You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14

NOMENCLATURE:
EL = EXCAVATION LEVEL
TCL = TOP CONCRETE LEVEL
A

A
BCL = BOTTOM CONCRETE LEVEL
BOF = BOTTOM OF FOUNDATION
NGL = NATURAL GROUND LEVEL
FFL = FINISH FLOOR LEVEL
E.J. = EXPANSION JOINT
73 73 TSL = TOP STEEL LEVEL
2800 260 140 522 73 2800 73 260 140 522
TGL = TOP GRATING LEVEL
1400 1400 272 250 1400 1400 272 250 TPL = TOP PLATE LEVEL FOR EMBEDS
BPL = BOTTOM OF PLATE LEVEL
TOTAL LE TOTAL LE
B

B
4

5
NDON TEND ON
NG TH OF TE TH OF TE NG TH OF TE NGTH OF
FOR EMBEDS
FRONT NDON TO TAL LENG EPLAT R=9000MM FRONT NDON TOTAL LE ATE
150
FACE OF ANCH ANCHOR 150
FACE OF CHOR PL
FACE OF 150 ANCHOR CE OF AN 150

70 290 70
OR PLAT
E FRONT PLATE FRONT
FA SYMBOLS:
3 400 70 290 70 35

35

35
430
CONCRETE REALISED
TCL= 86.000 57

45
3 WITH SLIDING FORMWORK

70 290 70
250

250
70

70
73 C 35/45 / F'C = 357 KG/CM²
522

522
430

430

430
290

290
900
522

522
CONCRETE CAST-IN-SITU

00MM

0 0M M
INSIDE 2

45
272
272

C 30/37 / F'C = 306 KG/CM²


73
R=9000MM

570
OUTSIDE

70

70
CONCRETE CAST-IN-SITU

R=99

R=99
57

57
430
140

140
140 C 25/30 / F'C = 255 KG/CM²
610
72 OUTSIDE
C

C
1250
INSIDE SLOPED CONCRETE

70 290 70
R=8650MM 1 C 25/30 / F'C = 255 KG/CM²

430
57 70 290 70 35

260
400
LEAN CONCRETE

45

60MM
1

M
750

0MM
60M
C 12/15 / F'C = 122 KG/CM²
610

400M

400M

70 290 70
71

R=92

R=92
R=900
750 57 290 70 REFILL COMPACTED

430
R=9

R=9

45
70 430 35 71

0MM
BCL= 84.500 PENDING

R=865
TRANSITION OF CIRCLE 430

5
4
INTO STRAIGHT LINE REVISIONS
D

D
TRANSITION OF CIRCLE 1290 1290 1290 1290
INTO STRAIGHT LINE

NOTES:
DETAIL BUTTRESS (4X) SECTION 4 - 4 DETAIL BUTTRESS (4X) SECTION 5 - 5 - CONCRETE QUALITIES:
ACCORDING TO SYMBOLS.
SCALE 1:25 SCALE 1:25 SCALE 1:25 SCALE 1:25 - STEEL REINFORCEMENT:
- REBAR Ø < 16MM: Fy = 280 MPa.
WALL T=750MM WALL T=400MM - REBAR Ø ≥ 16MM: Fy = 420 MPa.
- ANCHOR BOLTS: Q345B,
E

E
IF NOT SPECIFIED OTHERWISE.
- EMBEDDED STEEL PARTS: Q235B,
IF NOT SPECIFIED OTHERWISE.
- CONCRETE COVER:
ACCORDING TO SPECIFICATIONS
ON REINFORCEMENT DRAWINGS.
- ALL CONCRETE CORNERS
SHALL BE CHAMFERED
WITH A LENGTH APPROX. 25MM.
F

F
- DIMENSION IN MM, LEVELS IN M

73 1400 1400 73

IN THIS AREA TENDONS TO BE IN THIS AREA TENDONS TO BE APPROVED


SHIFTED DOWNWARDS FOR MIN. SHIFTED UPWARDS FOR MIN. FOR
CONSTRUCTION
R=9400MM 1/2 DIAMETER OF THE DUCTS 1/2 DIAMETER OF THE DUCTS
G

G
400
260 140

45
INSIDE OUTSIDE

90
Approved Approved as Noted

45
TENDONS
1290 1290 For Information Revised as Noted

VERTICAL By: RTM Date: 07/10/2018


REINFORCEMENT

R=9000MM TENDON HORIZONTAL APPROVED


H

H
AXIS OF TENDON

45
PROPOSAL:
HOOP SUPPORTING REBARS Ø12MM,
FOR

90
REINFORCEMENT SPACING E=800MM
45

(HORIZONTAL) NOT INCLUDED IN


TENDON HORIZONTAL
CONSTRUCTION
REINFORCEMENT OF WALL

PRINCIPAL VERTICAL SECTION 45°


NORTH

45
45

OF PLANT
I

I
32°
OF CIRCULAR WALL 90 ASTRONOMIC
NORTH PREVAILING WIND
SCALE 1:25 1290 1290 (MAINLY NORTHEAST)

E 1032.300
SUPPORTING OF TENDONS TRANSITION FOR
VERTICAL SHIFTING IN THIS AREA TENDONS TO BE IN THIS AREA TENDONS TO BE N
(IDENTICAL WITH SHIFTED DOWNWARDS FOR MIN. SHIFTED UPWARDS FOR MIN.
TRANSITION OF 1/2 DIAMETER OF THE DUCTS 1/2 DIAMETER OF THE DUCTS SUN PATH
HORIZONTAL SHIFTING)
J

J
360° 0°

°
45
300

m
°

0m
400

00
PRINCIPAL ARRANGEMENT OF TENDONS AT PIER

r=9
270° 90°
N 997.000 A 800
0
Ø1
SCALE 1:25 400

120
°


22
K

K
180°

KEY PLAN
SCALE 1:500
L

L
CONSULTANT: APPROVED BY: DESIGN: PROJECT: REV. REVISION NOTE BY DATE REFERENCES TITLE SUPPLIER DESIGNED: VETTER DRAWN: VETTER CHECKED: WENTZ APPROVED: WENTZ 17A052 127 0
SOLID K4 1 441-03-04-016 PRESTRESSING TENDONS P&L DATE: 20/10/2017 DATE: 20/10/2017 DATE: 20/10/2017 DATE: 20/10/2017 PROJECT No: 15PH00600-C01
2 441-03-04-017 PRESTRESSING TENDONS, DETAILS P&L SHEET TITLE:
OWNER: SCALE: 1:25 DIM: MM
STRUCTURAL ENGINEER

Mandriva Builders Inc. Ground Floor, Unit-C, A&P Building, PTR. NO. REG. NO.
CEMEX PHILIPPINES - SOLID CEMENT CORPORATION 3 FORMWORK DRAWING RAW MEAL SILO DRAWING No:
1500 Perdigon St. Cor. Figueroa St. Paco, Manila, Philippines 1007 4 PRESTRESSING TENDONS
Website: www.mandrivabuilders.com ISSUED ON ISSUED AT 中国建材
T.I.N.
LOCATION:
TAGBAC, SAN JOSE, ANTIPOLO CITY 5 DETAILS 441-03-04- 017 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Without authors permission this drawing may not be
published, copied or modified, or used for other projects. STAND: 06.04.2018

H/B 610/910 (0,56m²) Allplan 2017

You might also like