTING INCIDENTS
C.3 LAW AND

NR OF ROAD CLEARING OPERATIONS

55
Nr Of Road Clearing Operations Conducted
CONDUCTED
C.4 ROAD
CLEARING
OPERATIONS

56
Nr Of Warehouse NR OF WAREHOUSES
S

Nr Of PNP Personnel Deployed As

57
Warehouse Security
C. RESPONSE OPERATIONS

WAREHOUSE

NR OF PNP PERSONNEL DEPLOYED


S
C.5 Security Operat
NR OF GROCERIES OR RATIONS

58
Nr Of Groceries Or Supermarket SUPERMARKETS

OR

ETS
Nr Of PNP Personnel Deployed As Groceries NR OF PNP PERSONNEL

59
DEPLOYED

GROCERIES
Or Supermarket Security

SUPERMARK

60
Nr Of Gas Station NR OF GAS STATIONS
Stations/Banks)

GAS
Nr Of PNP Personnel Deployed As Gas

61
Nr Of PNP Personnel Deployed
STATIONS
Station Security

62
Nr Of Banks NR OF BANKS
C.5 Security Operations(WarehouseS/Groceries/Gas

BANKS

63
Nr Of Personnel Deployed As Bank Security
NR OF PNP PERSONNEL DEPLOYED

64
Nr Of Donors NR OF DONORS

65
Nr Of Recipients Or Beneficiaries NR OF RECIPIENTS OR BENEFICIARIES
C.6 DONATIONS

66
Estimated Amount Of Donation ESTIMATED AMOUNT OF DONATION

67
Affected Personnel-PNP PNP
D.1

PNP/NUP

68
Affected Personnel -NUP NUP
AFFECTED
69
Nr Of Damaged PNP Building NR OF DAMAGED PNP BUILDING

URE
ESTIMATED COST OF DAMAGED PNP

70
Estimaged Cost Of Damaged PNP Building
BUILDING
D.2 DAMAGED
INFRASTRUCT

71
Nr Of Damaged PNP Equipment NR OF DAMAGED PNP EQUIPMENT
D.3

PNP

ESTIMATED COST OF DAMAGE TO PNP

72
Estimated Cost of Damaged PNP Equipment
DAMAGED

EQUIPMENT
EQUIPMENT

73
Casualties-PNP-Or-NUP-Dead DEAD

74
Casualties-PNP-Or-NUP-Injured INJURED
PNP OR NUP

75
Casualties-PNP-Or-NUP-Missing MISSING

76
Casualties-Civilian-Dead DEAD
D.4 CASUALTIES

77
Casualties-Civilian-Injured INJURED
CIVILIAN

78
Casualties-Civilian-Missing MISSING

79
Flooded Areas-Nr Of Affected Barangays NR OF AFFECTED BARANGAYS
D. POST DISASTER S

D.5 FLOODED AREAS


80
Flooded Areas-Nr Of Affected Families NR OF AFFECTED FAMILIES

81
Flooded Areas-Nr Of Affected Individuals NR OF AFFECTED INDIVIDUALS D.5 FLOODED AREAS

82
Landslide Incident-Nr Of Affected Barangays NR OF AFFECTED BARANGAYS

83
Landslide Incident-Nr Of Affected Families NR OF AFFECTED FAMILIES
INCENT

Landslide Incident-Nr Of Affected


D6. LANDSLIDE

84
NR OF AFFECTED INDIVIDUALS
Individuals

85
Nr Of Impassable Roads NR OF IMPASSABLE ROADS
D.7
D. POST DISASTER STAGE (AFTERMATH OR EFFECTS)

BRIDGES

86
Nr Of Impassable Bridges NR OF IMPASSABLE BRIDGES
AFFECTED
ROADS AND

NR OF BARANGAY WITHOUT

87
Nr Of Barangay Without Electricity
ELECTRICITY
Y
D.8.1

88
Nr Of Barangay Electricity Restored NR OF BARANGAY RESTORED

NR OF BARANGAY WITHOUT

89
Nr Of Barangay Without-Water
WATER

90
Nr Of Barangay Water Supply Restored NR OF BARANGAY RESTORED
ELECTRICIT D.8.2 WATER
COMMUNICATION LINES
D.8 AFFECTED POWER, WATER AND
NR OF BARANGAY WITHOUT

91
Nr Of Barangay Without Telco Signal

CATION LINES
TELCO (SIGNAL)

OWER, WATER AND

92
Nr of Barangay Telco Signal Restored NR OF BARANGAY RESTORED

D.8.3 TELCOM

93
Nr Of Cancelled Flights NR OF CANCELLED FLIGHTS

94
Nr Of Cancelled Ship Vogage NR OF CANCELLED SHIP VOGAGE
D.9

STATUS
SITUATION OR

95
Nr Of Cancelled Bus Voyage NR OF CANCELLED BUS VOYAGE/TRIP
TRANSPORTATION

96
Stranded Passengers-At Airport IN AIRPORTS

97
Stranded Passengers-At Seaport IN SEAPORTS
PASSENGERS
D.10 STRANDED

98
Stranded Passengers-At Terminal IN BUS TERMINALS
12:00 AM
3:00 AM
6:00 AM
9:00 AM
12:00 PM
3:00 PM
6:00 PM
9:00 PM
12:00 AM
3:00 AM
6:00 AM
9:00 AM
12:00 PM
3:00 PM
6:00 PM
9:00 PM
12:00 AM
3:00 AM
6:00 AM
9:00 AM
12:00 PM
3:00 PM
6:00 PM
9:00 PM

You might also like