The BIM methodology and the sustainable design are part of any project
developed by us.
We have a great expertise giving a good architectural design level of
building projects, with emphasis to solve situations with BIM methodology
and pre engineered automatized construction.
Cel +56 9 50103283
We work in a team with multidisciplinary role management. Controlling the Email fjdr@arqvision.cl
building process online, assuring the delity between the project and the URL www.arqvision.cl
quality of the construction.
contacto@arqvision.cl 1
fi
BIM: our methodology
Our work methodology uses most the current building design technology
present at this days. Always searching the e ciency and correct
execution.
- Site Survey Geo tagged: Our method brings the Site Model in UTM
coordinates locating the project in its exact position in the Earth. We get
the real shape to seat the building in the best position. And develop the
Energy Analysis for a better sustainable characteristics.
- BIM Methodology: Design a building in 3D, let us add all the technical
data to the Model in an easy way. Then the project information is shared
with all other people concerned to the project. Each of them will
develop its area project to be added to the Project Model. Then, when
the project is built there are only one and up to date information.
- Energy Analysis: Our design standard add this analysis as default. This
secures a reduction in the use of resources in the building operation of
our clients. Optional can get LEED or PassiveHaus certi cations.
- BIM Project Coordination: At the same time as the project starts, key
information is shared with the other project stakeholders, such as
engineers, builders, etc. The information of engineering projects is
added to the Main Model, in order not only to detect potential con icts,
but also to give a total idea of the building project. During this phase,
the Coordination will give the guidelines for the correct execution of the
construction, on time and minimizing errors. Added to this,
Documentary Management is a preponderant pillar that we also
dominate.
contacto@arqvision.cl 2
ffi
fi
fi
fl
BIM: our methodology
METHODOLOGY
Our methodology explained in some more than images.
As a rst step, all this data is storage in a Cloud Disk shared to all people
concerned to the project.
In this way, the reports of the amount of materials, area and any other
information necessary for the project are obtained.
Up to this point, the project can be shared in IFC or DWG for example, or in
XLS.
contacto@arqvision.cl 3
fi
fi
fi
fi
BIM: our methodology
Industrialized Building
Thanks the use of BIM Methodology, let us interact with industrialized
process of construction. In particular, our connection with the automatized
LGS structures fabrication of our projects with FRAMECAD technology,
gives us a great certainty that will be built with high level of accuracy to the
BIM Model. Complying with all building codes in currents at this time.
contacto@arqvision.cl 4
fi
BIM: our methodology
Using OpenBIM servers such as BIM Track or BIM Collab we are able to
inform to the project managers about all O cial Documents, Contracts,
Planimetry, Speci cations, Product Catalogs, State of Management for
Government Permits, Design Errors, Reports, Establishment of Roles and
Responsibilities, etc. .
This is saved in only one single site, then all the preponderant information
of the project is accesible to the management and control.