References (5%)
TKB 480 – Plant Design
Memo #3
Place your company Write your engineering company here
logo here
Date :
To : email address
From :
Re : kelompok X_ product_memo
Completeness (20%)
It means that all equipment use in the PFD are calculated and designed.
Uniqueness (25%)
Equipment has their specification and properties that dependent on the operating condition thus the
designed dimension will be different from one to another.
Calculation (30%)
This section describes any assumption use and the work of calculation to obtain your dimension.
References (5%)
TKB 480 – Plant Design
Memo #4
Place your company Write your engineering company here
logo here
Date :
To : email address
From :
Re : kelompok X_ product_memo
The memo is divided into two main chapters that are reporting about supporting utility and
management regulation. The utility section should contain
Chapter 4
- Energy Efficiency (10%)
This section explains about the method and calculation on how energy is generated or
consumed during the process in order to achieve the optimum energy for the operating plant.
- Water System and Distribution (10%)
This section describe the water sources and their requirement for each water process type (such
as for BFW, cooling water, and sanitation)
- Steam and Power Generation (10%)
Please explain your method to generate steam and power for your plant
- Instrumentation and Control (15%)
This section should provide the P&ID (Piping and Instrumentation Diagram) diagram involving
the author’s signature and the piping specification (size, material, thickness, etc).
- Waste Treatment (10%)
This section describe on how your plant cope with the waste generated during the process.
- Other Utility (5%)
Please write other utility used in your plant
- Reference (3%)
Chapter 5
- Plant Layout (10%)
Described the 2D layout of the entire company area and process equipment lay out. Please also
provide 3D plant layout using software and one sample of equipment isometric diagram.
- Management Organization (10%)
This section explains your organization structure, their job description and salary.
- Health and Safety Control (10%)
Describe your health and safety regulation which may occur in the company area
- Employee welfare and working hour schedule (5%)
Describe the employee type and working hour duty. This section should also provide the
scheduled time for each employee and their welfare system.
- Reference (2%)
TKB 480 – Plant Design
Memo #5
Place your company Write your engineering company here
logo here
Date :
To : email address
From :
Re : kelompok X_ product_memo
This chapter describe about all economic aspects of the designed plant. However, the main contribution
mark to this chapter are pointed as follow
Chapter 6
- Cost estimation of main equipment (25%)
This section explains how the equipments are priced. The CEPCI index, reference taken,
assumption used and applied calculation method have to be provided well and clear.
- Reference (5%)
Chapter 7
- Conclusion (5%)
minimum 3 halaman, tidak boleh ada table dan grafik,
- Recommendation (10%)
minimum 2 halaman
Write your recommendation if any
TKB 480 – Plant Design
Minutes of Meeting form for Group Project
Please fill this out during your meeting,
Either on print out or electronically
Meeting date :
Group Number :
Group leader :
Participants :
What work did each member completed, based on targets that were set in the previous meeting?
Member 1 Member 2 Member 3
Notes
- Assign scores that reflect how you really feel about the extent to which each person contributed
to the team’s performance. Contributions are not only technical work, but also team
organization, information research, and report writing
- These scores directly affect the individual mark that you and your group members get for the
project
- This form is confidential between you and your lecturer. You shouldn’t show it to the other team
members or include it in your final report.
Instruction
1. list the name of each team member
2. evaluate each person’s contribution by distributing 100 points among them, e.g for a four-person
group with everyone contributing equally, give 25 points to each person.
3. please include a justification or comment for each person. This is essential if you give unequal
scores
total 100
PAF=stdfactor∗
( ∑ of scores for a member
∑ of team members )
+( JS factor∗JS score for that member )
Student factor may vary from 30% to 60% whilst lecture factor may vary from 40% to 70% depends on
disparity of peer assessment scores. The lecturing staff reserves the right to alter individual marks in
case of this disparity scores.
The scores from confidential peer assessment form for each group member are collated, so the PAFs
and individual marks are calculated:
thus, when a team got point for thus memo for example 70. point distributions are
Individual Team Individual
Name
mark Point Point
member 1 0.89 70 62.31
member 2 0.72 70 50.41
member 3 1.39 70 97.31
Please note that the effect of PAF will apply to individual mark directly.
TKB 480 – Plant Design
2022/2023 SEMESTER I PLANT DESIGN CASES
Halaman Judul
Lembar Pengesahan
Prakata
Abstrak
Daftar isi
Daftar Tabel
Daftar Gambar
Daftar Simbol dan Singkatan
Bab I Pendahuluan
1.1 Latar belakang pendirian pabrik
1.2 Kapasitas rancangan
1.3 Lokasi Pendirian Pabrik
1.4 Tinjauan Pustaka
1.4.1 Macam-macam Proses
1.4.2 Kegunaan Produk
1.4.3 Sifat Fisis dan Kimia
1.4.4 Tinjauan Proses secara umum
Daftar pustaka
Lampiran
I. neraca massa
II. neraca energy
III. perhitungan alat
IV. analisa ekonomi
V. data pendukung (literature penting)
Format Penulisan