You are on page 1of 2

LUU NGUYEN NGOC HAN

Student ID: 611132202


Class: BM_M0200

6.16.

a) The most appropriate problem-solving tool to show and present lead time distribution
is histogram diagram.

b) The most appropriate problem-solving tool to show the root cause of problem is Cause-
and-Effect diagram.

c) The most appropriate problem-solving tool to identify which variables have the
most influence on the company’s production is Pareto chart.
d) The most appropriate problem-solving tool to check if there is a relationship
between order quantities and lead time is scatter diagram.

6s.10

σ 1.36
a) σ x = = = 0.61
√ n √5
b)
SAMPLES 1 2 3 4 5 6 7 8 9 10
AVG. OF N=5 10 10 10.2 10.2 10.4 9.8 9.6 9.8 9.8 10.2

10

∑ ( AVG of N =5) 10 ounces


i=1
x́= =¿
10
If z = 3, the control limits for the mean chart are:
UCL x =x́+ z σ x =¿ 10 + 3*0.61 = 11.83
LCL x =x́−z σ x =¿ 10 - 3*0.61 = 8.17

You might also like