Professional Documents
Culture Documents
Copyright © 2021.
AVEVA Solutions Limited and its subsidiaries. Page 2 of 33
All rights reserved.
Training Setup
TM-1800
Revision Log
DATE REVISION DESCRIPTION OF REVISION AUTHOR REVIEWED APPROVED
Updates
Change highlighting will be employed for all revisions. Where new or changed information is presented,
section headings will be highlighted in Yellow.
Suggestion / Problems
If you have a suggestion about this manual or the system to which it refers please report it to AVEVA Training
& Product Support at CSE@aveva.com
This manual provides documentation relating to products to which you may not have access or which may not
be licensed to you. For further information on which products are licensed to you please refer to your licence
conditions.
Copyright © 2021.
AVEVA Solutions Limited and its subsidiaries. Page 3 of 33
All rights reserved.
Training Setup
TM-1800
Disclaimer
1.1 AVEVA does not warrant that the use of the AVEVA software will be uninterrupted, error-free or free
from viruses.
1.2 AVEVA shall not be liable for: loss of profits; loss of business; depletion of goodwill and/or similar
losses; loss of anticipated savings; loss of goods; loss of contract; loss of use; loss or corruption of data
or information; any special, indirect, consequential or pure economic loss, costs, damages, charges or
expenses which may be suffered by the user, including any loss suffered by the user resulting from
the inaccuracy or invalidity of any data created by the AVEVA software, irrespective of whether such
losses are suffered directly or indirectly, or arise in contract, tort (including negligence) or otherwise.
1.3 AVEVA's total liability in contract, tort (including negligence), or otherwise, arising in connection with
the performance of the AVEVA software shall be limited to 100% of the licence fees paid in the year
in which the user's claim is brought.
1.4 Clauses 1.1 to 1.3 shall apply to the fullest extent permissible at law.
1.5 In the event of any conflict between the above clauses and the analogous clauses in the software
licence under which the AVEVA software was purchased, the clauses in the software licence shall take
precedence.
Copyright Notice
All intellectual property rights, including but not limited to, copyright in this Training Guide and the associated
documentation belongs to or is licensed to AVEVA Solutions Limited or its affiliates.
All rights are reserved to AVEVA Solutions Limited and its affiliates companies. The information contained in
this Training Guide and associated documentation is commercially sensitive, and shall not be adapted, copied,
reproduced, stored in a retrieval system, or transmitted in any form or medium by any means (including
photocopying or electronic means) without the prior written permission of AVEVA Solutions Limited. Where
such permission is granted, AVEVA Solutions Limited expressly requires that the Disclaimer included in this
Training Guide and this Copyright notice is prominently displayed at the beginning of every copy that is made.
Licenses issued by the Copyright Licensing Agency or any other reproduction rights organisation do not apply.
If any unauthorised acts are carried out in relation to this copyright work, a civil claim for damages may be
made and or criminal prosecution may result.
AVEVA Solutions Limited and its affiliate companies shall not be liable for any breach or infringement of a third
party's intellectual property rights arising from the use of this Training Guide and associated documentation.
Copyright © 2021.
AVEVA Solutions Limited and its subsidiaries. Page 4 of 33
All rights reserved.
Training Setup
TM-1800
Trademark Notice
AVEVA™, AVEVA Bocad™, [AVEVA Tags], Tribon and all AVEVA product and service names are trademarks of
AVEVA Group plc or its subsidiaries.
Use of these trademarks, product and service names belonging to AVEVA Group plc or its subsidiaries is strictly
forbidden, without the prior written permission of AVEVA Group plc or AVEVA Solutions Limited. Any
unauthorised use may result in a legal claim being made against you.
All other trademarks belong to their respective owners and cannot be used without the permission of the
owner.
Copyright © 2021.
AVEVA Solutions Limited and its subsidiaries. Page 5 of 33
All rights reserved.
Training Setup
TM-1800
Table of Contents
1 Introduction ...................................................................................................................................... 7
Target Audience / Course Type ................................................................................................................................. 7
Aim ........................................................................................................................................................................... 7
Objectives ................................................................................................................................................................. 7
Prerequisites............................................................................................................................................................. 7
Course Structure ....................................................................................................................................................... 7
Using this Guide ........................................................................................................................................................ 7
2 Installing Training Setup .................................................................................................................... 9
3 Creating an Empty Project ............................................................................................................... 11
3.1 Starting the Project Creation Wizard ............................................................................................................11
3.2 Entry to an AVEVA Project ............................................................................................................................12
4 Setting up the Training Project......................................................................................................... 13
4.1 Training Setup Overview ..............................................................................................................................13
4.2 Training Setup form ......................................................................................................................................14
4.3 Training Setup Options .................................................................................................................................14
4.3.1 Training Setup tab ....................................................................................................................................... 15
4.3.2 Supports tab................................................................................................................................................ 16
5 Creating the Training Project ........................................................................................................... 17
5.1 Creating Training Project Data – A Worked Example ....................................................................................17
5.2 Trainer - Entry to AVEVA Plant Products .......................................................................................................19
5.3 Trainee – Entry to AVEVA Plant Products .....................................................................................................19
5.4 Deleting the Training Databases ...................................................................................................................20
6 Installing Point Cloud Data .............................................................................................................. 23
6.1 Downloading the Point Cloud Data...............................................................................................................23
6.2 Copying the Point Cloud Data .......................................................................................................................24
– Project Administration Details ...................................................................................... 25
Teams ......................................................................................................................................................................25
Users........................................................................................................................................................................26
Databases - Design ...................................................................................................................................................27
MDBs .......................................................................................................................................................................28
– Project Areas Model Module ........................................................................................ 29
Training Project Groups ...........................................................................................................................................29
Area01: Stabilizer Area ............................................................................................................................................... 29
Area02: Buildings ........................................................................................................................................................ 30
Area03: Process Area .................................................................................................................................................. 30
Area04: Point Cloud .................................................................................................................................................... 31
Area05: Mining ........................................................................................................................................................... 31
Area02 - Supports ....................................................................................................................................................... 32
Area02 - Workshop ..................................................................................................................................................... 32
All Areas ...................................................................................................................................................................... 33
Copyright © 2021.
AVEVA Solutions Limited and its subsidiaries. Page 6 of 33
All rights reserved.
CHAPTER 1
1 Introduction
This Training Guide is designed to help the AVEVA Trainer configure the AVEVA Plant Training Project for
delivering the Training Course they are conducting.
Aim
The aim of this training guide is to provide sufficient information to allow AVEVA Trainers to configure a
Training Project for use in delivering AVEVA Plant Training Courses.
Objectives
• Create Training Teams, Users, Databases and MDBs.
Prerequisites
A version of AVEVA™ E3D Design 2.1, AVEVA™ Catalog 2.1 and AVEVA™ Administration 1.8 or 1.9 has been
installed along with the AVEVA Catalogue Project (ACP, minimum 53157 - AVEVA E3D Projects 2.1.0.30) and
AVEVA Sample Project (APS).
Course Structure
This manual is intended as a reference document for Trainers. Comprehensive guidance is provided in a series
of examples and explanation texts.
• Menu pull-downs and button click actions are indicated by bold blue text
• Information that needs to be entered into the software will be in bold red text
Copyright © 2021.
AVEVA Solutions Limited and its subsidiaries. Page 7 of 33
All rights reserved.
Training Setup
TM-1800
• Products, Applications, Modules, Toolbars, Explorers and other significant software elements will be in
bold black text
Other areas in this Training Guide will be presented with italic blue text and an accompanying icon to classify
the type of additional information. Other styles include:
Additional Information
Warning
Why
The following icons will be used to identify industry or discipline specific content:
Copyright © 2021.
AVEVA Solutions Limited and its subsidiaries. Page 8 of 33
All rights reserved.
CHAPTER 2
https://support.aveva.com/Products/Series/278
To install AVEVA E3D™ Training Setup, navigate to the directory C:\AVEVA\Plant directory and unzip the
training setup macros from the training setup zip file which is called same as release number, for example
“53196.zip”
Copyright © 2021.
AVEVA Solutions Limited and its subsidiaries. Page 9 of 33
All rights reserved.
Training Setup
TM-1800
This will create the following folders and sub folders under the directory:
C:\AVEVA\Plant\PlantTraining2.1\Training
It is important that the version of the Training Setup Macros matches the version of AVEVA Plant Products
being used as the training set up is frequently changed to reflect new features in the product.
Add the following lines to the bottom of the custom_evars.bat file located in the Project directory typically
C:\Users\Public\Documents\AVEVA\Projects2.1\. Make sure to leave a blank line at the bottom of the file.
SET PMLLIB=%PMLLIB%;C:\AVEVA\Plant\PlantTraining2.1\Training\pmllib
SET PMLUI=C:\AVEVA\Plant\PlantTraining2.1\Training\pmlui;%PMLUI%
SET REGQUERY=C:\AVEVA\Plant\PlantTraining2.1\Training
SET TRAVILT=TRUE
Environment variable TRAVILT set to TRUE allows create only one user per training and should be set for
trainings in cloud (Amazon Web Services environment). TRAVILT set to FALSE allows multiuser training
setup.
Copyright © 2021.
AVEVA Solutions Limited and its subsidiaries. Page 10 of 33
All rights reserved.
CHAPTER 3
Start > All Programs > AVEVA > Manage > Project Creation Wizard
Project Training
Code TRA
Copyright © 2021.
AVEVA Solutions Limited and its subsidiaries. Page 11 of 33
All rights reserved.
Training Setup
TM-1800
Click the OK button once the project has been created and then
click the Close button on the Project Creation Wizard form.
Enter the newly created Project via the AVEVA Administration shortcut:
Start > All Programs > AVEVA> Manage > AVEVA Administration
Project Training
User SYSTEM
Password XXXXXX
Copyright © 2021.
AVEVA Solutions Limited and its subsidiaries. Page 12 of 33
All rights reserved.
CHAPTER 4
In general terms, a typical AVEVA Plant project will have a database created per Discipline per Plant Area. The
project is made up of 4 Areas AREA01 - Stabilizer, AREA02 – Buildings, AREA03 – Process Area and AREA04 –
Laser Area.
Area04
Area03
Area02
Area01
The Training Setup creates all of the Users, Teams, MDB’s, Databases, and default files. It has the ability to
create up to 26 sets of independent databases.
Some project catalogues require modification and are hence copied into the training project from the AVEVA
Sample project (APS).
Copyright © 2021.
AVEVA Solutions Limited and its subsidiaries. Page 13 of 33
All rights reserved.
Training Setup
TM-1800
The databases are recreated each time the trainer selects the option to create a project. Once the course has
ended, the project data can be deleted; this will delete all the databases that the training setup created.
The setup can be used on any Plant project providing the AVEVA Catalogue (ACP) and Sample (APS) projects
can be referenced.
The Training Project by default is Metric, with British Standard Steelwork, PSL Supports and Cabling using
Cableway’s.
From the Admin main menu, Select Utilities > Training Setup… to display the Training Setup form.
Depending on the type of course being run, the Trainer can configure the project to the customer’s training
requirement by changing the options that are available on the Training Setup and MDS tabs.
Copyright © 2021.
AVEVA Solutions Limited and its subsidiaries. Page 14 of 33
All rights reserved.
Training Setup
TM-1800
Copyright © 2021.
AVEVA Solutions Limited and its subsidiaries. Page 15 of 33
All rights reserved.
Training Setup
TM-1800
This is described in full in TM-1304 AVEVA Plant (12.1) Multi-Discipline Supports Administration.
Copyright © 2021.
AVEVA Solutions Limited and its subsidiaries. Page 16 of 33
All rights reserved.
CHAPTER 5
SET TRAVILT=FALSE
The Training setup switches between several modules of all AVEVA Plant Products in order to compile the
project data. This is done using the AVEVA Console.
Once the Project Data has been created the Trainer will be returned to the Admin session.
If for any reason an error occurs during the creation of the project a warning message will be displayed.
Copyright © 2021.
AVEVA Solutions Limited and its subsidiaries. Page 17 of 33
All rights reserved.
Training Setup
TM-1800
Copyright © 2021.
AVEVA Solutions Limited and its subsidiaries. Page 18 of 33
All rights reserved.
Training Setup
TM-1800
The Trainer user has write access available to all writable databases in the newly created project. To login as
a Trainer, enter the following in any of the three AVEVA Plant products; AVEVA Administration, AVEVA
Catalogue and AVEVA E3D™ Design:
Project Training
Username TRAINER
Password T
MDB B-PIPING
Trainees would enter AVEVA Plant products using the user name as allocated by the Trainer. The Password is
the first letter of the Username, i.e. the password for A.PIPER user is A.
Copyright © 2021.
AVEVA Solutions Limited and its subsidiaries. Page 19 of 33
All rights reserved.
Training Setup
TM-1800
Project Training
Username B.PIPER
Password B
MDB B-PIPING
As noted previously, training databases are re-created each time the Create Project Data option is used. The
Delete Project Data can be used at the end of the Training Course to delete the Training Databases. Note that
the Reference databases are not deleted.
From the main menu select Utilities > Training Setup… to display the Training Setup form.
Copyright © 2021.
AVEVA Solutions Limited and its subsidiaries. Page 20 of 33
All rights reserved.
Training Setup
TM-1800
Once the Project has been deleted, the Admin module will display an empty project, as shown.
Copyright © 2021.
AVEVA Solutions Limited and its subsidiaries. Page 21 of 33
All rights reserved.
Training Setup
TM-1800
Copyright © 2021.
AVEVA Solutions Limited and its subsidiaries. Page 22 of 33
All rights reserved.
CHAPTER 6
Due to the large amount of data involved, the trainer is advised to allow enough time for downloading and
copying the data on the trainee’s machines prior to the training session.
Also, the trainer must ensure that the machines used for the Using Point Cloud Data training meets the
minimum hardware requirements for Laser data as mentioned in the AVEVA E3D User Bulletin.
The Point Cloud data provided for the training is different from the laser data for the RIB and Sample
Project.
Due to the large size of Point Cloud data (27Gb), the download may take a long time to complete
Once the download completed, unzip the archive 52457.zip in a temporary shared folder or on a portable
storage device. The unpacked Point Cloud dataset takes 67Gb of empty space.
Copyright © 2021.
AVEVA Solutions Limited and its subsidiaries. Page 23 of 33
All rights reserved.
Training Setup
TM-1800
Due to the nature of the Point Cloud Training exercises, the point cloud data must be copied locally, on every
attendee’s machines. Allow enough preparation time for this operation.
The laser data is contained in the archive Eaton.zip. Copy this file on a temporary folder on every machine via
a network share or a portable storage device.
C:\Users\Public\Documents\AVEVA\Plant\Laser
For example, using 7zip, right click the archive in file explorer and select 7zip > Extract Files…
This location is mentioned in the training guide for the creation of the point cloud model. However, it may
be changed as long as the trainee is advised where to find the lfd file.
Copyright © 2021.
AVEVA Solutions Limited and its subsidiaries. Page 24 of 33
All rights reserved.
APPENDIX A
Copyright © 2021.
AVEVA Solutions Limited and its subsidiaries. Page 25 of 33
All rights reserved.
Training Setup
TM-1800
Users
Copyright © 2021.
AVEVA Solutions Limited and its subsidiaries. Page 26 of 33
All rights reserved.
Training Setup
TM-1800
Databases - Design
The table below represents some of the available databases in the Training project. The Databases are named
with the suffix of the Designer, i.e. A for designer A.
For example:
EQUIPMENT/DESIGN-AREA01-A
EQUIPMENT/DESIGN-AREA02-A
EQUIPMENT/DESIGN-AREA03-A
EQUIPMENT/DESIGN-AREA04-A
EQUIPMENT/DRAW-ALL-AREAS-A
EQUIPMENT/DRAW-AREA01-A
EQUIPMENT/DRAW-AREA02-A
EQUIPMENT/DRAW-AREA03-A
EQUIPMENT/DRAW-AREA04-A
Copyright © 2021.
AVEVA Solutions Limited and its subsidiaries. Page 27 of 33
All rights reserved.
Training Setup
TM-1800
MDBs
Copyright © 2021.
AVEVA Solutions Limited and its subsidiaries. Page 28 of 33
All rights reserved.
APPENDIX B
The Project is split into four Areas; within Model there are Groups that can be used to manipulate each of the
four Areas, and some specific groups that are used by some training courses.
Area04
Area03
Area02
Area01
Copyright © 2021.
AVEVA Solutions Limited and its subsidiaries. Page 29 of 33
All rights reserved.
Training Setup
TM-1800
Area02: Buildings
Copyright © 2021.
AVEVA Solutions Limited and its subsidiaries. Page 30 of 33
All rights reserved.
Training Setup
TM-1800
Area05: Mining
Copyright © 2021.
AVEVA Solutions Limited and its subsidiaries. Page 31 of 33
All rights reserved.
Training Setup
TM-1800
Area02 - Supports
Area02 - Workshop
Copyright © 2021.
AVEVA Solutions Limited and its subsidiaries. Page 32 of 33
All rights reserved.
Training Setup
TM-1800
All Areas
Copyright © 2021.
AVEVA Solutions Limited and its subsidiaries. Page 33 of 33
All rights reserved.