BIM 360 PROJECT EXECUTION PLAN

IA1: BIM 360: Docs Essential Training


APOORVA PATEL
NORTHEASTERN UNIVERSITY
CMG6402: ALTERNATIVE PROJECT DELIVERY
PROF. ANIL SWAHNEY
MARCH 11TH 2022

This study source was downloaded by 100000854926890 from CourseHero.com on 10-16-2022 18:39:06 GMT -05:00

https://www.coursehero.com/file/144222400/BIM-360-PROJECT-EXECUTION-PLANdocx/
INDEX
1.1 PROJECT INFORMATION
1.2 PROJECT TEAM
1.3 BIM USES
1.4 BIM RESPONSIBILITY
1.5 BIM INFORMATION EXCHANGES AND MODEL SHARING
1.6 DOCUMENT MANAGEMENT
1.7 LEVEL OF DEVELOPMENT

This study source was downloaded by 100000854926890 from CourseHero.com on 10-16-2022 18:39:06 GMT -05:00

https://www.coursehero.com/file/144222400/BIM-360-PROJECT-EXECUTION-PLANdocx/
1.1 PROJECT INFORMATION

NAME OF THE PROJECT: TREES

OWNER: NAVEEN GUPTA

PROJECT TYPE: RECIDENTIAL

TYPE OF CONSTRUCTION: HIGH RISE BUILDING

VALUATION OF THE PROJECT: INR 200,000,000

CONTRACT TYPE: DESIGN-BID-BUILD

START DATE: 20 JUNE 2015

END DATE: 11 JULY 2019

PROJECT ID/NUMBER: 01/JUNE/2015-16

PROJECT ADDRESS: TREES HIGH RISE, SV ROAD, BANDRA WEST, 400050

PROJECT TIME ZONE: INDIAN STANDARD TIME(IST) (GMT +5:30)

BIM360 PROJECT FIELD LANGUAGE: ENGLISH

This study source was downloaded by 100000854926890 from CourseHero.com on 10-16-2022 18:39:06 GMT -05:00

https://www.coursehero.com/file/144222400/BIM-360-PROJECT-EXECUTION-PLANdocx/
1.2 PROJECT TEAM

RESPONSIVILITY COMPANY NAME EMAIL PHONE NO.

GENRAL S.S. VIRAT KOHLI Vk18@ss.com 1111111111


CONTRACTOR CONSTRUCTION

DESIGN BHARAT ROHIT SHARMA RS1100@bae.com 2222222222


ARCHITECT ARCHITECT

STRUCTURAL BMSF MAHENDRA MSD07@ind.com 3333333333


ENGINEER STRUCTURAL SINGH DHONI
CONSALTANT

PROJECT PANDYA HARDIK PANDYA HDP99@htm.com 4444444444


DEVELOPER BROTHERS

PROJECT JLL SHIKHAR Skd0022@jll.com 5555555555


MANAGER MANAGEMENT DHAWAN

SAFETY SAFE + RAVINDRA RDJ3000@safe.com 6666666666


MANAGER JADEJA

PROJECT LARCEN & TURBO RAHUL DRAVID Rkd223lnt.com 7777777777


EXECUATIVE

This study source was downloaded by 100000854926890 from CourseHero.com on 10-16-2022 18:39:06 GMT -05:00

https://www.coursehero.com/file/144222400/BIM-360-PROJECT-EXECUTION-PLANdocx/
1.3 BIM USES

Over long years, BIM seems to have been the buzz of something like the Construction
industry. Despite the hype, there may be a lot of misunderstanding regarding BIM in building
projects and how that would benefit subcontractors. One prevalent misunderstanding is that
BIM is only a technological or that it already applies to 3d model. BIM is effectively a
procedure for producing and maintaining all of a project's management, which results in a
Building Information Model, because encompasses methods section for every part of the
comprehensive structure. There are some benefits of using BIM360.

1. Improves on site communication: Advanced BIM models enable information


exchange, collaboration, and configuration management in ways that document
design sets need not. BIM collaboration may proceed fluidly through all sectors
inside that undertaking using virtualized solutions which including Autodesk's BIM
360. The BIM 360 ecosystems enables teams to exchange analysis of the strategic
and research and practices, ensuring that all designing stakeholders have such a
thorough understanding of project.
2. Cost estimation based on 3D modelling: BIM program such as Autodesk's Revit and
BIM 360 Doc streamlines pricing comparisons and implementation, allowing
estimation techniques to concentrate on considerably more significant aspects such
as determining construction assemblies and considering hazards.
3. Preconstruction visualize model: Well before snow blower strikes the grave, design
and envision the whole project during project conception. Distance simulators and
3D representations allow customers to see what the space will look like and make
improvements because once construction takes place. Slightly earlier on, possessing
a deeper knowledge eliminates the need for pricey and night prior to actually putting
to linen modifications.
4. Coordination and clashing: BIM enable improved coordination of industries and
consumers, identifying any MEP, organizational, or international disputes before
building begins. Any project can be made more efficient by reducing conflicts.
Building information modelling is a way of planning before you start building on site.
Furthermore, you may be able to avoid adding over the past modifications and
unexplained difficulties as well as be able to perform simple reviews and signatures
across many fields of study.
5. Schedule and sequencing: By reducing construction schedule obstacles and
shortening project cycles, these benefits conserve money as well as time. With BIM,
documentation can be concurrently designed and documented, as well as respond
easily to new information, such as site conditions.

This study source was downloaded by 100000854926890 from CourseHero.com on 10-16-2022 18:39:06 GMT -05:00

https://www.coursehero.com/file/144222400/BIM-360-PROJECT-EXECUTION-PLANdocx/
1.4 BIM RESPONSIBILITES

Except where otherwise noted in the trade-specific description, all work must be performed
in 3D format.

A. Independent 3D visualizations of needed permissions and from same for information


required to address, light certifications, overhanging conduit connect, and the like
should have been included in all modelling techniques. Those certain release or
authorization modelling techniques should have been separated into stages about
each commerce and labelled accordingly.

B. The insulation component of the model should be listed separately and labelled
accordingly.

C. All 3-dimensional documents provided for monitoring and control would have to be
"clean," which means that just about any unnecessary 2D connections and 3D
objects should always be removed from either the representations.

D. It is recommended to include riser drawings as required for coordination.

This study source was downloaded by 100000854926890 from CourseHero.com on 10-16-2022 18:39:06 GMT -05:00

https://www.coursehero.com/file/144222400/BIM-360-PROJECT-EXECUTION-PLANdocx/
1.5 BIM INFORMATION EXCHANGES AND MODEL SHARING

I. A prototype Please find the attached session will be scheduled by the


handyman. Each Construction company must still be recognized by the
designated person involved in supply chain coordinating.
II. The preparatory synchronization conference will be depending on the
thickness that can only be modified during the approach, such as
"(0,0,0)" for all professions to use after this same insertion point of their
designs. This cannot be changed after it has been agreed upon.
III. The intensity of annual conferences will really be decided by that of the
achievement of synchronization but the need to keep the things running
smoothly. Interaction negotiations will be placing at least more than once
a week then when harmonization is completed.
IV. Whenever one or maybe more participants are not physically present at
the project, an ongoing internet discussion will also be set up for
management. Private meeting, an email notification with resources and
procedures will be delivered.
V. The Construction Manager will use Autodesk Navisworks 2017 to create
the federalised simulation and come into conflict reports. Each
construction company needs to update their models depending on
resolutions reached at annual conferences, which must be implemented
by the next workshop.
VI. At this presentation, illegal downloading technologies and transfer
periodicity will be considered. A cooperation site will be established by
the Construction Manager.
VII. Award of contracts has Never been used to discover clashes. The conflict
document must be given either before or immediately after such
discussion.
VIII. A confirmation meeting is scheduled after the framework is clear of
traffic accidents. Attendance is necessary for all trades. A model sign-off
document with the very last illustration background image from every
trading activity will be granted. Every transaction could very well sign.
IX. The agreed to sign NWD will be posted to Collaborative efforts in each
investment's usage. It should be every trade's duty to guarantee that
things not included in the approach are profession orchestrated all over
however other deals.
X. Having signed off a place doesn't at all mean that it is ready for building.

This study source was downloaded by 100000854926890 from CourseHero.com on 10-16-2022 18:39:06 GMT -05:00

https://www.coursehero.com/file/144222400/BIM-360-PROJECT-EXECUTION-PLANdocx/
1.6 DOCUMENT MANAGEMENT

Frameworks contributed for synchronisation but instead posted online to something like
the Collaborative project site must adhere to something like the file name conventions
outlined elsewhere here:

FILE NAME: (Trade ID)-(Area/level)-(Year)- (Number of weeks)

SECTION EXAMPLE NOTE


AR – Architectural
TRADE PD – Project developer All the names in the system
PM – project manager must be included.
ST – Structure
SM – Safety management

AREA/LEVEL L–01

YEAR 2015

WEEKS 56 The project takes 56 weeks


to finish

Examples:
PD-L01-2015-56.dwg

PM-DWV-L01-2015-56.dwg

SM-L01-2015-56.nwc

AR-DMS-L01-2015-56.dwg

This study source was downloaded by 100000854926890 from CourseHero.com on 10-16-2022 18:39:06 GMT -05:00

https://www.coursehero.com/file/144222400/BIM-360-PROJECT-EXECUTION-PLANdocx/
Countless updates with the very same source file may be done in a specified session. The

last check for the day and will still be viewed next week's concluding presentation.

1.7 LEVEL OF DEVELOPMENT (LOD)

Level of Development (LOD) Definitions

L100 Conceptual BIM

L200 Approximate Estimate

L300 Precise

L400 Fabrication

L500 Recording BIM Documenting

This study source was downloaded by 100000854926890 from CourseHero.com on 10-16-2022 18:39:06 GMT -05:00

https://www.coursehero.com/file/144222400/BIM-360-PROJECT-EXECUTION-PLANdocx/
Powered by TCPDF (www.tcpdf.org)