DESIGN LAYOUT PROPOSED TYPICAL CROSS
SECTIONS ALONG THE ROUTE.
یهی ج هسدس
یهی ج هسدس
یهی ج هسدس
یهی ج هسدس
یهی ج هسدس
یهی ج هسدس
یهی ج هسدس
یهی ج هسدس
یهی ج هسدس
BM15
BM16
یهی ج هسدس
یهی ج هسدس
BM38
BM39
MASONRY WALL
یهی ج هسدس
MASONRY WALL
یهی ج هسدس
MASONRY WALL
فیرش دجسم
MASONRY WALL
یهی ج هسدس
MASONRY WALL
یهی ج هسدس
MASONRY WALL
یهی ج هسدس
یهی ج هسدس
MASONRY WALL
یهی ج هسدس
MASONRY WALL
BM40
یهی ج هسدس
BM41
یهی ج هسدس
یهی ج هسدس
یهی ج هسدس
یهی ج هسدس
یهی ج هسدس
یهی ج هسدس
Yahia Safari
BM35
Location: District 13
Right of Way: Road (5-10)m, Canal (2m) Reviewed By: Signature:
BM36
NOTE: 4% 4% 2.00
0.20
Cut material used for backfilling of 20CM granular Aggregate road should be 0.25
well compacted 95% each layer 15cm.
A A A 2.00 A
0.25
0.10 0.25
1.50
0.25
0.10
0.10
0.15
A A A 2.00 A
0.25
0.10 0.25
1.50
0.25
0.10
0.10
0.15
KABUL MUNICIPALITY
DESIGN TEAM
Flow Direction
Project Name:
1.50 2.00
Ø10mm lifting hook Jabar Khan Canal Project
Drawing Title:
C
B
Designed:
1.80 0.15 0.1 Ghulam Hazrat Rezai
Signature:
0.25 Checked:
Yahia Safari Signature:
1.80 0.10
0.70
0.70
Project Code
Canal Plan
SHEET NO. Revision
C
B
1 00
NOTE:
1. All dimensions are in centimeters unless
otherwise indicated.
AS1
AS5 AS4 AS1 AS5
AS2 14 150 2.24
AS4
2.50 2.50 2.00
AS3 14 150 2.24
overlapping
Designed By:
KABUL MUNICIPALITY
DESIGN TEAM
Drawing Title:
Date: Scale:
AS5 10/04/2021 NTS
Status:
FINAL DESIGN
Longitudinal Section Reinforcement Project Code
2 02
D
NOTE:
1. All dimensions are in centimeters unless
otherwise indicated.
Note:
1- the location of RCC ditch should be followed the
existing ditch in each link road and should be
properly adjusted. RCC DITCH
2- H should not be less then 50cm and B should not RCC DITCH
be less then 40cm otherwise the dimension should Precast slab
be according to the dimension of existing ditch. Varies
Existing Ditch
Existing Ditch
Catch Basin (80x80x80)
Catch Basin (80x80x80) D Catch Basin (80x80x80)
Community Road with Existing Ditch
Existing Ditch
ISLAMIC REPUBLIC OF
AFGHANISTAN
PRECAST SLAB PRECAST SLAB
STEEL BAR MESH FOR
SCREENING
Designed By:
MAX 400cm
Ø16mm@5cm
KABUL MUNICIPALITY
DESIGN TEAM
Project Name:
Drawing Title:
Drawn:
CATCH BASIN CANAL BAR SHAPE TABLE Signature:
Ghulam Hazrat Rezai
Designed:
NUM. BAR Ø(MM) SPACING Ghulam Hazrat Rezai
Signature:
SHAPE (MM)
Checked:
Yahia Safari Signature:
15CM RCC M25 BR1 Ø14 150
2.5M
2.5M
+0.00 +0.00
ISLAMIC REPUBLIC OF
AFGHANISTAN
Client:
KABUL MUNICIPALITY
2.5M
Project Name:
Drawing Title:
Status:
Client's Review
Foundation Details
for all Types
Client's Approval:
Project Code
01 00
0+
34
PT C=
P
0
= 0 0+
NOTE:
CURVE TABLE
+3 311
14 .30
0
0.0
.20
1. All dimensions are in meters unless
+00
Curve # Radius Length PI Station Start Station End Station Delta Angle otherwise indicated.
=0
C8
CE
0+
P
BP
32
3
C75 5.23 3.99 0+478.77 0+476.67 0+480.66 43.66
8.6
0
PT
CE
+01
BM
=0
P
35
LEGENEDS
=0
C74 21.00 10.73 0+414.91 0+409.43 0+420.15 29.27
+2
PC=
88
CENTER-LINE
PC
00
.30
CE
CE
0
P
C73 21.00 8.81 0+240.51 0+236.04 0+244.85 24.05
0+0 EXISTING ROAD
+273
PT= 0+254.37
P
0+
PC=
CENTER-LINE
30
30.44
PT= 0
/h
6.04
0+25
.0
0
km
7
PROPOSED CANAL
PC=
C7
100
PT= 0+2
20
23
8.10
+244.8
ROW OF CANAL
0+2
PC= 0+
AT
0+0
4
D=
MA ATIO
65.6
C1
ST
0+0 PEE
6.92
EXISTNG DRIAN
0+2
TC N
5
0+0
00
C6
H -0
STA IGN S
BOUNDARY WALL
00.
77. 9
80
40
88.55
C5
PT=
LIN +3
C73
0+0
0
0+0
S
E - 04.
EDGE OF ROAD
0+26
DE
PT=
PT= 0+
PC=
1 00
0
CE
PC= 0+16
0+240
0+22
BM
P
36
EXISTING FENCE
0+1
60
PT= 0+154.
4.26
81.1
0+0
EXISTNG FEATURES
C2
13
6
PC= 0+
CONNECTING LOCAL
7.95
CURVE TABLE
0+2
ROADS CULVERT
80
79
00
0+0
CP
Curve # Radius Length PI Station Start Station End Station Delta Angle C4 CONCRETE POLE
0+ 100
C3
0+1
TREE
0+120
C5 21.16 13.52 0+223.92 0+216.92 0+230.44 36.61
80
0+160
0+140
BENCH MARK
BVCS= 0+167.01
EVCS= 0+229.42
BVCS= 0+076.40
EVCS= 0+091.80
BVCE= 1912.56
EVCE= 1909.89
BVCE= 1916.81
EVCE= 1916.02
1920 1915
-4.6
0% 1910
-5. 1914
66%
1919 Date Revision Details Drawn
1909
1918 1913 -3.9
ISLAMIC REPUBLIC OF
AFGHANISTAN
3%
1908
1912 Designed by:
1917 KABUL MUNICIPALITY
DESIGN TEAM
1907
1916 1911
1906
1910
1915
Project Name:
1905
JABAR KHAN ROAD& CANAL PROJECT
1914 1909
1904 Drawing Title:
1913 1908
1908 1904 FINAL PLAN& PROFILE
1918.632 1921.132 1921.889 0+000
Date: Scale:
CANAL BED ELEVATION
4/10/2021 1:1000
Status:
FINAL DESIGN
L=18.63 Lc=47.02 L=12.26 Lc=10.65 L=45.70 Lc=20.53 L=13.17 Lc=13.21 L=35.76 Lc=13.52 L=5.60Lc=8.81 L=9.52Lc=3.73 L=14.97 Lc=15.23 L=23.00
HORIZANTAL GEOMETRY
R=1157.43 R=43.63 R=61.32 R=41.78 R=21.16 R=21.00 R=43.14 R=40.25 Project Code
.00
ION INE - 2
PC= 0+476C.67
608
PT= 0+440.96
- 0+
LEGENEDS
L
CENTER-LINE
82 66
AT S ATCH
PT= 0+497.68
PC== 0+56
PC= 0+513.55
PT= 0+516.26
.81
PT
+4 80.
EP
BM34
EXISTING ROAD
= 0 +4
PC= 0+544.75
CEP
PC
0+5 3.59
TAT
PC T= 0
9
CENTER-LINE
CEP
1.6
=0
C75
M
65.5
P
+4
58
PROPOSED CANAL
07
PPT C= 0+40
27
0+
C12
6
73.
=0
.08
288.30
=
C15
8
PPTC== 00+398.4
98.907
ROW OF CANAL
+4
PT
C76
+2
0+460
0+5 93.
BM32
CEP
20
=0
0
0+440
C13
48
PT = 0 +
3 1.30
0
PT= 0+5
1
1
EXISTNG DRIAN
PT= 0+
PC
5
+400.0 3
PT= 0+3114.2
CEP
09.1
C14
PC= 0+368.01
9.43
0+
EP C
=
PT= 0+352.18
CEP
8
BOUNDARY WALL
PC
CEP
0+6
PC= 0+343.3
80
PC= 0+
0+500
380.77
C74
0
0+520
1
C7 C77
0+56
0+5
CEP
9
CEP
P C=
EDGE OF ROAD
0+540
2.0
BM33
0+
C11
+62
42
EXISTING FENCE
80
=0
0
C8 C16
CEP
C10
PT
00
0+2
EXISTNG FEATURES
0+400
0+300
0+6
C9
BM31
CONNECTING LOCAL
0+380
0+320
ROADS CULVERT
0+360
0+340
20
BM35
CP CONCRETE POLE
0+6
CEP
TREE
40
CURVE TABLE CURVE TABLE BENCH MARK
0
0+6
0+304.0
AT STA H LINE - 1
Curve # Radius Length PI Station Start Station End Station Delta Angle Curve # Radius Length PI Station Start Station End Station Delta Angle
0 10 20
TION -
Meters
C15 15.89 16.12 0+574.39 0+565.56 0+581.69 58.13 C10 144.60 12.77 0+374.39 0+368.01 0+380.77 5.06
MATC
C14 37.13 18.85 0+554.38 0+544.75 0+563.59 29.08 C9 40.25 8.80 0+347.80 0+343.38 0+352.18 12.53
C13 37.13 2.70 0+514.91 0+513.55 0+516.26 4.17 C8 40.25 2.90 0+312.75 0+311.30 0+314.20 4.13
C12 19.87 13.88 0+434.32 0+427.08 0+440.96 40.02 C7 40.25 15.23 0+280.78 0+273.07 0+288.30 21.68
C11 37.13 1.58 0+399.22 0+398.43 0+400.01 2.44 C6 43.14 3.73 0+256.24 0+254.37 0+258.10 4.96
BVCS= 0+606.94
BVCS= 0+320.00
EVCS= 0+401.50
BVCE= 1896.18
BVCE= 1906.33
1905
Designed by:
1901 KABUL MUNICIPALITY
1897 DESIGN TEAM
1904
1900
1896
1903
1899
1895
1902 Project Name:
Date: Scale:
CANAL BED ELEVATION
4/10/2021 1:1000
Status:
FINAL DESIGN
Lc=2.90 Lc=8.80 Lc=12.77 L=17.65 Lc=1.58
L=9.42 Lc=10.73 L=6.93 Lc=13.88 Lc=3.99
L=2.16 Lc=14.87 L=15.87 Lc=2.70 Lc=18.85 L=1.97 Lc=16.12 L=12.29Lc=4.10L=11.04
HORIZANTAL GEOMETRY L=23.00 L=29.18 L=15.83 L=35.71 L=28.49
R=40.25 R=40.25 R=144.60 R=37.13 R=21.00 R=19.87 R=5.23 R=21.00 R=37.13 R=37.13 R=15.89 R=21.00 Project Code
AT STATION - 0+912.00
MATCH LINE - 3
1. All dimensions are in meters unless
otherwise indicated.
PT= 0+687.34
PI= 0+700.06
LEGENEDS
PC= 0+720.40
P C=
CENTER-LINE
CEP
0+6
1
EXISTING ROAD
34.5
PPTC== 0
CENTER-LINE
77.0
9
PT= 0+844.99
PT= 0+622.09
PT=
26
PC= 0+609.11
PC= 0+921.47
PT= 0
PC= 0+833.
0+7
PC= 0+647.98
PT= 0+581.6
PT= 0+598.08
PT= 0+7439.9
7
4 .4
0++6661.24
CEP
PROPOSED CANAL
PC= 0+593.9
0+92
PT=
C18
BM
64.4
0+7
30
CEP
PT= 0+802.
+654
9
C71 ROW OF CANAL
PC= 0+797.8
CEP
8.30
CEP
4
PC=
.26
EXISTNG DRIAN
0+700
65
0
0+720
C78
0+68
C79 BOUNDARY WALL
CEP
64
C77 C16 C17 C20 C21 EDGE OF ROAD
0
CEP
0
4
CEP
CE
CEPP
C19
0+7
0+66
CEP
0+620
0+840
0+860
0+880
0+900
0+920
BM
0+640
CEP
29
0+600
0+760
EXISTING FENCE
BM
28
0+820
BM
0+780
31
EXISTNG FEATURES
0+800
CONNECTING LOCAL
608.00
ROADS CULVERT
MATCH LINE - 2
CP CONCRETE POLE
CURVE TABLE
AT STATION - 0+
TREE
Curve # Radius Length PI Station Start Station End Station Delta Angle BENCH MARK
BVCS= 0+810.04
EVCS= 0+838.95
EVCS= 0+718.32
BVCE= 1888.01
EVCE= 1886.97
EVCE= 1891.89
1888 Date Revision Details Drawn
1895
1891 ISLAMIC REPUBLIC OF
1887 AFGHANISTAN
1894 -4.2
1890 3%
-2.93
1886 % Designed by:
KABUL MUNICIPALITY
DESIGN TEAM
1893
1889
1885
1892
1888
1884
Project Name:
1891
1887 JABAR KHAN ROAD& CANAL PROJECT
1883
1890 Drawing Title:
1886
1890 1886 1882 FINAL PLAN& PROFILE
1893.221 1895.721 1895.755 0+620
STATION
Designed by: Signature:
Ghulam Hazrat Rezai
Drawn by: Signature:
EXISTING ELEVATION Ghulam Hazrat Rezai
Checked by: Signature:
Moh. Yahia Safari
Date:
CANAL BED ELEVATION Scale:
4/10/2021 1:1000
Status:
FINAL DESIGN
Lc=12.98
L=11.04 L=25.89 Lc=6.27L=6.98
Lc=3.20L=12.65 Lc=10.26 L=12.72 L=20.34 Lc=14.11 L=8.92 Lc=6.54 L=47.93 Lc=4.75 L=31.01 Lc=11.34 L=76.48
HORIZANTAL GEOMETRY
R=118.23 R=20.42 R=21.00 R=23.72 R=40.75 R=21.00 R=20.42 R=84.79 Project Code
0
otherwise indicated.
1+216.0
AT STA H LINE - 4
PT= 1+098.41
PC= 1+090.90
PC= 1+107.13
PT= 1+021.61
LEGENEDS
TION -
PT= 1+055.05
PC= 1+036.39
PC= 0+
131.98
CENTER-LINE
MATC
EXISTING ROAD
Res
iden
PT= 1+
tial
995.82
Bui
PT= 0+
1+16624..955
ldin
5
CEP
g
CENTER-LINE
PC= 0
CEP
CEP
C25 PROPOSED CANAL
CEP
C== 1+1
C26
+960.4
963.06
BM
C23
27
27
ROW OF CANAL
PT= 0+ C24
CEP
CEP
PC= 1+210.
7
PPT
PC= 0+921.4
1.48
1+100
6
CEP
1+080
EXISTNG DRIAN
CEP
1+120
اخ
1+020
هخ
یهی ر
1+060
1+22
1+000
2.63
C27
928.30
1+040
C22
BOUNDARY WALL
1+140
Res
iden
1+23
tial
0+980
BM
Bui
PT=
CEP
ldin
26
BM
g
25
EDGE OF ROAD
1+160
C28
PC=
0+960
C21
1+180
EXISTING FENCE
CEP
1+200
0+940
0+900
EXISTNG FEATURES
BM
C29
28
اخ
هخ
ر
0+920
یهی
0
CONNECTING LOCAL
1+22
ROADS CULVERT
CURVE TABLE
- 0+912.00
40
CP CONCRETE POLE
1+2
E-3
Curve # Radius Length PI Station Start Station End Station Delta Angle TREE
MATCH LIN
BENCH MARK
C25 60.59 7.51 1+094.66 1+090.90 1+098.41 7.10
AT STATION
PVI STA=1+034.77
PVI ELEV=1881.23
LVC=241.90
K=574.78
EVCS= 1+155.72
1884 1880
EVCE= 1878.19
Date Revision Details Drawn
ISLAMIC REPUBLIC OF
1883 1879 AFGHANISTAN
1881 1877
1880 1876
Project Name:
Status:
FINAL DESIGN
Lc=6.83 Lc=2.60 Lc=25.79 Lc=18.66 Lc=7.51 L=8.72 Lc=24.85 Lc=1.60 Lc=11.21
HORIZANTAL GEOMETRY L=76.48 L=32.16 L=32.76 L=14.78 L=35.85 L=30.96 L=45.72
R=20.42 R=87.46 R=98.66 R=115.10 R=60.59 R=142.58 R=20.42 R=65.93 Project Code
0.00
otherwise indicated.
Curve # Radius Length PI Station Start Station End Station Delta Angle
ON - E - 5
1+52
C30 14.44 7.48 1+272.12 1+268.29 1+275.77 29.70
AT S ATCH LIN
PC= 1+423.06
PT= 1+445.29
5
LEGENEDS
PC= 1+454.8
PT= 1+397.91
PC= 1+
32.41 10.34 1+237.84 1+232.63 1+242.97 18.27
.14
C29 CENTER-LINE
TATI
+460
EXISTING ROAD
.58
M
3
C28 65.93 11.21 1+215.89 1+210.27 1+221.48 9.74
1
CENTER-LINE
90.41
PT= 1+
اخ
هخ
ر
+473
PT=
یهی
73
C34
CEP
BM
PROPOSED CANAL
22
77.
C35
1
C27 20.42 1.60 1+163.75 1+162.95 1+164.55 4.50
PC=
اخ
C33
+4
ROW OF CANAL
هخ
58.61
ر
CEP
یهی
=1
PC
1+440
PT
1+420
C26 142.58 24.85 1+119.59 1+107.13 1+131.98 9.99
PT
EXISTNG DRIAN
C36
=1
=1
1+400
+5
+3
1+46
BOUNDARY WALL
64
PC
42.
1+380
.36
C32
=1
02
EDGE OF ROAD
اخ
+55
هخ
ر
یهی
1+360
480
اخ
هخ
PC= 1+210.27
ر
PT= 1+221.48
یهی
2.5
EXISTING FENCE
PT= 1+525.93
PC= 1+530.20
PC= 1+232.63
87 PT
9
1+
1
C3
=
14.
CEP
EXISTNG FEATURES
CEP
1+5
+5
CEP
7
42.9
1+
=1
37.
CONNECTING LOCAL
BM
23
340
PC
09
اخ
ROADS CULVERT
هخ
1+2
500
ر
یهی
CEP
BM
25
PT
PT=
C37
1+
CP CONCRETE POLE
=
C28
PC= 1+284.8
C38
PT= 1+275.7
1+
C29
CEP
298
68.2
TREE
1+
1+5
.80
32 0
1+220
1 +2
0
CURVE TABLE
1+200
CEP
1+52
4
1+180
0
BENCH MARK
اخ
0
هخ
PC=
ر
یهی
0
AT STATION - 1+216.00
1+24
BM
7
21
C31
اخ
MATCH LINE - 4
یهی
C30
1+
60
300
0 10 20
1+2
Meters
1+280
CEP
BM
24
C34 106.53 22.23 1+434.21 1+423.06 1+445.29 11.96
اخ
هخ
ر
یهی
PVI STA=1+412.26
PVI ELEV=1871.74
LVC=87.84
K=168.55
1874 1872 Date Revision Details Drawn
BVCS= 1+368.34
EVCS= 1+456.18
BVCE= 1872.84
EVCE= 1870.86
1876 ISLAMIC REPUBLIC OF
-2.51
%
1873 1871 AFGHANISTAN
1874
1871 1869
Date: Scale:
CANAL BED ELEVATION
4/10/2021 1:1000
Status:
FINAL DESIGN
Lc=11.21L=11.15 Lc=10.34 L=25.32 Lc=7.48 L=9.02 Lc=14.00 L=43.21 Lc=16.60 L=31.79 Lc=7.51 L=25.14 Lc=22.23 L=9.56Lc=5.29 L=13.44 Lc=4.15 L=37.13 Lc=11.06
HORIZANTAL GEOMETRY
R=65.93 R=32.41 R=14.44 R=30.07 R=45.74 R=67.44 R=106.53 R=20.42 R=20.42 R=20.42 Project Code
LEGENEDS
PC= 1+747.78
PC=
PT= 1+742.10
PT= 1+734.95
2
3.8
PC= 1+71
CENTER-LINE
2..7680
+61
1+741.62
1+6219
.00
=1
EXISTING ROAD
PT= 1+6
CENTER-LINE
PT
PC
اخ
PT=11+645.19
PT= 1+67
هخ
PC
ر
N - 1+824
PC= 1+663.99
یهی
AT STATIO INE - 6
=1
7.96
.01
BM
20
6
C41
=
+59
9.8
=
PC
PROPOSED CANAL
CEP
+641
1 +8
9.4
5
0
+7
C80 C45 C46
96.
اخ
C44
PT
ROW OF CANAL
=1
هخ
ر
یهی
BM
18
0.08
MATCH L
=1
2
PC=
PT
6
CEP
EXISTNG DRIAN
+88
1+
CEP
60
1+740
CEP
20 CE P
5.3
1+720
0 C42 BOUNDARY WALL
C43
1+6
9
PT
BM
1+700
19
0
= PC EDGE OF ROAD
76
خم
ار
1+5
اخ
یرش هخ
ف ر
PC
یهی
=1
1+680
81.
1+
0
6
=1
08 +8
1+64
1+660
7.8
1
8
74 EXISTING FENCE
+5
+473.5
C5
.41
78
PT
74
اخ
هخ
ر
1+
یهی
73
=1
.3
EXISTNG FEATURES
PT
CEP
=
+8
77.
PC
=1
67
PC= 1
1+
1+
C4
اخ
هخ
.17
1+ 4
ر
7 CONNECTING LOCAL
اخ
یهی
+5
هخ
ر
580 5.4
یهی
88
PC
64
78
9 ROADS CULVERT
+7
0
PT =
=1
.36
PC
C4
=1
1+
+8
=
C36 PT CP
57
CONCRETE POLE
1+
7
CEP
.47
55
0
CEP
CEP
2.5
C5
9 TREE
C3
PC= 1+5
1
PT
PT= 1+824.53
PC= 1+830.68
7 PT= 1+525.93
1+
4.8
=1
00
PT
80
1+
+51
اخ
8
هخ
=
+5
ر
CEP
یهی
1+ 3 0
1+4
1+
81
56
330.
=1
1+
7.0 20
83
CEP
0
=
8.8
9
PC
PC
5
C4
00
0 10 20
CEP
1+5
Meters
1+
1+
54
20
84
CEP
Length Delta Angle Curve # Radius Length PI Station Start Station End Station Delta Angle
1+520
CEP
0
1+8
BM BM
21 17
اخ
0
هخ
ر
یهی
1+520.0
C45 50.70 0.48 1+741.86 1+741.62 1+742.10 0.55 C40 23.13 6.73 1+577.74 1+574.36 1+581.08 16.66
AT STA H LINE - 5
C44 134.44 16.99 1+726.46 1+717.96 1+734.95 7.24 C39 99.67 11.85 1+558.44 1+552.51 1+564.36 6.81
TION -
C43 36.56 6.08 1+667.04 1+663.99 1+670.08 9.53 C38 12.44 6.90 1+533.73 1+530.20 1+537.09 31.76
MATC
C42 12.44 4.18 1+643.12 1+641.01 1+645.19 19.24 C37 20.42 11.06 1+520.54 1+514.87 1+525.93 31.05
C41 9.30 14.42 1+608.51 1+599.40 1+613.82 88.79 C36 20.42 4.15 1+475.67 1+473.58 1+477.73 11.64
Status:
Lc=11.06 Lc=11.85 L=10.00Lc=6.73 Lc=14.42 L=5.87
Lc=3.02 L=18.31 Lc=4.18 Lc=6.08 Lc=16.99 Lc=0.48 FINAL DESIGN
HORIZANTAL GEOMETRY
Lc=6.90 L=15.42
L=4.27 L=18.32 L=18.81 L=47.88 L=6.67L=5.68 Lc=12.08 L=28.00 Lc=7.60 L=18.47 Lc=10.58
R=20.42 R=12.44 R=99.67 R=23.13 R=9.30 R=21.00 R=12.44 R=36.56 R=134.44 R=50.70 R=16.57 R=31.14 R=12.44 Project Code
G=-1.99%
VERTICAL GEOMETRY Drawing Number Revision
L=454.57
PP- (5) 00
747.78
PC= 1+
= 1+
PT C48 12.44 10.58 1+819.58 1+813.94 1+824.53 48.74 C54 52.53 9.81 2+002.56 1+997.64 2+007.45 10.70
LEGENEDS
C47 31.14 7.60 1+791.69 1+787.86 1+795.47 13.99 C53 46.30 19.57 1+979.31 1+969.38 1+988.95 24.22 CENTER-LINE
0
76
PC= 2+06
PC=
2
PROPOSED CANAL
.9
C51 28.00 10.98 1+879.97 1+874.41 1+885.39 22.46
8.83
PT= 2+03
+919
98 90
PT=
1+89
4.
ROW OF CANAL
.86
09
.6 0
CEP
0.52
87
PC=
PT= 1
PC = 2+
1
7 C57
6
EXISTNG DRIAN
+885
+
.26 CEP
+0
=1
PT
0
78
8.81
=2
2+02
PC C56
BM
14
BOUNDARY WALL
1+ C52
.39
PT=
BM
16
PC
CE
PC= 1+997.
CEPP
4.90
=
PT= 1+988.
C4
EDGE OF ROAD
2+080
969.3
2+00
1+
5.47
C58
87
79
PT
1+
C55
1+900
7
4.4
2+060
PT= 1 0
=1
7.45
0
10 EXISTING FENCE
1+
C5
CEP
3.50
1+92
PT= 2+10
+8
2+
PC
PC=
2+040
67
64
EXISTNG FEATURES
=1
95
.17
CEP
0
+85
1+8
0
1+94
CONNECTING LOCAL
+80 C54
0
CEP
7.4
1
2+02
ROADS CULVERT
C53
80
4.53
7
0
PT
0
C5
0.68
1+96
1+82
CP CONCRETE POLE
=1
2+000
4
13.9
1+83
1+8
+83
1+980
PC=
CEP
PT=
TREE
8.
C4
CEP
2+120
CEP
1+
PC=
85
BM
15
8 86 CURVE TABLE BENCH MARK
0
C49 INE - 7
MATCH L
.00
824 0
- 1+ +82
0
Curve # Radius Length PI Station Start Station End Station Delta Angle
- 2+128.0
CEP
ION NE 1- 6
1+8
A T IO N
AT ST
0 10 20
BM
17
40
.44
Meters
5.65
C59
C60 31.24 6.65 2+163.36 2+160.03 2+166.68 12.19 PC= 2+2+13
140
LI
PT=
AT S ATCH
CEP
C59 18.20 4.79 2+138.06 2+135.65 2+140.44 15.07 40
2+1
TAT
BM
M
13
C58 7.57 4.90 2+101.14 2+098.60 2+103.50 37.06
C6
60 K=334.07 PT=
2+1
0
PVI STA=1+928.07
BVCS= 2+097.18
BVCE= 1858.68
PVI ELEV=1861.46
LVC=34.64
K=98.44
1864
BVCS= 1+910.76
EVCS= 1+945.39
Date Revision Details Drawn
BVCE= 1861.80
EVCE= 1861.18
-1.64%
1863 1860 ISLAMIC REPUBLIC OF
AFGHANISTAN
1861 1858
1860 1857
Project Name:
Drawing Title:
1858 1855
FINAL PLAN& PROFILE
Status:
Lc=10.58 Lc=8.17 Lc=9.70 L=7.24 Lc=10.98 L=10.87 Lc=23.66 Lc=19.57 L=8.69 Lc=9.81 Lc=13.92 Lc=26.16 Lc=6.08 Lc=4.90 FINAL DESIGN
HORIZANTAL GEOMETRY L=6.15 L=18.62 L=49.46 L=17.45 L=21.71 L=2.14 L=3.70 L=32.15
R=12.44 R=9.36 R=54.68 R=28.00 R=38.74 R=46.30 R=52.53 R=92.54 R=2543.02 R=6.49 R=7.57
Project Code
-8 1
PC= 2+098.60 otherwise indicated.
0
CH L - 2+432.
C70 7.57 0.35 ??? ??? ??? 2.66
EP=
INE
3.5
C69 36.93 18.72 2+386.56 2+377.00 2+395.71 29.03 LEGENEDS
10
N
CCEE
2+46
2+
PP
O
CENTER-LINE
C58
=
I
PT
TAT
1.52
BM14
EXISTING ROAD
T
PC= 2+281.95
PT= 2+279.49
A
7.62
C67 66.02 14.60 2+320.87 2+313.54 2+328.14 12.67 CENTER-LINE
AT S
M
2+100
PT= 2+29
PROPOSED CANAL
PT=
.55
C66 44.19 10.93 2+303.11 2+297.62 2+308.55 14.18
P C=
4
ROW OF CANAL
2+42
8
13.5
+30
2+ 4
PC
CE
8.14
2+
2++44660
P
2
54
EXISTNG DRIAN
3.75
2
CE
=2
2+3
08
40..64
20.1
P
PT=
BM1
1
PT= 2+32
C65
+2
0
9.83
2+1135
BOUNDARY WALL
PC=
6
C66
PT=
2
C64
0
4.9
PT== 2+
0
PT= 2+362.1
0
PC= 2+34
12
2
C72
PC= 2+377.0
2+44
EDGE OF ROAD
PC
2
2+
CE
+39
PPT C=
2+280
3
P
C5
8
60.0
C67
2+300
+166.6
= 2 2+
5
9
0
EXISTING FENCE
.71
+2 247
Resid
2+1
ential
Buildi
ng
49 .59
2+4
.88
BM13
EXISTNG FEATURES
PT = 2
PC=
CE
C68
0
CE هخاخ P CE
40
CE
20
یهی ر
2+32
P
16
هخاخ
2+
0
یهی ر
P CE P CONNECTING LOCAL
3
T= 2++220046..5
C69
P
PT
2+1
74
C6
26
C60
2+340
CE ROADS CULVERT
=
P
2+4
7.
0
2+
PC= 2+21
2+360
23
PPC= 2
CP CONCRETE POLE
00
1.1
2+380
60
5
TREE
2+1
Resid
ential
Buildi BM10
ng
CE
C61
2+
P
2+180
C62
24
BENCH MARK
0
CE
P
2+200
هخاخ
یهی ر
2+220
CE
P BM12
CURVE TABLE 0 10 20
Meters
Curve # Radius Length PI Station Start Station End Station Delta Angle
PVI STA=2+157.86
PVI ELEV=1857.69
LVC=121.35
Date Revision Details Drawn
K=334.07
EVCS= 2+218.53
AFGHANISTAN
-1.28%
1856 1854
1855 1853
Project Name:
Drawing Title:
1853 1851
FINAL PLAN& PROFILE
Status:
+281.9
2
+
+26
PT= 2
+29 54
4.92
2
= 2 95.
7.6
NOTE:
PC = 2+2
C64 1. All dimensions are in meters unless
C65 BM
PT
11
otherwise indicated.
CE
5
P
8.5
2+280
0
+3
C6
4
3.5
2+2
=2
6
31
PT
2+
60
LEGENEDS
4
00
8.1
PC
CENTER-LINE
2+3
+ 32
EXISTING ROAD
=2
C6 CENTER-LINE
PT
7 PROPOSED CANAL
3
9. 8
0
+34
32
ROW OF CANAL
9
2+
=2
62.1
EXISTNG DRIAN
PC
2+3
Re
EP= 2+461.52
sid
en
tial
BOUNDARY WALL
Bu
ildi
PT= 2+423.75
ng
PC= 2+420.10
0
CE
PT=
40
PT= 2+395.71
C68
77.0
P
EDGE OF ROAD
2+3
2+3
اخ
هخ
PC=
ر
EXISTING FENCE
یهی
60
BM
9
EXISTNG FEATURES
2+3
Re
C72
sid
C69
en
tial
Bu
ildi
CONNECTING LOCAL
CE
CE
ng
P
P
ROADS CULVERT
CE
P
2+462
2+460
CCEEP
80
2+440
2+420
CP
CE
P
CCEEP
CONCRETE POLE
CE
2+400
P
2+3
P
P
BM
10 TREE
اخ
اخ
هخ
ر
BENCH MARK
هخ یهی
ر
یهی
CE
CURVE TABLE
P
0 10 20
اخ
هخ
ر
یهی
Meters
AT STATION - 2+432.01
C80 21.00 3.02 1+621.19 1+619.68 1+622.70 8.23
CE
MATCH LINE - 8
CE
P
C79 21.00 6.54 0+746.72 0+743.42 0+749.96 17.83
اخ
هخ
ر
یهی
اخ
هخ
ر
یهی
CE
P
C76 21.00 14.87 0+490.58 0+482.81 0+497.68 40.57
CE
P
Date Revision Details Drawn
1852
1851
Project Name:
Drawing Title:
1849
1851.310 1853.810 1853.1002+461.520
1851.687 1854.187 1853.839 2+432
Status:
Project Code
G=-1.28%
VERTICAL GEOMETRY Drawing Number Revision
L=243.00
PP- (8) 00
OFFSET
OFFSET
OFFSET
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
1917
1918
1919
1923
1925
1916
1917
1918
1919
1923
1915
1916
1917
1918
1919
1920
1922
1924
1920
1922
1920
1922
1921
1921
1921
4.00%
4.00%
4.00%
STATION=0+000
STATION=0+020
STATION=0+040
OFFSET
OFFSET
OFFSET
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
1914
1915
1916
1917
1918
1919
1920
1913
1914
1915
1916
1917
1918
1919
1920
1913
1914
1915
1916
1917
1918
1919
1912
1921
-12.000 1918.327 -12.000 1916.780 -12.000 1915.592
4.00%
4.00%
4.00%
STATION=0+060
STATION=0+080
STATION=0+100
OFFSET
OFFSET
OFFSET
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
1912
1913
1914
1915
1916
1917
1918
1910
1912
1913
1914
1915
1916
1917
1909
1910
1912
1913
1914
1915
1916
1911
1911
1911
Status:
NOTE:
Drawn by:
Rev. Date
Checked by:
Designed by:
Project Code
Designed by:
Project Name:
Drawing Title:
Drawing Number
4/10/2021
Moh. Yahia Safari
Ghulam Hazrat Rezai
Ghulam Hazrat Rezai
CS - (1)
Revision Details
AFGHANISTAN
Scale:
otherwise indicated.
Signature:
Signature:
Signature:
ISLAMIC REPUBLIC OF
CROSS SECTION
FINAL DESIGN
1:200
1. All dimensions are in meters unless
00
KABUL MUNICIPALITY
Revision
Drawn Chkd. Appd.
OFFSET
OFFSET
OFFSET
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
1908
1909
1913
1915
1907
1908
1909
1913
1906
1907
1908
1909
1913
1910
1912
1914
1910
1912
1914
1910
1912
1914
1911
1911
1911
-12.000 1912.651 -12.000 1911.494 -12.000 1911.177
4.00%
4.00%
4.00%
-4.000 1912.181 1912.128 -4.000 1911.305 1911.257 -4.000 1910.985 1910.429
STATION=0+180
STATION=0+200
STATION=0+220
OFFSET
OFFSET
OFFSET
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
1905
1906
1907
1908
1909
1910
1913
1905
1906
1907
1908
1909
1910
1904
1905
1906
1907
1908
1909
1910
1912
1912
1911
1911
1911
4.00%
4.00%
4.00%
STATION=0+240
STATION=0+260
STATION=0+280
OFFSET
OFFSET
OFFSET
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
1903
1904
1905
1906
1907
1908
1909
1910
1903
1904
1905
1906
1907
1908
1909
1903
1904
1905
1906
1907
1908
1909
1902
1902
Status:
NOTE:
Drawn by:
Rev. Date
Checked by:
Designed by:
Project Code
Designed by:
Project Name:
Drawing Title:
Drawing Number
4/10/2021
Moh. Yahia Safari
Ghulam Hazrat Rezai
Ghulam Hazrat Rezai
CS - (2)
Revision Details
AFGHANISTAN
Scale:
otherwise indicated.
Signature:
Signature:
Signature:
ISLAMIC REPUBLIC OF
CROSS SECTION
FINAL DESIGN
1:200
1. All dimensions are in meters unless
00
KABUL MUNICIPALITY
Revision
Drawn Chkd. Appd.
OFFSET
OFFSET
OFFSET
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
1903
1905
1906
1907
1908
1903
1905
1906
1907
1899
1903
1905
1906
1902
1904
1900
1902
1904
1900
1902
1904
1901
1901
1901
-12.000 1905.491 -12.000 1904.578 -12.000 1903.588
4.00%
4.00%
4.00%
STATION=0+360
STATION=0+380
STATION=0+400
OFFSET
OFFSET
OFFSET
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
1899
1900
1903
1904
1905
1906
1898
1899
1900
1903
1904
1905
1897
1898
1899
1900
1903
1904
1902
1902
1902
1901
1901
1901
4.00%
4.00%
4.00%
STATION=0+420
STATION=0+440
STATION=0+460
OFFSET
OFFSET
OFFSET
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
1897
1898
1899
1900
1903
1896
1897
1898
1899
1900
1903
1895
1896
1897
1898
1899
1900
1903
1902
1902
1902
1901
1901
1901
Status:
NOTE:
Drawn by:
Rev. Date
Checked by:
Designed by:
Project Code
Designed by:
Project Name:
Drawing Title:
Drawing Number
4/10/2021
Moh. Yahia Safari
Ghulam Hazrat Rezai
Ghulam Hazrat Rezai
CS - (3)
Revision Details
AFGHANISTAN
Scale:
otherwise indicated.
Signature:
Signature:
Signature:
ISLAMIC REPUBLIC OF
CROSS SECTION
FINAL DESIGN
1:200
1. All dimensions are in meters unless
00
KABUL MUNICIPALITY
Revision
Drawn Chkd. Appd.
OFFSET
OFFSET
OFFSET
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
1895
1896
1897
1898
1899
1900
1902
1894
1895
1896
1897
1898
1899
1900
1893
1894
1895
1896
1897
1898
1899
1900
1901
1901
-12.000 1899.173 -12.000 1898.633 -12.000 1897.852
4.00%
-4.000 1898.167 1898.664 -4.000 1897.674 1897.970 -4.000 1896.690 1897.275
4.00%
-3.000 1898.151 1898.624 -3.000 1897.650 1897.930 -3.000 1896.722 1897.235
STATION=0+540
STATION=0+560
STATION=0+580
OFFSET
OFFSET
OFFSET
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
1895
1895
1895
1892
1893
1894
1896
1897
1898
1899
1892
1893
1894
1896
1897
1898
1899
1892
1893
1894
1896
1897
1898
1891
4.00%
4.00%
STATION=0+600
STATION=0+620
STATION=0+640
OFFSET
OFFSET
OFFSET
EXISTING ELEVATIONS
EXISTING ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
FINISHED ELEVATIONS
FINISHED ELEVATIONS
1895
1895
1895
1890
1892
1893
1894
1896
1897
1889
1890
1892
1893
1894
1896
1897
1889
1890
1892
1893
1894
1896
1891
1891
1891
Status:
NOTE:
Drawn by:
Rev. Date
Checked by:
Designed by:
Project Code
Designed by:
Project Name:
Drawing Title:
Drawing Number
4/10/2021
Moh. Yahia Safari
Ghulam Hazrat Rezai
Ghulam Hazrat Rezai
CS - (4)
Revision Details
AFGHANISTAN
Scale:
otherwise indicated.
Signature:
Signature:
Signature:
ISLAMIC REPUBLIC OF
CROSS SECTION
FINAL DESIGN
1:200
1. All dimensions are in meters unless
00
KABUL MUNICIPALITY
Revision
Drawn Chkd. Appd.
OFFSET
OFFSET
OFFSET
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
1888
1889
1890
1893
1894
1895
1887
1888
1889
1890
1893
1894
1886
1887
1888
1889
1890
1893
1892
1892
1892
1891
1891
1891
-12.000 1892.826 -12.000 1891.353 -12.000 1890.861
4.00%
4.00%
4.00%
STATION=0+720
STATION=0+740
STATION=0+760
OFFSET
OFFSET
OFFSET
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
1885
1886
1887
1888
1889
1890
1893
1884
1885
1886
1887
1888
1889
1890
1884
1885
1886
1887
1888
1889
1890
1892
1892
1891
1891
1891
4.00%
4.00%
4.00%
STATION=0+780
STATION=0+800
STATION=0+820
OFFSET
OFFSET
OFFSET
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
1883
1884
1885
1886
1887
1888
1889
1890
1882
1883
1884
1885
1886
1887
1888
1889
1890
1882
1883
1884
1885
1886
1887
1888
1889
Status:
NOTE:
Drawn by:
Rev. Date
Checked by:
Designed by:
Project Code
Designed by:
Project Name:
Drawing Title:
Drawing Number
4/10/2021
Moh. Yahia Safari
Ghulam Hazrat Rezai
Ghulam Hazrat Rezai
CS - (5)
Revision Details
AFGHANISTAN
Scale:
otherwise indicated.
Signature:
Signature:
Signature:
ISLAMIC REPUBLIC OF
CROSS SECTION
FINAL DESIGN
1:200
1. All dimensions are in meters unless
00
KABUL MUNICIPALITY
Revision
Drawn Chkd. Appd.
OFFSET
OFFSET
OFFSET
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
1883
1884
1885
1886
1887
1888
1889
1883
1884
1885
1886
1887
1888
1880
1883
1884
1885
1886
1887
1882
1882
1882
1881
1881
1881
-12.000 1884.810 -12.000 1884.110 -12.000 1883.734
4.00%
4.00%
4.00%
STATION=0+900
STATION=0+920
STATION=0+940
OFFSET
OFFSET
OFFSET
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
1879
1880
1883
1884
1885
1886
1887
1879
1880
1883
1884
1885
1886
1878
1879
1880
1883
1884
1885
1886
1882
1882
1882
1881
1881
1881
4.00%
4.00%
4.00%
STATION=0+960
STATION=0+980
STATION=1+000
OFFSET
OFFSET
OFFSET
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
1878
1879
1880
1882
1883
1884
1885
1877
1878
1879
1880
1882
1883
1884
1877
1878
1879
1880
1882
1883
1884
1881
1881
1881
4.00%
Status:
NOTE:
Drawn by:
Rev. Date
Checked by:
Designed by:
Project Code
Designed by:
Project Name:
Drawing Title:
Drawing Number
4/10/2021
Moh. Yahia Safari
Ghulam Hazrat Rezai
Ghulam Hazrat Rezai
CS - (6)
Revision Details
AFGHANISTAN
Scale:
otherwise indicated.
Signature:
Signature:
Signature:
ISLAMIC REPUBLIC OF
CROSS SECTION
FINAL DESIGN
1:200
1. All dimensions are in meters unless
00
KABUL MUNICIPALITY
Revision
Drawn Chkd. Appd.
OFFSET
OFFSET
OFFSET
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
1875
1876
1877
1878
1879
1880
1882
1883
1884
1876
1877
1878
1879
1880
1882
1883
1876
1877
1878
1879
1880
1882
1883
1881
1881
1881
4.00%
-4.000 1880.086 1880.300 -4.000 1879.246 1879.774 -4.000 1878.586 1879.255
4.00%
4.00%
STATION=1+080
STATION=1+100
STATION=1+120
OFFSET
OFFSET
OFFSET
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
1875
1878
1879
1875
1878
1879
1875
1878
1879
1876
1877
1880
1882
1874
1876
1877
1880
1882
1874
1876
1877
1880
1881
1881
1881
4.00%
-3.000 1878.176 1878.703 -3.000 1877.740 1878.198 -3.000 1877.346 1877.696
4.00%
4.00%
STATION=1+140
STATION=1+160
STATION=1+180
OFFSET
OFFSET
OFFSET
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
1873
1875
1876
1877
1878
1879
1873
1875
1876
1877
1878
1879
1873
1875
1876
1877
1878
1879
1874
1880
1874
1880
1872
1874
1880
4.00%
Status:
NOTE:
Drawn by:
Rev. Date
Checked by:
Designed by:
Project Code
Designed by:
Project Name:
Drawing Title:
Drawing Number
4/10/2021
Moh. Yahia Safari
Ghulam Hazrat Rezai
Ghulam Hazrat Rezai
CS - (7)
Revision Details
AFGHANISTAN
Scale:
otherwise indicated.
Signature:
Signature:
Signature:
ISLAMIC REPUBLIC OF
CROSS SECTION
FINAL DESIGN
1:200
1. All dimensions are in meters unless
00
KABUL MUNICIPALITY
Revision
Drawn Chkd. Appd.
OFFSET
OFFSET
OFFSET
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
1873
1874
1875
1876
1877
1878
1879
1873
1874
1875
1876
1877
1878
1873
1874
1875
1876
1877
1878
1872
1872
1872
1871
1871
-12.000 1876.443 -12.000 1875.463 -12.000 1875.338
4.00%
4.00%
4.00%
STATION=1+260
STATION=1+280
STATION=1+300
OFFSET
OFFSET
OFFSET
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
1870
1873
1874
1875
1876
1877
1878
1870
1873
1874
1875
1876
1877
1869
1870
1873
1874
1875
1876
1872
1872
1872
1871
1871
1871
4.00%
-4.000 1873.569 1874.216 -4.000 1873.477 1873.714 -4.000 1872.908 1873.211
4.00%
4.00%
STATION=1+320
STATION=1+340
STATION=1+360
OFFSET
OFFSET
OFFSET
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
1869
1870
1872
1873
1874
1875
1876
1868
1869
1870
1872
1873
1874
1875
1876
1868
1869
1870
1872
1873
1874
1875
1871
1871
1871
Status:
NOTE:
Drawn by:
Rev. Date
Checked by:
Designed by:
Project Code
Designed by:
Project Name:
Drawing Title:
Drawing Number
4/10/2021
Moh. Yahia Safari
Ghulam Hazrat Rezai
Ghulam Hazrat Rezai
CS - (8)
Revision Details
AFGHANISTAN
Scale:
otherwise indicated.
Signature:
Signature:
Signature:
ISLAMIC REPUBLIC OF
CROSS SECTION
FINAL DESIGN
1:200
1. All dimensions are in meters unless
00
KABUL MUNICIPALITY
Revision
Drawn Chkd. Appd.
OFFSET
OFFSET
OFFSET
EXISTING ELEVATIONS
EXISTING ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
FINISHED ELEVATIONS
FINISHED ELEVATIONS
1875
1867
1868
1869
1870
1872
1873
1874
1867
1868
1869
1870
1872
1873
1874
1866
1867
1868
1869
1870
1872
1873
1874
1871
1871
-12.000 1872.137 -12.000 1871.710 -12.000 1871.408 1871
4.00%
4.00%
4.00%
-3.000 1871.176 1871.312 -3.000 1870.807 1870.906 -3.000 1870.281 1870.508
STATION=1+440
STATION=1+460
STATION=1+480
OFFSET
OFFSET
OFFSET
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
1868
1869
1868
1869
1865
1868
1869
1866
1867
1870
1872
1873
1866
1867
1870
1872
1873
1866
1867
1870
1872
1871
1871
1871
4.00%
-4.000 1869.975 1870.149 -4.000 1869.607 1869.751 -4.000 1869.201 1869.352
4.00%
4.00%
STATION=1+500
STATION=1+520
STATION=1+540
OFFSET
OFFSET
OFFSET
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
1865
1866
1867
1868
1869
1865
1866
1867
1868
1869
1865
1866
1867
1868
1869
1870
1872
1864
1870
1872
1864
1870
1871
1871
1871
Status:
NOTE:
Drawn by:
Rev. Date
Checked by:
Designed by:
Project Code
Designed by:
Project Name:
Drawing Title:
Drawing Number
4/10/2021
Moh. Yahia Safari
Ghulam Hazrat Rezai
Ghulam Hazrat Rezai
CS - (9)
Revision Details
AFGHANISTAN
Scale:
otherwise indicated.
Signature:
Signature:
Signature:
ISLAMIC REPUBLIC OF
CROSS SECTION
FINAL DESIGN
1:200
1. All dimensions are in meters unless
00
KABUL MUNICIPALITY
Revision
Drawn Chkd. Appd.
OFFSET
OFFSET
OFFSET
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
1864
1865
1866
1867
1868
1869
1870
1863
1864
1865
1866
1867
1868
1869
1870
1863
1864
1865
1866
1867
1868
1869
1870
1871
-12.000 1868.159 -12.000 1867.522 -12.000 1866.933
4.00%
4.00%
4.00%
-3.000 1867.015 1867.718 -3.000 1866.814 1867.319 -3.000 1866.191 1866.921
STATION=1+620
STATION=1+640
STATION=1+660
OFFSET
OFFSET
OFFSET
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
1862
1863
1864
1865
1866
1867
1868
1869
1870
1862
1863
1864
1865
1866
1867
1868
1869
1862
1863
1864
1865
1866
1867
1868
1869
4.00%
4.00%
4.00%
STATION=1+680
STATION=1+700
STATION=1+720
OFFSET
OFFSET
OFFSET
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
1865
1865
1865
1862
1863
1864
1866
1867
1868
1869
1862
1863
1864
1866
1867
1868
1860
1862
1863
1864
1866
1867
1868
1861
1861
1861
Status:
NOTE:
Drawn by:
Rev. Date
Checked by:
Designed by:
Project Code
Designed by:
Project Name:
Drawing Title:
Drawing Number
4/10/2021
Moh. Yahia Safari
Ghulam Hazrat Rezai
Ghulam Hazrat Rezai
Revision Details
CS - (10)
AFGHANISTAN
Scale:
otherwise indicated.
Signature:
Signature:
Signature:
ISLAMIC REPUBLIC OF
CROSS SECTION
FINAL DESIGN
1:200
1. All dimensions are in meters unless
00
KABUL MUNICIPALITY
Revision
Drawn Chkd. Appd.
OFFSET
OFFSET
OFFSET
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
1865
1865
1859
1865
1860
1862
1863
1864
1866
1867
1860
1862
1863
1864
1866
1867
1860
1862
1863
1864
1866
1867
1861
1861
1861
-12.000 1864.721 -12.000 1864.521 -12.000 1864.342
4.00%
-4.000 1864.396 1864.171 -4.000 1863.386 1863.773 -4.000 1862.975 1863.374
4.00%
4.00%
-2.000 1863.702 1864.091 -2.000 1863.357 1863.693 -2.000 1863.082 1863.294
STATION=1+800
STATION=1+820
STATION=1+840
OFFSET
OFFSET
OFFSET
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
1859
1863
1865
1866
1858
1859
1863
1865
1866
1858
1859
1863
1865
1866
1860
1862
1864
1860
1862
1864
1860
1862
1864
1861
1861
1861
4.00%
-3.000 1862.641 1862.936 -3.000 1862.606 1862.537 -3.000 1861.981 1862.139
4.00%
STATION=1+860
STATION=1+880
STATION=1+900
OFFSET
OFFSET
OFFSET
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
1858
1859
1860
1863
1864
1865
1857
1858
1859
1860
1863
1864
1865
1857
1858
1859
1860
1863
1864
1862
1862
1862
1861
1861
1861
4.00%
4.00%
Status:
NOTE:
Drawn by:
Rev. Date
Checked by:
Designed by:
Project Code
Designed by:
Project Name:
Drawing Title:
Drawing Number
4/10/2021
Moh. Yahia Safari
Ghulam Hazrat Rezai
Ghulam Hazrat Rezai
Revision Details
CS - (11)
AFGHANISTAN
Scale:
otherwise indicated.
Signature:
Signature:
Signature:
ISLAMIC REPUBLIC OF
CROSS SECTION
FINAL DESIGN
1:200
1. All dimensions are in meters unless
00
KABUL MUNICIPALITY
Revision
Drawn Chkd. Appd.
OFFSET
OFFSET
OFFSET
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
1857
1858
1859
1863
1856
1857
1858
1859
1863
1856
1857
1858
1859
1863
1860
1862
1864
1860
1862
1864
1860
1862
1861
1861
1861
-12.000 1861.575 -12.000 1861.192 -12.000 1860.553
4.00%
-4.000 1860.938 1860.768 -4.000 1860.728 1860.439 -4.000 1860.067 1860.111
4.00%
4.00%
STATION=1+980
STATION=2+000
STATION=2+020
OFFSET
OFFSET
OFFSET
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
1856
1857
1858
1859
1860
1863
1855
1856
1857
1858
1859
1860
1863
1855
1856
1857
1858
1859
1860
1863
1862
1862
1862
1861
1861
1861
4.00%
-1.000 1859.363 1859.663 4.00% -1.000 1859.055 1859.335 -1.000 1858.777 1859.007
OFF=0.000 OFF=0.000 OFF=0.000
0.000 1859.358 1859.623 0.000 1859.075 1859.295 0.000 1858.765 1858.967
ELE=1859.623 ELE=1859.295 ELE=1858.967
1.000 1859.592 1859.623 1.000 1859.274 1859.295 1.000 1858.834 1858.967
STATION=2+040
STATION=2+060
STATION=2+080
OFFSET
OFFSET
OFFSET
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
1855
1856
1857
1858
1859
1860
1863
1854
1855
1856
1857
1858
1859
1860
1854
1855
1856
1857
1858
1859
1860
1862
1862
1861
1861
1861
Status:
NOTE:
Drawn by:
Rev. Date
Checked by:
Designed by:
Project Code
Designed by:
Project Name:
Drawing Title:
Drawing Number
4/10/2021
Moh. Yahia Safari
Ghulam Hazrat Rezai
Ghulam Hazrat Rezai
Revision Details
CS - (12)
AFGHANISTAN
Scale:
otherwise indicated.
Signature:
Signature:
Signature:
ISLAMIC REPUBLIC OF
CROSS SECTION
FINAL DESIGN
1:200
1. All dimensions are in meters unless
00
KABUL MUNICIPALITY
Revision
Drawn Chkd. Appd.
OFFSET
OFFSET
OFFSET
EXISTING ELEVATIONS
EXISTING ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
FINISHED ELEVATIONS
FINISHED ELEVATIONS
1855
1858
1859
1855
1858
1859
1855
1858
1859
1854
1856
1857
1860
1853
1854
1856
1857
1860
1853
1854
1856
1857
1860
1861
1861
1861
4.00%
4.00%
4.00%
STATION=2+160
STATION=2+180
STATION=2+200
OFFSET
OFFSET
OFFSET
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
1855
1858
1859
1855
1858
1859
1855
1858
1859
1853
1854
1856
1857
1860
1853
1854
1856
1857
1860
1852
1853
1854
1856
1857
1860
4.00%
4.00%
4.00%
STATION=2+220
STATION=2+240
STATION=2+260
OFFSET
OFFSET
OFFSET
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
1853
1854
1855
1856
1857
1858
1859
1860
1853
1854
1855
1856
1857
1858
1859
1860
1853
1854
1855
1856
1857
1858
1859
1852
1852
1852
Status:
NOTE:
Drawn by:
Rev. Date
Checked by:
Designed by:
Project Code
Designed by:
Project Name:
Drawing Title:
Drawing Number
4/10/2021
Moh. Yahia Safari
Ghulam Hazrat Rezai
Ghulam Hazrat Rezai
Revision Details
CS - (13)
AFGHANISTAN
Scale:
otherwise indicated.
Signature:
Signature:
Signature:
ISLAMIC REPUBLIC OF
CROSS SECTION
FINAL DESIGN
1:200
1. All dimensions are in meters unless
00
KABUL MUNICIPALITY
Revision
Drawn Chkd. Appd.
OFFSET
OFFSET
OFFSET
EXISTING ELEVATIONS
EXISTING ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
FINISHED ELEVATIONS
FINISHED ELEVATIONS
1855
1858
1859
1855
1858
1855
1858
1852
1853
1854
1856
1857
1852
1853
1854
1856
1857
1852
1853
1854
1856
1857
1851
1851
1851
-12.000 1856.269 -12.000 1855.985 -12.000 1855.642
4.00%
4.00%
-2.000 1854.829 1855.443 -2.000 1854.579 1855.187 -2.000 1854.360 1854.932
STATION=2+340
STATION=2+360
STATION=2+380
OFFSET
OFFSET
OFFSET
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
EXISTING ELEVATIONS
FINISHED ELEVATIONS
1855
1858
1855
1858
1855
1852
1853
1854
1856
1857
1850
1852
1853
1854
1856
1857
1850
1852
1853
1854
1856
1857
1851
1851
1851
4.00%
-3.000 1854.075 1854.716 -3.000 1853.842 1854.461 -3.000 1853.596 1854.205
4.00%
STATION=2+400
STATION=2+420
STATION=2+440
OFFSET
EXISTING ELEVATIONS
FINISHED ELEVATIONS
1850
1853
1854
1855
1856
1857
1852
1851
-12.000 1854.349
-11.000 1854.371
-10.000 1854.393
-9.000 1854.415
-8.000 1854.437
OFF=-7.471
ELE=1854.129
-7.000 1854.312 1854.110
OFF=2.000
2.000 1853.267 1853.830
ELE=1853.830
3.000 1853.343
Date:
Status:
NOTE:
Drawn by:
Rev. Date
Checked by:
Designed by:
Project Code
Designed by:
Project Name:
Drawing Title:
Drawing Number
4/10/2021
Moh. Yahia Safari
Ghulam Hazrat Rezai
Ghulam Hazrat Rezai
Revision Details
CS - (14)
AFGHANISTAN
Scale:
otherwise indicated.
Signature:
Signature:
Signature:
ISLAMIC REPUBLIC OF
CROSS SECTION
FINAL DESIGN
1:200
1. All dimensions are in meters unless
00
KABUL MUNICIPALITY
Revision
Drawn Chkd. Appd.
NOTE:
ISLAMIC REPUBLIC OF
AFGHANISTAN
Designed by:
KABUL MUNICIPALITY
DESIGN TEAM
Project Name:
Drawing Title:
Date: Scale:
4/10/2021 1:200
Status:
FINAL DESIGN
Project Code
ST-01 00