You are on page 1of 3

List of proposed PPP projects to be launched in Vietnam

No 1

Projects Highway Ninh Binh Thanh Hoa

Preliminary Information About 126,7km long with 6 lanes, the road passes Ninh Binh, Nam Dinh and Thanh Hoa provinces. The total investment is VND 33,000 billion. Ministry of Transport approved the final report and project proposal is expected in 2011. The WB is working on procedures for getting the funding from The Public Private Infrastructure Advisory Fund (PPIAF) do the FS for the Ninh Bnh- Thanh HaBi V t Highway Project under PPP form. Estimated 25 million passengers/year located in Dong Nai province. The investment for the project is USD 1,403 million. MoT submitted the master plan to the PM. This is a category A-highway with designed speed 80-120km/h, about 200km long with 4 lanes. The road passes Dong Nai and Lam Dong provinces. The investment for the project is VND 48,324 billion. Ministry of Transport approved mid-term report and proposal is expected to be approved in 2011. This is a category A-highway with designed speed 80-120km/h, about 128km long with 4-6 lanes. The road locates in Quang Ninh province. The investment for the projects is about VND 25,000 billion. At this moment, a technical assistance project has been carried out to set up investment project. MoT approved mid-term report of Technical Assistance Project. Located in Can Tho City, Phase 1: 500,000 m3/day. Phase 2: 1,000,000 m day. The Plant is expected to supply clean water for Can Tho City, Soc Trang Province, West corridor of Hau River and supporting the North of Hau River.
3/

International Airport Long Thanh

Highway Dau Giay Lien Khuong

Highway Ha Long Mong Cai

Song Hau River Water Plant No. 1

Wate plant supplying clean water from Red River surface water Phu Xuyen General Hospital (1000 beds)

Located in ng Anh district of Hanoi with design capacity is 100,000-150,000 m3/ day. Investment for the project is VND 2,000 billion. Located in Phu Xuyen district- Hanoi with capacity of 1,000 beds. Investment for the project is VND 3,400 billion. Hanoi Peoples Committee has reported to the Prime Minister for investment under Build-transfer contract (statement no. 09/TTr-UBND dated 30/3/2011). Located in Gia Lam district- Hanoi with capacity of 1,000 beds. Investment for the project is VND 3,400 billion. Hanoi Peoples Committee has reported to the Prime Minister for investment under Build-transfer contract (statement no. 09/TTr-UBND dated 30/3/2011).

Gia Lam General Hospital (1000 beds)

www.hoganlovells.com
"Hogan Lovells" or the "firm" refers to the international legal practice comprising Hogan Lovells International LLP, Hogan Lovells US LLP, Hogan Lovells Worldwide Group (a Swiss Verein), and their affiliated businesses, each of which is a separate legal entity. Hogan Lovells International LLP is a limited liability partnership registered in England and Wales with registered number OC323639. Registered office and principal place of business: Atlantic House, Holborn Viaduct, London EC1A 2FG. Hogan Lovells US LLP is a limited liability partnership registered in the District of Columbia. The word "partner" is used to refer to a member of Hogan Lovells International LLP or a partner of Hogan Lovells US LLP, or an employee or consultant with equivalent standing and qualifications, and to a partner, member, employee or consultant in any of their affiliated businesses who has equivalent standing. Rankings and quotes from legal directories and other sources may refer to the former firms of Hogan & Hartson LLP and Lovells LLP. Where case studies are included, results achieved do not guarantee similar outcomes for other clients. New York State Notice: Attorney Advertising. Hogan Lovells 2011. All rights reserved.

Highway Ben Luc Hop Phuoc

This is an urban highway with designed speed 80-100km/h, about 25km long with 4-6 lanes. The road connects Long An province and Ho Chi Minh City. Investment for the project is about VND 15,000 billion. Ministry of Transport is developing the project and already approved the first report. This is a category A- highway with designed speed 100-120km/h, about 93km long with 4-6 lanes. Investment is about VND 23,000 billion. Ministry of Transport approved mid-term report and project proposal is expected to be approved in 2011. The WB is working on procedures for getting the funding from The Public Private Infrastructure Advisory Fund (PPIAF) do the FS for the Ninh Bnh- Thanh HaBi V t Highway Project under the PPP form.

10

Highway Nghi Son (Thanh Hoa) Bai Vot (Ha Tinh)

11

Ho Chi Minh Highway, Cam Lo La This is a category B-highway, designed speed 80km/h, 103km with 4 lanes (2 Son Section lanes to be completed first), It locates in Quang Tri and Thua Thien Hue provinces. Investment is about VND 16,000 billion. Ministry of Transport is developing the project and approval is expected in 2011. Hau Giang River Thermal Power Plan No.1, Hau Giang Province Quang Tri Thermoelectricity Project, Quang Tri Province Quynh Lap Thermoelectricity Project, Nghe An Province Song Hau River Water Plant No. 2 Located in Chau Thanh district, An Giang Province, Phase 1: 1,000,000 m /day. Phase 2: 2,000,000 m /day. The Plant supplies water for Can Tho, An Giang, Kien Giang, Ca Mau and one part of Hau Giang, Bac Lieu.
3 3

12

Capacity: 1200MW, 2 turbines (600MW/unit). Estimate total investment capital: 2 billion USD/project.

13

14

15

16

Song Hau River Water Plant No. 3

Located in Chau Doc district, An Giang Province. Phase 1: 200,000 m /day. Phase 2: 500,000 m /day. The Plant supplies water for An Giang and Kien Giang Provinces, prioritizing urban areas along the South-West border.
3

17

Ngoc Hoi bridge and approach ramps on both ends on 3.5 road

Connects Thanh Tri and Gia Lam district at about 5km long. Investment is about VND 10,000 billion. Planning project in the Hanoi Capital Construction Master Plan is in place. Located in Thuong Tin district- Hanoi, 10-20ha wide. Investment is about VND 300 billion. Planning project in the Hanoi Capital Construction Master Plan is in place.

18

Southern Logistics Center

19

Eastern Logistics Center

Located in Gia Lam district- Hanoi, 10-20ha wide. Investment is about VND 300 billion. Planning project in the Hanoi Capital Construction Master Plan is in place.

20

Son Tay Port

Located in Son Tay district- Hanoi, 0.5-1ha wide. Investment is about VND 400 million. Located in Thuong Tin district- Hanoi, 1-1.5ha wide. Investment is about VND 300 billion. Located in Thanh Tri district- Hanoi, 1.5-2ha wide. Investment is about VND 500 billion. Not yet defined exact location. Received technical support on development of connecting stations and surrounding areas from Japan.

21

Hong Van Port

22

Khuyen Luong Port

23

Investment in train terminals connecting to urban railways

24

Extension ofding National road No.22 (trans-Asia road)

Goes through Dist.12, Hoc Mon, Cu Chi of HCMC. 20km long with 4 lanes. Estimated construction period is 4 years, to be completed by 2017. Operation in 30 years. Investment is about VND 12,850 billion.

Source: Vietnams Ministry of Planning and Investment PPP Taskforce Team Contacts If you would like further information please contact a person mentioned below or the person with whom you usually deal. James Harris Managing Partner, Singapore +65 6302 2552 james.harris@hoganlovells.com Stanley Boots Consultant, Hanoi/ Hong Kong +84 4 3946 1146 / +852 2840 5065 stanley.boots@hoganlovells.com June 2011