The DISCIPLINE COMPLETION NOTICE (DCN) is fully described within the transmission, inclusive of any updates, & meets the following conditions: All Construction associated A Check Sheets have been completed The Master Punch List is Attached All Category "A" Punch list items are Closed All required Discipline Construction Completion components have been satisfactory installed and tested in accordance with approved ITPs (Excluding Category B & C Punch Items). All required construction related inspections have been completed by COMPANY All Vendor construction related verification activities have been completed Related "Site Queries" cleared & implemented (NCRs, RFIs, etc.) Related "Design Changes" cleared & implemented (SDRs, etc.) YES YES YES YES NO NO NO NO N/A N/A N/A N/A
NO NO NO NO
STATEMENT It is hereby certified that, the above conditions for DISCIPLINE COMPLETION NOTICE (DCN) have been erected / assembled in full accordance with and to design and Vendor / Supplier drawings; such that the Construction Completion by Discipline requirements set by the COMPANY have been fulfilled for this System, allowing Pre-Mechanical Completion activities to commence. - Exception(s), None. If yes, attach Exception List and provide mitigation measures for approval by QG Mechanical Completion Lead The Issuance of this DISCIPLINE COMPLETION NOTICE (DCN) shall not relieve the CONTRACTOR from any of its obligations under the CONTRACT, or operate as a waiver by the COMPANY of any of its rights there under, except in each case as may be expressly provided in the CONTRACT.
For and on behalf of: SIGNATURE PRINT NAME TITLE DATE QATARGAS JBOG Completions QATARGAS JBOG PMT
*38-4256*
38-4256
27-Jul-2013
Page : System
1/1
202-01
BERTH 2 INSTRUMENT AIR
Tag Type Tag Number Tag Description A-Sheet Form No. Discip. Code A-Sheet Description Contr. No. MC Status Date Signed-off
Piping
Pip.Test Pip.Test Pip.Test Pip.Test Pip.Test Pip.Test Pip.Test Pip.Test 202-01_TP01 202-01_TP01 202-01_TP01 202-01_TP01 202-01_TP02 202-01_TP02 202-01_TP02 202-01_TP02 Piping Test Pack Piping Test Pack Piping Test Pack Piping Test Pack Piping Test Pack Piping Test Pack Piping Test Pack Piping Test Pack P75201A P75102A P75101A Q415-M-020P P75101A P75102A P75201A Q415-M-020P MP MP MP MP MP MP MP MP Pressure test report Visual inspection of flanges, gaskets and bolting Above ground pipe inspection checklist Piping pneumatic test pack re-instatement checklist Above ground pipe inspection checklist Visual inspection of flanges, gaskets and bolting Pressure test report Piping pneumatic test pack re-instatement checklist K105 K105 K105 K105 K105 K105 K105 K105 Complete A Complete A Complete A Complete A Complete A Complete A Complete A Complete A 17-Jul-13 21-Jul-13 17-Jul-13 21-Jul-13 12-Jun-13 21-Jul-13 12-Jun-13 21-Jul-13 JBOG-PMT JBOG-PMT JBOG-PMT JBOG-PMT JBOG-PMT JBOG-PMT JBOG-PMT JBOG-PMT
Page :
1/1
"Not Started PL" Items are Outstanding "Cleared PL" Items are complete and required verification "Verified PL" Items have been verified complete
System :
System Description :
Cat Status Raised By Raised Date Discp Action Code By Target Date Cleared Date Cleared By Verified Date Verified Rejected By Date Rejected Remarks By
Punch Punch System Item Description Group Item No. No. (include tag identifier)