0% found this document useful (0 votes)
127 views1 page

Mri Form

This document records the inspection of delivered materials for a project. It notes that material receiving inspection is not required and lists the supplier, manufacturer, and required documentation. The delivery was inspected and found to be conforming, so it was accepted with any non-conforming items held. Signatures were provided by the store keeper, contractor, and consultant to document the inspection decision and any comments.

Uploaded by

Edmund Ray Pega
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
127 views1 page

Mri Form

This document records the inspection of delivered materials for a project. It notes that material receiving inspection is not required and lists the supplier, manufacturer, and required documentation. The delivery was inspected and found to be conforming, so it was accepted with any non-conforming items held. Signatures were provided by the store keeper, contractor, and consultant to document the inspection decision and any comments.

Uploaded by

Edmund Ray Pega
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd

Project Contactor

Consultant

Material Receiving Inspection No

Description Delivery Date

Approval Reference

Supplier Manufacturer

Documentation Required ( with delivery ) Provided Yes No

Delivery Inspection Decision

Conforming Accepted

Delivery Rejected

Non Conforming Hold

(Any approval and/or comment not deliver shall not relieve the contractor of his obligation as stipulated in the contract document s)
Comments on Rejected /Hold Status

Function Store Keeper Contractor Consultant