J-PEP No. Rev. No. Title Identical JGS No. Remarks
JPEP-0-1231-B-0001 0 Execution Procedure for Commissioning Work SPCD-001 JPEP-0-1231-B-0002 0 Control Procedure for Department Standard Document SPCD-004 JPEP-0-1231-B-0003 0 Control Procedure for Project Document SPCD-007 JPEP-0-1231-D-0001 0 Commissioning Work Flow JPEP-0-1231-G-0001 0 Check List for Planning of Commissioning Work JPEP-0-1231-G-0002 0 Split of Work Between Construction and Commissioning JPEP-5-1231-G-0003 0 Check List for Proposal of Commissioning Work JPEP-0-1231-G-0004 0 P&ID Check List JPEP-0-1231-G-0005 0 Check List for Plot Plan, Piping Layout, Plant Model JPEP-0-1231-G-0006 0 Ergonomic Study Manual JPEP-0-1231-G-0007 0 Hazop Study Procedure for Commissioning Engineer JPEP-0-1231-G-0008 0 Operaton Manual Check List JPEP-0-1231-G-0009 0 Guide for Pipe Cleaning Classification JPEP-0-1231-G-0010 0 Guide for Water Flushing JPEP-0-1231-G-0011 0 Guide for Air Blowing JPEP-0-1231-G-0012 0 Guide for Water Circulation JPEP-0-1231-G-0013 0 Guide for Steam Blowing JPEP-0-1231-G-0014 0 Guide for Acid Cleaning JPEP-0-1231-G-0015 0 Guide for Passivation Operation of Cooling Water System JPEP-0-1231-G-0016 0 Guide for Mechanical Running Test of Pumps JPEP-0-1231-G-0017 0 Guide for Mechanical Running Test of Compressors JPEP-0-1231-G-0018 0 Guide for Tightness Test JPEP-0-1231-G-0019 0 Guide for System Drying JPEP-0-1231-G-0020 0 Guide for Air Freeing JPEP-0-1231-G-0021 0 Guide for Nitrogen Removal Department Plant Commissioning Department J-PEP No. Rev. No. Title Identical JGS No. Remarks JPEP-0-1231-G-0022 0 Guide for Preparation of Operation Procedure JPEP-0-1231-G-0023 0 Field Check List JPEP-0-1231-G-0024 0 Guide for Work Request JPEP-0-1231-G-0025 0 Guide for Alkali Cleaning