You are on page 1of 3

SHAMMI PULIKKOTTIL JOSEPH

C/o Qatar Engineering & Construction Company WLL


P.O Box No.24491, Salwa Industrial Area , Qatar

Career Prcis

Mobile(Qatar):+974-77304081
Mobile(India):+91-9895308830
shammijoseph@gmail.com

Young, energetic and result oriented engineer with exceptional work experience of more than 6
years within Oil & Gas sector, currently operating as Planning Engineer at Qatar Engineering &
Construction Company WLL. Expertise in project management, project planning, schedule
management, Material management, cost control, Invoicing and team management. Improve
the ways of working by setting and maintaining uniform standards and looking for opportunities for
continuous improvement (LEAN)
Received appreciation from seniors and colleagues for significant contribution done towards the
development of organization. Ability of coordinating several tasks at a time and excellent decisionmaking skills, demonstrate outstanding tendering and active listening skills, diffused several critical
situations with tact and ease. I aspire for Planning / Scheduling/Project Controls/Estimation
Engineer / Project Engineer to discover uncovers possibilities within Oil & Gas Facilities.

Project management
Project planning
Cost estimation/control/monitoring
Schedule Management
Quantity Surveying
Pipeline Erection

Static Equipment
Maintenance
Material planning
Material control
Vendor management
Procurement
Team management

Core
Competencies

Career Path

QatarEngineering&ConstructionCompanyWLL,Qatar

Mar10 -Present

Project 1 : Jetty Boil Off Gas (JBOG) Recovery Project


Qatar Gas (QG), Raslaffan, Qatar
Project Controls Engineer

Jun 11- Present

Project 2 : Train 3 & 4 , AKG-1 2011Shutdowns


RasGas, Raslaffan, Qatar
Planning Engineer

Feb 11- Jun11

Project 3 : Steam Header Integration Project


Qatar Fertilizers (QAFCO), Messaied, Qatar
Planning Engineer

Jun 10 Jan 11

Project 4 : Train 6, Train 1 & 2 2010 Shutdowns


RasGas, Raslaffan, Qatar
Planning Engineer

Apr 10 Jun 10

Project 5 : NGL 2010 Shutdown


Qatar Petroleum(QP), Messaied, Qatar
Jr Planning Engineer

Mar 10 Apr 10

DormanEngineeringPrivateLimited,India

Aug 09Feb 10

Project : Revamp of FRE Unit


HPCL Mumbai Refinery , India
Piping Engineer
Page 1 of 3

ParisonsAgrotechPrivateLimited,India
Plant Maintenance Works - Edible Oil Refinery
Engineer Trainee - Mechanical

Professional
Responsibilities

July 08 - July 09

PLANNING

Project planning and Scheduling using Planning softwares like Primavera P6 & MS Project.

Detailed development of schedules (cost and resource loaded) as per agreed WBS structure.

Monitoring and reporting of progress involving detailed engineering, procurement,


construction and mechanical completion upto commissioning stages.

Accountable for estimation of resources required for project like materials, manpower and
equipments.

Prepare work Packages for plant shutdowns which include activity breakup, job safety analysis,
P&IDs, WPS and repair procedures, equipment maintenance history, Inspection reports and
Drawings.

Prepare Job Cards for shutdown jobs which include detail activity breakup, manpower
requirement for each activity and logistics requirements.

MONITORING & CONTROLLING

Updating schedules with respect to baseline schedule, analyzing critical path and prepare
corrective action plan.

Generating look ahead schedules, manpower histograms, S curves and bar charts.

Conducting weekly meetings with execution teams and providing work front availability based
on material availability for different areas.

Basic preparation of EOT analysis.

Coordinate with engineering, inspection and operations personnel for the turnaround work
scope identification and issues resolution.

Periodic evaluation of progress comparing plan vs actual, manpower comparing planned vs


actual.

Monitoring of resources (manpower and equipments) as per the work scenario

Schedule risk analysis study and critical path analysis from progress measurement.

COSTING & INVOICING

Preparation of monthly cost reports, cash flow analysis, anticipated completion costs,
generating monthly progress invoices.

Preparation of anticipated variations (cost and time) due to change in scope, design etc to
match the project requirements.

Preparation & submission of weekly / monthly progress &invoice sheets co-relating with
construction drawings and site actual as per the B.O.Q.

CONTRACTS MANAGEMENT

Maintaining change order register, preparing Contractual letters / claims and resolving
contractual issues. Attending weekly Commercial and Progress meetings with client.

Preparation of chronology of events for concurrent delays.

Assisting in preparation of EOT claims through Time Impact Analysis (TIA).

Liable for preparation of comparison statement considering both technical and Commercial
aspects

Review quotations submitted by suppliers / sub-contractors and prepare comparative price


statement, negotiate, finalize subcontract terms & conditions.

QUANTITY SURVEYING

Preparing bill of quantities and tender prices from studying projects drawings like plan,
Page 2 of 3

isometric, key plan, plan & profile, interface plan, spool erection drawings, P&ID, flow diagram
drawings & designs.

Responsible for ensuring required quantities to be installed and field verifying and confirming
the quantities installed against the quantities required.

To formulate change orders to existing subcontracts for change in scope and pricing.

To assist in the review and settlement of any claims as may be raised by subcontractors.

MATERIAL MANAGEMENT

Periodic progress and status reports for materials in order to ensure their availability when and
where required.

Co-ordinate with Material department about purchase orders and material delivery. Providing
work front availability to execution team based on material availability for different areas.

EXECUTION

Provides professional direction and guidance to project team in matters related to engineering
Standards, project specification, and quality.

Monitoring piping construction and fabrication activities, insuring quality and taking necessary
actions to maintain satisfactory standards.

Preparation of field piping system test packages ,including system limit on P&ID and piping
Isometrics

Responsible for carrying out Mechanical Clearance, Conducting Hydro and Pneumatic tests,
fulfilling commissioning and Pre-Commissioning requirements for the project.

Education

Training /
Certifications/
Membership

B-Tech(Mechanical)
Kannur University, Kerala, India.

2008

Training in Advanced Project Management


Certification in PRIMAVERA&MS Project
Certification in Piping Design Engineering & Construction
Member of Project Management Institute (PMI)

Software/Tools
Technical Skills

Personal
Details

References

Proficiency

Primavera P6
MS office tools, MS Project
AutoCAD
Caesar II (Pipe Stress Analysis)

Proficient
Proficient
Proficient
Basic

Date Of Birth
Marital Status

25 August 1986
Married

Languages Known

English, Hindi, Malayalam & Tamil

Nationality

Indian

Available on request

Page 3 of 3

You might also like