You are on page 1of 22

LAMPIRAN XI

PERATURAN WALIKOTA SEMARANG


NOMOR : 44
TENTANG
STANDARISASI HARGA SATUAN
BANGUNAN , UPAH
DAN
ANALISA PEKERJAAN UNTUK KEGIATAN
PEMBANGUNAN PEMERINTAH KOTA SEMARANG
TAHUN ANGGARAN 2015

DAFTAR HARGA SATUAN PEKERJAAN INSTALASI LISTRIK

PEMERINTAH KOTA SEMARANG


SEMESTER I TAHUN 2015
(Belum termasuk PPN)

NO
HARGA SATUAN
URAIAN PEKERJAAN SATUAN
ANALISA (Rp)

I PEKERJAAN PONDASI
1 1 m³ - galian tanah keras sedalam 1 meter m3 63316
2 1 m³ - galian tanah keras sedalam 3 meter m3 65076
3 1 m2 - Plesteran 1 pc : 8 pp, tebal 15 mm m2 42732.36
4 1 m³ - urug kembali galian m3 1/3 harga galian
5 1 m³ - urugan pasir m3 189970
6 1 m³ - memadatkan tanah (per 20cm) m3 34650
7 1 m2 - acian m2 26833.13
8 1m3 - membuat lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,8 m3 869522.54
9 1m3 - membuat beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 m3 1091468.33
10 1 m2 - bekisting untuk kolom m2 240603
11 1 kg - pembesian kg 11706.26
12 1 buah - pondasi tiang, uk. 40 x 40 x 80 cm buah 299366.26
13 1 buah - pondasi tiang, uk. 40 x 40 x 200 cm buah 963354.97
II PEKERJAAN TIANG
1 1 buah - upah pasang tiang buah 204930
2 1 buah - tiang 1 (satu) tangan RS.9 (langsung/terusan) buah 3167190.19
3 1 buah - tiang 1 (satu) tangan RS.9 (langsung/terusan) buah 3146419.99
4 1 buah - tiang 1 (satu) tangan RS.9 (dengan stang 4 meter) buah 3639214.12
5 1 buah - tiang 1 (satu) tangan RS.9 (dengan stang 3 meter) buah 3536860.59
6 1 buah - tiang 1 (satu) tangan RS.9 (dengan stang 2 meter) buah 3434507.06
7 1 buah - tiang 1 (satu) tangan RS.9 (dengan stang 1,5 meter) buah 3429314.51
8 1 buah - tiang 1 (satu) tangan RS.9 (untuk lampu caping) buah 3407712.34
9 1 buah - tiang 2 (dua) tangan RS.9 (langsung/terusan) buah 2944440.19
10 1 buah - tiang 3 (tiga) tangan RS.9 (langsung/terusan) buah 2997595.49
11 1 buah - tiang oktagonal 1 (satu) tangan RS.9 buah 5491120.37
12 1 buah - tiang oktagonal 2 (dua) tangan RS.9 buah 5491120.37
13 1 buah - tiang beton 1 (satu) tangan RS.9 (dengan stang 3 meter) buah 3248956.86
14 1 buah - tiang bantu RS.9 buah 2702462.92
15 1 buah - tiang 1 (satu) tangan RS.7 (langsung/terusan) buah 1884784.89
16 1 buah - tiang 1 (satu) tangan RS.6 (langsung/terusan) buah 1654701.56
17 1 buah - tiang 1 (satu) tangan RS.6 (dengan stang 3 meter) buah 2300277.26
18 1 buah - tiang 1 (satu) tangan RS.6 (dengan stang 2 meter) buah 2197923.72
19 1 buah - tiang 1 (satu) tangan RS.6 (dengan stang 1.5 meter) buah 2141554.41
20 1 buah - tiang 1 (satu) tangan RS.6 (untuk lampu caping) buah 2171129.01
21 1 buah - tiang 1 (satu) tangan RS.4 (langsung/terusan) buah 1452118.22
22 1 buah - tiang 2 (dua) tangan RS.4 (langsung/terusan) buah 1668440.19
23 1 buah - tiang 4 (empat) tangan RS.11 (langsung/terusan) buah 4415041.19

III PEKERJAAN STANG


1 1 buah - upah pasang stang buah 50930
2 1 buah - upah pembengkokkan (roll) pipa galvanis buah 64900
3 1 buah - stang Ø 2" - 6 meter buah 1264113.92
4 1 buah - stang Ø 2" - 4 meter buah 599559.03
5 1 buah - stang Ø 2" - 3 meter buah 507590.6
6 1 buah - stang Ø 2" - 2 meter buah 415622.17
7 1 buah - stang Ø 2" - 1.5 meter buah 364445.4
8 1 buah - stang Ø 1" - 2 meter (caping) buah 312955.5

IV PEKERJAAN LAMPU
1 1 unit - upah pasang lampu (komplit set) unit 139810
2 1 unit - upah pasang lampu SL unit 24024
3 1 buah - lampu HPST 400 watt (komplit set) buah 4319810
4 1 buah - lampu HPST 250 watt (komplit set) buah 3369410
5 1 buah - lampu HPST 150 watt (komplit set) buah 3217610
6 1 buah - lampu HPST 70 watt (komplit set) buah 2423410
7 1 buah - lampu SL 65 watt buah 265419
8 1 buah - lampu SL 42 watt buah 190549.7
9 1 buah - lampu SL 43 watt buah 132016.5
10 1 buah - lampu LVD 40 watt buah 6211810
NO
HARGA SATUAN
URAIAN PEKERJAAN SATUAN
ANALISA (Rp)

V PEKERJAAN JARINGAN
1 1 gawang - upah pasang jaringan udara unit 69905
2 1 gawang - upah pasang jaringan bawah tanah unit 100375
3 1 buah - konstruksi SJ.6 unit 34544.4
4 1 gawang - jaringan udara (LVTC 3 x 16 mm2) unit 950463.8
5 1 gawang - jaringan udara (LVTC 2 x 10 mm2) unit 372105.8
6 1 gawang - jaringan udara (LVTC 2 x 25mm2) unit 1115463.8
7 1 meter - jaringan bawah tanah (Kabel NYY 4 x 6 mm2) unit 142512.85
8 1 meter - jaringan bawah tanah dengan bor horisontal unit 203646.67
VI PEKERJAAN PANEL
1 1 unit - upah pasang box panel unit 73150
2 1 unit - pemasangan box panel unit 5774290.5
VII PEKERJAAN BONGKARAN
1 1 buah - bongkar tiang dan armature buah 232650
2 1 buah - bongkar tiang buah 176825
3 1 buah - bongkar stang dan armature buah 115225
4 1 buah - bongkar stang buah 57475
5 1 buah - bongkar box APP (komplit set) buah 109725
6 1 gawang - bongkar jaringan udara gawang 94380
VIII PEKERJAAN LAIN-LAIN
1 1 VA - BP.UJL PLN VA 2200
2 1 VA - Tambah daya VA 2200
3 1 buah - stang lampu 1" - 1,5 meter (Pipa medium A) buah 61875
4 1 buah - stang lampu 1" - 2 meter (Pipa medium A) buah 82500
5 1 buah - stang lampu 1" - 3 meter (Pipa medium A) buah 123750
6 1 buah - stang lampu 1" - 4 meter (Pipa medium A) buah 165000
7 1 buah - stang lampu 1" - 6 meter (Pipa medium A) buah 247500
8 1 buah - stang lampu 2" - 1,5 meter (Pipa medium A) buah 122375
9 1 buah - stang lampu 2" - 2 meter (Pipa medium A) buah 163166.67
10 1 buah - stang lampu 2" - 3 meter (Pipa medium A) buah 244750
11 1 buah - stang lampu 2" - 4 meter (Pipa medium A) buah 326333.33
12 1 buah - stang lampu 2" - 6 meter (Pipa medium A) buah 489500
13 1 buah - pengadaan stopping buah 825
14 1 buah - pengadaan konektor buah 11000

WALIKOTA SEMARANG
KETERANGAN HAL

Hal. 1
Hal. 1
Hal. 2
Hal. 2
Hal. 3
Hal. 3
Hal. 4
Hal. 4
Hal. 5
Hal. 5

Hal. 6
Hal. 6

Hal. 7
Hal. 7
Hal. 8
Hal. 8
Hal. 9
Hal. 9
Hal. 10
Hal. 10
Hal. 11
Hal. 11
Hal. 11
Hal. 12
Hal. 12
Hal. 13
Hal. 13
Hal. 14
Hal. 14
Hal. 15
Hal. 15
Hal. 16
Hal. 16
Hal. 17
Hal. 17

Hal. 18
Hal. 18
Hal. 19
Hal. 19
Hal. 20
Hal. 20
Hal. 21
Hal. 21

Hal. 22
Hal. 22
Hal. 23
Hal. 23
Hal. 23
Hal. 24
Hal. 24
Hal. 24
Hal. 25
Hal. 25

KETERANGAN HAL

Hal. 26
Hal. 26
Hal. 27
Hal. 27
Hal. 28
Hal. 28 2230928
Hal. 29
Hal. 29

Hal. 30
Hal. 30

Hal. 31
Hal. 31
Hal. 32
Hal. 32
Hal. 33
Hal. 33

Hal. 33
Hal. 34
Hal. 34
Hal. 34
Hal. 35
Hal. 35
Hal. 35
Hal. 36
Hal. 36
Hal. 36
Hal. 36
Hal. 37
Hal. 37
Hal. 38

WALIKOTA SEMARANG

HENDRAR PRIHADI
REKAPITULASI
RENCANA ANGGARAN BIAYA (RAB)
PEMINDAHAN DAN PEMASANGAN PJU SISTEM METERISASI KEC. SABANGPARU
TAHUN ANGGARAN 2016

Uraian Pekerjaan Harga

A PEKERJAAN PERSIAPAN Rp. 2,200,000


B PEKERJAAN GALIAN Rp. 925,986
C PEKERJAAN PONDASI Rp. 70,695,445
D PEKERJAAN TIANG (PEMBONGKARAN DAN PASANG KEMBALI) Rp. 235,224,910
E PEKERJAAN LAMPU Rp. 303,940,940
F PEKERJAAN PANEL Rp. 673,141,000
H PEKERJAAN LAIN-LAIN Rp. 2,875,000
I PEKERJAAN PEMBERSIHAN DAN PELAPORAN Rp. 3,700,000

Jumlah Rp. 1,292,703,281

REAL COST Rp. 1,292,703,281

PPN 10 % Rp. 129,270,328

JUMLAH Rp. 1,421,973,609

DIBULATKAN Rp. 1,421,973,609

TERBILANG : Seratus Sembilan Puluh Sembilan Juta Enam Ratus Lima Puluh Ribu Rupiah

Sengkang, Oktober 2016

Penawar,
PT. RESKY BERSAMA WAJO

MUH. IDRIS
Direktur

Kepala Dinas Tata Ruang dan Permukiman


Kabupaten Wajo

Drs. H. MUHAMMAD NASIR, MM


Nip. 19641029 199103 1 004
1950

250000000
22727272.7272727
227272727.272727

154,377,282
RENCANA ANGGARAN BIAYA (RAB)
PEMINDAHAN DAN PEMASANGAN PJU SISTEM METERISASI KEC. SABANGPARU
TAHUN ANGGARAN 2016

Harga Satuan
No Uraian Pekerjaan Volume Satuan
(Rp)

A. PEKERJAAN PERSIAPAN
1 Pengukuran & Pas. Bowplank 1.00 Ls 500,000.00
2 Papan Proyek 2.00 Ls 100,000.00
3 Air Kerja 1.00 Ls 1,500,000.00
Jumlah
B. PEKERJAAN GALIAN
1 Pek. Galian tanah biasa 11.10 M3 67,280.29
2 Pek. Timbunan Kembali 3.70 M3 48,425.58
Jumlah
C. PEKERJAAN PONDASI
1 Pek. Beton 13.88 M3 1,210,783.87
2 Pek. Pembesian 1,665.00 Kg 22,548.54
3 Pek. Bekisting 44.40 M2 368,299.66
Jumlah
D. PEKERJAAN TIANG (PEMBONGKARAN DAN PASANG KEMBALI)
1 tiang oktagonal 2 (dua) tangan RS.9 37.00 Buah 6,152,500.00
2 upah pasang tiang 37.00 Buah 204,930.00
Jumlah
E. PEKERJAAN LAMPU
1 Lampu Led 120 Watt 74.00 Buah 3,967,500.00
3 upah pasang lampu (komplit set) 74.00 Unit 139,810.00
Jumlah
F. PEKERJAAN PANEL
1 Panel Surya 180 wp 74.00 Unit 3,933,000.00
2 baterai panel surya 74.00 Unit 4,140,000.00
2 SCC / BCR / BCU 74.00 Unit 1,023,500.00
2 upah pasang box panel 74.00 Unit 73,150.00
Jumlah
H. PEKERJAAN LAIN-LAIN
1 Assesoris 1.00 ls 2,875,000.00
Jumlah
I. PEKERJAAN PEMBERSIHAN DAN PELAPORAN
1 Pembersihan 1.00 Ls 1,200,000.00
2 Pelaporan 1.00 Ls 2,500,000.00
Jumlah
Jumlah
(Rp)

500,000.00 37
200,000.00
1,500,000.00
2,200,000.00

746,811.22
179,174.65
925,985.87

16,799,626.24
37,543,314.34
16,352,504.81
70,695,445.38

227,642,500.00
7,582,410.00
235,224,910.00

293,595,000.00
10,345,940.00
303,940,940.00

291,042,000.00
306,360,000.00
75,739,000.00
5,413,100.00
673,141,000.00

2,875,000.00
2,875,000.00

1,200,000.00
2,500,000.00
3,700,000.00
ANALISA HARGA SATUAN

A.2.3.1 HARGA SATUAN PEKERJAAN TANAH


A.2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m
Harga Satuan Jumlah
No Uraian Kode Sat Koefisien
(Rp.) (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
Pekerja L.01 OH 0.7500 Rp 74,900.00 Rp 56,175.00
Mandor L.04 OH 0.0250 Rp 93,184.00 Rp 2,329.60

Jumlah Harga Tenaga Kerja Rp 58,504.60


B BAHAN

Jumlah Harga Bahan Rp -


C ALAT

Jumlah Harga Peralatan Rp -


D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) Rp 58,504.60
E Overhead + Profit (Contoh 15%) Rp 8,775.69
F Harga Satuan Pekerjaan per - m3 (D+E) Rp 67,280.29

A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah


Pengurugan kembali 1 m3 galian dihitung dari 1/3 kali dari koefisien pekerjaan galian

Koefisien Harga Satuan


Jumlah
No Uraian Kode Sat
(Rp.) (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
Pekerja L.01 OH 0.5000 Rp 74,900.00 Rp 37,450.00
Mandor L.04 OH 0.0500 Rp 93,184.00 Rp 4,659.20

Jumlah Harga Tenaga Kerja Rp 42,109.20


B BAHAN

Jumlah Harga Bahan Rp -


C ALAT
Jumlah Harga Peralatan Rp -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) Rp 42,109.20
E Overhead + Profit (Contoh 15%) Rp 6,316.38
F Harga Satuan Pekerjaan per - m3 (D+E) Rp 48,425.58
ANALISA HARGA SATUAN
A.4.1.1 HARGA SATUAN PEKERJAAN BETON
A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 19,3 MPa (K 225), slump (12 • •2) cm, w/c = 0,58
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN
1 2 3 4 5 6
A Tenaga Kerja
Pekerja L.01 OH 1.6500 Rp 74,900.00
Tukang L.02 OH 0.2750 Rp 89,600.00
Kepala Tukang L.03 OH 0.0280 Rp 94,500.00
Mandor L.04 OH 0.0830 Rp 93,184.00
Jumlah Harga Tenaga Kerja
B BAHAN
Semen Portland Kg 371.0000 Rp 1,301.00
Pasir Beton Kg 698.0000 Rp 225.14
Kerikil (Maks 30mm) Kg 1047.0000 Rp 232.74
Air Liter 215.0000 Rp 50.00

Jumlah Harga Bahan


C ALAT

Jumlah Harga Peralatan


D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit (Contoh 15%)
F Harga Satuan Pekerjaan per - m3 (D+E)
CATATAN
Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Buckling factor pasir = 20 %

A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir


NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN
1 2 3 4 5 6
A Tenaga Kerja
Pekerja L.01 OH 0.0700 Rp 74,900.00
Tukang L.02 OH 0.0700 Rp 89,600.00
Kepala Tukang L.03 OH 0.0070 Rp 94,500.00
Mandor L.04 OH 0.0040 Rp 93,184.00
Jumlah Harga Tenaga Kerja
B BAHAN
Besi beton (polos/ulir) Kg 10.5000 Rp 17,200.00
Kawat beton Kg 0.1500 Rp 19,500.00
Jumlah Harga Bahan
C ALAT

Jumlah Harga Peralatan


D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit (Contoh 15%)
F Harga Satuan Pekerjaan per - m3 (D+E)

A.4.1.1.22 Pemasangan 1 m2 bekisting untuk kolom


NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN
1 2 3 4 5 6
A Tenaga Kerja
Pekerja L.01 OH 0.6600 Rp 74,900.00
Tukang L.02 OH 0.3300 Rp 89,600.00
Kepala Tukang L.03 OH 0.0330 Rp 94,500.00
Mandor L.04 OH 0.0330 Rp 93,184.00
Jumlah Harga Tenaga Kerja
B BAHAN
Kayu kelas III m3 0.0400 Rp 1,944,500.00
Paku 5 - 10 cm Kg 0.4000 Rp 17,810.00
Minyak bekisting Liter 0.2000 Rp 52,100.00
Balok kayu kelas II m3 0.0150 Rp 4,144,500.00
Plywood tebal 8 mm Lbr 0.3500 Rp 150,210.00
Dolken kayu ɸ 8-10 batang 2.0000 Rp 12,500.00
cm Panjang 4 m

Jumlah Harga Bahan


C ALAT

Jumlah Harga Peralatan


D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit (Contoh 15%)
F Harga Satuan Pekerjaan per - m3 (D+E)
JUMLAH
7

Rp 123,585.00
Rp 24,640.00
Rp 2,646.00
Rp 7,734.27
Rp 158,605.27

Rp 482,671.00
Rp 157,149.71
Rp 243,679.56
Rp 10,750.00

Rp 894,250.27

Rp -
Rp 1,052,855.54
Rp 157,928.33
Rp 1,210,783.87

pasir = 20 %

JUMLAH
7

Rp 5,243.00
Rp 6,272.00
Rp 661.50
Rp 372.74
Rp 12,549.24

Rp 180,600.00
Rp 2,925.00
Rp 183,525.00

Rp -
Rp 196,074.24
Rp 29,411.14
Rp 225,485.37

JUMLAH
7

Rp 49,434.00
Rp 29,568.00
Rp 3,118.50
Rp 3,075.07
Rp 85,195.57

Rp 77,780.00
Rp 7,124.00
Rp 10,420.00
Rp 62,167.50
Rp 52,573.50

Rp 25,000.00

Rp 235,065.00

Rp -
Rp 320,260.57
Rp 48,039.09
Rp 368,299.66
DAFTAR HARGA SATUAN UPAH
PROVINSI : SULAWESI SELATAN
KABUPATEN : WAJO
TAHUN ANGGARAN : 2016

NO. URAIAN KODE HARGA SATUAN


(Rp/Jam)

1 Pekerja L.01 10,700

2 Tukang L.02. 12,800


3 Mandor L.03 13,312
10 Kepala Tukang L.10 13,500
tiang oktagonal 2 (dua) tangan
17 - 6,152,500
RS.9
18 upah pasang tiang - 204,930
19 upah pasang lampu (komplit set) - 139,810
19 SCC / BCR / BCU - 1,023,500

Penawar,
PT. RESKY BERSAMA WAJO

MUH. IDRIS
Direktur
UPAH

HARGA SATUAN
(Rp/Hari)

74,900 74900

89,600 89600

93,184 89600

94,500 94500
89,600 89600

89,600 89600

89,600 89600

89,600 89600

Penawar,
RESKY BERSAMA WAJO

MUH. IDRIS
Direktur
DAFTAR HARGA SATUAN
Nama Kegiatan : Pemindahan dan Pemasangan PJU Sistem Meterisasi Kec. Sabangparu
Tahun Anggaran : 2016

Harga Satuan
No. Uraian Pekerjaan SATUAN
Rp.
I. BIAYA ALAT DAN BAHAN
1. Lampu Sumpit 85 Watt Bh 220,000
2. Kabel NYY 3x6mm M 29,000
3. Kabel NYY 2x10mm M 47,500
3. Kabel NYM 2 x 2,5 mm M 10,000
6. Biaya Perbaikan Tiang Set 750,000
7. Pondasi Set 1,375,000
8. Lampu hias Set 1,750,000
9. Kotak Panel 1 Set
a. Lemari Panel Bh 750,000
b. NFB Bh 490,000
c. Contaktor 3 Phasa Bh 750,000
d. Time Switch Bh 400,000
e. MCB Bh 80,000
10. Isolasi Bh 7,500
BIAYA PENYAMBUNGAN PLN
1. Bp Set 969
2. U. J. L Set 298
II.
3. S. J. I Set 500
4. SLO Set 30
5. Lemari KWH Set 950,000

Sengkang, Oktober 2016


Penawar,
PT. RESKY BERSAMA WAJO

MUH. IDRIS
Direktur
2,215,000

30
JADWAL PELAKSANAAN
PEMINDAHAN DAN PEMASANGAN PJU SISTEM METERISASI KEC. SABANGPARU
TAHUN ANGGARAN 2016

Uraian Pekerjaan Harga

A PEKERJAAN PERSIAPAN Rp. 2,200,000


B PEKERJAAN GALIAN Rp. 925,985.87
C PEKERJAAN PONDASI Rp. 70,695,445
D PEKERJAAN TIANG (PEMBONGKARAN DAN PASANG KEMBALI) Rp. 235,224,910.00
E PEKERJAAN LAMPU Rp. 303,940,940
F PEKERJAAN PANEL Rp. 673,141,000
G #REF! Rp. #REF!
H PEKERJAAN LAIN-LAIN Rp. 2,875,000
I PEKERJAAN PEMBERSIHAN DAN PELAPORAN Rp. 3,700,000

Jumlah Rp. #REF!

REAL COST Rp. #REF!

PPN 10 % Rp. #REF!

JUMLAH Rp. #REF!

DIBULATKAN Rp. #REF!

TERBILANG : Seratus Sembilan Puluh Sembilan Juta Enam Ratus Lima Puluh Ribu Rupiah

Sengkang, Oktober 2016

Penawar,
PT. RESKY BERSAMA WAJO

MUH. IDRIS
Direktur

Kepala Dinas Tata Ruang dan Permukiman


Kabupaten Wajo

Drs. H. MUHAMMAD NASIR, MM


Nip. 19641029 199103 1 004
250000000
22727272.7272727
227272727.272727

154,377,282
1950
JADWAL WAKTU PELAKSANAAN
PEKERJAAN : PEMINDAHAN DAN PEMASANGAN PJU SISTEM METERISASI KEC. SABANGPARU
LOKASI : TAHUN ANGGARAN 2016

PERIODE (PER MINGGU)


NO URAIAN TOTAL HARGA BOBOT KET
1 2 3 4 6 7

A PEKERJAAN PERSIAPAN 2,200,000 #REF! #REF! #REF! 100


B PEKERJAAN GALIAN 925,986 #REF! #REF! 90
C PEKERJAAN PONDASI 70,695,445 #REF! #REF! #REF! #REF! 80
D PEKERJAAN TIANG (PEMBONGKARAN DAN PASANG 235,224,910 #REF! #REF! #REF! #REF! 70
E PEKERJAAN LAMPU 303,940,940 #REF! #REF! 60
F PEKERJAAN PANEL 673,141,000 #REF! #REF! 50
G #REF! #REF! #REF! #REF! 40
H PEKERJAAN LAIN-LAIN 2,875,000 #REF! #REF! #REF! #REF! 30
I PEKERJAAN PEMBERSIHAN DAN PELAPORAN 3,700,000 #REF! #REF! 20
RENCANA 10
0
TOTAL HARGA #REF! #REF!
PERMINGGU #REF! #REF! #REF! #REF! #REF! #REF!
RENCANA
KOMULATIF #REF! #REF! #REF! #REF! #REF! #REF!

Penawar,
PT. RESKY BERSAMA WAJO

MUH. IDRIS
Direktur

You might also like