You are on page 1of 5

Date: September 14, 2021

From: Guillermo A. Riviere Dept. TECH BTHL

To: Chinnachot Thitiworachin (chinnachot_t@inteqc.com)

Peechanon Bumrerrach (peechanon_b@inteqc.com)

Praphan (praphan_r@inteqc.com)

Sujitra (sujitra_p@inteqc.com)

CC to: Bhadharapongbhanu Chanuchporn,


chanuchporn.bhadharapongbhanu@buhlergroup.com
Mark Ledson, mark.ledson@buhlergroup.com

Inteqc Flour Mill

Flour Mill Health Check

1
Mill Health Check
Flour Mill Health Check

Intake / Raw wheat silos:

• Assessing of machinery installed, (year, condition, capacity)


• Scale calibration, control, maintenance and spare parts advice
• Flow balancer calibration, control, maintenance and spare parts advice
• Pre-cleaning machine control, maintenance and spare parts advice
• Flowsheet control
• Advice of spare parts or improvements in process

Cleaning section:

• Assessing of machinery installed, (year, condition, capacity)


• Elevator, screw conveyors, chain conveyors, silos
• Scale calibration, control, maintenance and spare parts advice
• Flow balancer calibration, control, maintenance and spare parts advice
• Cleaning machine control, maintenance and spare parts advice
• Moisture equipment calibration, control, maintenance and spare parts advice
• Filters, control, maintenance and spare parts advice
• Flowsheet control
• Record of feedback for improvements
• Advice of spare parts or improvements in process

Mill Section

• Assessing of machinery installed, (year, condition, capacity)


• Elevator, screw conveyors, chain conveyors, silos
• Scale calibration, control, maintenance and spare parts advice
• Rollermill condition, control, maintenance and spare parts advice
• Plansifter check
• Purifier check
• Pneumatic lines check
• Impact detachers
• Evaluation of mill performance
• Advice of spare parts or improvements in process

2
Mill Health Check
Finish Product

• Assessing of machinery installed, (year, condition, capacity)


• Filters, control, maintenance and spare parts advice
• Mixer control
• Flowsheet control
• Record of feedback for improvements
• Advice of spare parts or improvements in process

Byproducts

• Assessing of machinery installed, (year, condition, capacity)


• Filters, control, maintenance and spare parts advice
• Mixer control
• Flowsheet control
• Record of feedback for improvements
• Advice of spare parts or improvements in process

3
Mill Health Check
Schedule

MONDAY Tuesday Wednesday Thursday Friday


Morning -Water Mill inspection Mill Finish Product
calibration inspection. Inspection
-Quality Moisture
controls of: control of B1
*1st Tempered
wheat
*B1
*Flour
Afternoon Intake Moisture Mill inspection Byproducts Analysis of
inspection control of 1st Inspection observation
Tempered and Costumer
wheat enquires
Afternoon Cleaning Moisture Quality
Inspection control of 1st controls of:
Tempered *1st Tempered
wheat wheat
*B1
*Flour

Notes:

• For water calibration the cleaning system will have to be stopped.


• After calibration is performed normal tempering time (conditioning time check with
costumer) will be allowed before measurement of wheat moisture content
• For scales calibration some parts of the process will have to be suspended
• Operator will be needed for assist and training.

4
Mill Health Check
List of Required elements

For water calibration:

1. Container or bucket with capacity of at least 20 liters


2. Scale to measure the collected water
3. Hose connected to the T valve for easy calibration

For scale calibration:

1. 4 x 20 kg. weights
2. Standard weights (3kg) for MZAL and MYFE
3. Ladder in good condition to access elements at high in case needed

For Analysis:

The laboratory or laboratory equipment will have to be available to do the required analyses for
calibrations and quality controls.

• Raw wheat moisture, protein and ash content


• 1st Conditioning wheat moisture
• B1 wheat moisture
• Flour moisture and ash content

5
Mill Health Check