You are on page 1of 1

LOAD SCHEDULE WIRING CODE : LOAD SCHEDULE WIRING CODE :

POWER SYSTEM
ONE-LINE DIAGRAM

ADVANCED COPY
FOR PERMIT/FCD

02
design architect design engineer project title Rev.No. Revision Note: Date: Checked: drawing content sheet no.
- These drawings shall be read in
conjunction with structural,

E
_______________________________ -
electrical, mechanical, plumbing/
sanitary and fire protection
location
engineering drawings.
REG. NO. - TIN NO. - PEE. NO. TIN NO. LOT 2 & 3 BLK.2 LTI ANNEX BIÑAN LAGUNA , PHILIPPINES
The Architect shall be notified of
owner/developer
PTR NO. - DATE: - PLACE: - PTR NO. DATE: PLACE: any discrepancy found and shall
- be resolved prior to construction DESIGNED BY: CHECKED BY: date printed project no.
CAD BY: APPROVED BY: -

You might also like